Projects (8,439)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn Brooklyn DEP Building systems & Modifications Preliminary and Final Approved 2019-07-15
Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Manhattan Grit Chamber, 432 East 110th Street, Manhattan Manhattan DEP Building systems & Modifications Preliminary and Final Approved 2019-07-15
Rehabilitation of the New Administration Building, 104 B Road, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan Manhattan DEP Architecture Preliminary Approved 2019-07-15
Restoration of a façade, Heckscher Building, 1230 Fifth Avenue, Manhattan Manhattan DDC Architecture Preliminary and Final Approved 2019-07-15
Installation of rooftop mechanical equipment, Mapleton Branch Library, 1702 60th Street, Brooklyn Brooklyn DDC Building systems & Modifications Preliminary and Final Approved 2019-07-15
Installation of rooftop guardrails, Mapleton Branch Library, 1702 60th Street, Brooklyn Brooklyn DDC Building systems & Modifications Preliminary and Final Approved 2019-07-15
Restoration of a façade, Ridgewood Library, 20-12 Madison Street, Ridgewood, Queens Queens DDC Building systems & Modifications Preliminary and Final Approved 2019-07-15
Construction of an entrance, outlook, and adjacent site work, Snug Harbor Cultural Center & Botanical Garden, Kissel Avenue at Linden Street, Staten Island Staten Island DCLA Landscape architecture Preliminary Approved 2019-07-15
Reconstruction of the Garden of Hope and El Coqui Community Garden (Melrose Commons Site 62), including installation of an artificial turf field, Melrose Avenue between East 162nd Street and 163rd Street, adjacent to Bronx Commons, Bronx Bronx DPR Landscape architecture Preliminary Commented 2019-07-15
Installation of the Elizabeth Cady Stanton and Susan B. Anthony Monument by Meredith Bergmann, Literary Walk, The Mall, Central Park, Manhattan Manhattan DPR Artwork Conceptual Commented 2019-07-15
Reconstruction of a portion of Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens Queens DPR Landscape architecture Commented 2019-07-15
Reconstruction of Pier 42, Phase IA, East River Waterfront between Montgomery Street and Jackson Street, Manhattan Manhattan EDC Architecture Commented 2019-06-17
Construction of an environmental learning center (Solar One), 24-20 FDR Drive at Peter Cooper Road, Manhattan Manhattan EDC Architecture Preliminary Commented 2019-06-17
Restoration of the landscape, 477 Beaverkill Road, Ashokan Reservoir campus, Olive, Ulster County Upstate DEP Landscape architecture Commented 2019-06-17
Rehabilitation of Emergency Medical Station 39 (EMS 39), 265 Pennsylvania Avenue, Brooklyn Brooklyn FDNY Architecture Commented 2019-06-17
Waterfront development plan, Sunset Park, between 28th Street, Belt Parkway, Shore Road, and the Gowanus Bay, Brooklyn Brooklyn EDC Landscape architecture Commented 2019-06-17
Design of a prototypical bus shelter for installation citywide, Citywide Citywide DOT Street Furniture Commented 2019-06-17
Installation of a guardrail, Building 292, Brooklyn Navy Yard Industrial Park, Railroad Avenue between Kay Avenue and Gee Avenue, Brooklyn Brooklyn BNYDC Building systems & Modifications Commented 2019-06-17
Rehabilitation of a comfort station, Arrochar Playground, adjacent to P.S. 139, Sand Avenue between Major Avenue and MacFarland Avenue, Staten Island Staten Island DPR Architecture Commented 2019-06-17
Rehabilitation of a comfort station, Hunts Point Playground, Hunts Point Avenue, Faile Street and Spofford Avenue, Bronx Bronx DPR Architecture Commented 2019-06-17
Construction of an NYPD vehicle impound facility, administration building, guard booth and adjacent site work, Rockaway Boulevard, Guy Brewer Boulevard, Farmers Boulevard, JFK International Airport, Queens Queens EDC Architecture Commented 2019-06-17
Reconstruction of a marine transfer station, East 91st Street Station, FDR Drive and East 91st Street, Manhattan Manhattan DDC Architecture Commented 2019-06-17
Construction of an entrance building, Shaft 4, Catskill Aqueduct and Delaware Aqueduct interconnection, Route 208 and Armato Lane, Gardiner, Ulster County Upstate DEP Architecture Commented 2019-06-17
Reconstruction of a portion of Dugan Playground, Mill Road, Isernia Avenue, Weed Avenue, and Tysens Lane, Staten Island Staten Island DPR Landscape architecture Commented 2019-06-17
Construction of a park and adjacent site work, Pier 97 between West 57th Street and West 59th Street, Manhattan Manhattan DPR Landscape architecture Commented 2019-06-17
Installation of a prototypical public toilet (APT), Municipal Building, One Centre Street, southern plaza near off-ramp of Brooklyn Bridge between Centre Street and Park Row, Manhattan Manhattan DOT Architecture Commented 2019-06-17
Construction of a portion of the Bronx River Greenway, including the reconstruction of Garrison Park, Concrete Plant Park and Garrison Park, Westchester Avenue, the Bronx River, Garrison Avenue, and the Amtrak Railroad, Bronx Bronx DPR Landscape architecture Commented 2019-06-17
Installation of electrical equipment, fencing, security booth, and turnstile enclosure to accommodate citywide ferry service, Dock 72, Market Street between 6th Street and Assembly Road, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Building systems & Modifications Commented 2019-06-17
Installation of a long range charging mast and two electrical equipment enclosures as a pilot of an electric bus program (“All Electric Bus”), Williamsburg Bridge Plaza, Havemeyer Street, Broadway, and Roebling Street, Brooklyn Brooklyn DOT Street Furniture Commented 2019-06-17
Reconstruction of Engine Company 293, including the construction of an addition, 89-40 87th Street, Queens Queens FDNY Architecture Commented 2019-06-17
Construction of Site B as part of the reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Architecture Final Approved with conditions 2019-06-17
Construction of the esplanade, Phase V, East River Waterfront between Peck Slip and Catherine Slip, Manhattan Manhattan EDC Landscape architecture Preliminary Approved with conditions 2019-06-17
Construction of Box Street Park, including a prototypical comfort station, Commercial Street, Box Street, and Newtown Creek, Brooklyn Brooklyn EDC Landscape architecture Preliminary Approved with conditions 2019-06-17
Installation of a mural, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 12th Avenue, Manhattan. Manhattan DSNY Artwork Final Approved with conditions 2019-06-17
Reconstruction of the shoreline, including construction of outlooks and ADA accessible pathways, between Conference House Park and Butler Manor Woods, Tottenville, Staten Island Staten Island DPR Landscape architecture Preliminary Approved 2019-06-17
Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island Staten Island DPR Architecture Final Approved 2019-06-17
Construction of a portion of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront master plan, including a lawn area and adjacent site work, Kent Avenue between North 11th Street and North 12th Street, Brooklyn Brooklyn DPR Landscape architecture Final Approved 2019-06-17
Installation of a soccer sealcoat field, Neptune Playground, West 12th Street and Neptune Avenue, Brooklyn Brooklyn DPR Landscape architecture Preliminary and Final Approved 2019-06-17
Installation of a soccer sealcoat field, Century Playground, West 2nd Street and West Brighton Avenue, Brooklyn Brooklyn DPR Landscape architecture Preliminary and Final Approved 2019-06-17
Installation of a reinterment marker, Washington Square Park near Washington Square South and Sullivan Street, Manhattan Manhattan DPR Signage Preliminary and Final Approved 2019-06-17
Reconstruction of a portion of Kelly Playground, adjacent to P.S. 255, Moore Place, East 17th Street, and Avenue S, Brooklyn Brooklyn DPR Landscape architecture Preliminary Approved 2019-06-17
Reconstruction of a dog run, Madison Square Park, Fifth Avenue between 24th Street and 25th Street, Manhattan Manhattan DPR Landscape architecture Preliminary Approved 2019-06-17
Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens Queens DPR Landscape architecture Preliminary Approved with conditions 2019-06-17
Installation of planters, West 14th Street between Ninth Avenue and 10th Avenue, Manhattan Manhattan DOT Landscape architecture Preliminary and Final Approved with conditions 2019-06-17
Installation of a marker commemorating the location of DeWitt Clinton's summer house, 56th Terrace and Maspeth Avenue, Ridgewood, Queens Queens DOT Signage Preliminary and Final Approved 2019-06-17
Construction of balconies, 293 Broome Street, Manhattan Manhattan DOT Architecture Preliminary and Final Approved 2019-06-17
Installation of signage, P.S. 006 (Corporal Allan F. Kivlehan School), 555 Page Avenue, Staten Island Staten Island DOE Signage Preliminary and Final Approved 2019-06-17
Installation of a soccer sealcoat field, P.S. 150, 364 Sackman Street, Brooklyn Brooklyn DOE Landscape architecture Preliminary and Final Approved 2019-06-17
Construction of streetscape improvements, including reconstruction of an entrance at Our Lady of Lourdes Church and Corporal Allan F. Kivlehan Park, between Milton Avenue, New Dorp Lane, Cedar Grove Avenue, Ebbits Street, and Hetts Avenue, Staten Island Staten Island DDC Landscape architecture Preliminary and Final Approved with conditions 2019-06-17
Installation of rooftop mechanical equipment, Bedford Library, 496 Franklin Avenue, Brooklyn Brooklyn DDC Building systems & Modifications Preliminary and Final Approved 2019-06-17