| Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-07-15 |
| Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Manhattan Grit Chamber, 432 East 110th Street, Manhattan |
Manhattan |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-07-15 |
| Rehabilitation of the New Administration Building, 104 B Road, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Architecture |
Preliminary |
Approved |
2019-07-15 |
| Restoration of a façade, Heckscher Building, 1230 Fifth Avenue, Manhattan |
Manhattan |
DDC |
Architecture |
Preliminary and Final |
Approved |
2019-07-15 |
| Installation of rooftop mechanical equipment, Mapleton Branch Library, 1702 60th Street, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-07-15 |
| Installation of rooftop guardrails, Mapleton Branch Library, 1702 60th Street, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-07-15 |
| Restoration of a façade, Ridgewood Library, 20-12 Madison Street, Ridgewood, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-07-15 |
| Construction of an entrance, outlook, and adjacent site work, Snug Harbor Cultural Center & Botanical Garden, Kissel Avenue at Linden Street, Staten Island |
Staten Island |
DCLA |
Landscape architecture |
Preliminary |
Approved |
2019-07-15 |
| Reconstruction of the Garden of Hope and El Coqui Community Garden (Melrose Commons Site 62), including installation of an artificial turf field, Melrose Avenue between East 162nd Street and 163rd Street, adjacent to Bronx Commons, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Commented |
2019-07-15 |
| Installation of the Elizabeth Cady Stanton and Susan B. Anthony Monument by Meredith Bergmann, Literary Walk, The Mall, Central Park, Manhattan |
Manhattan |
DPR |
Artwork |
Conceptual |
Commented |
2019-07-15 |
| Reconstruction of a portion of Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2019-07-15 |
| Reconstruction of Pier 42, Phase IA, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
Architecture |
|
Commented |
2019-06-17 |
| Construction of an environmental learning center (Solar One), 24-20 FDR Drive at Peter Cooper Road, Manhattan |
Manhattan |
EDC |
Architecture |
Preliminary |
Commented |
2019-06-17 |
| Restoration of the landscape, 477 Beaverkill Road, Ashokan Reservoir campus, Olive, Ulster County |
Upstate |
DEP |
Landscape architecture |
|
Commented |
2019-06-17 |
| Rehabilitation of Emergency Medical Station 39 (EMS 39), 265 Pennsylvania Avenue, Brooklyn |
Brooklyn |
FDNY |
Architecture |
|
Commented |
2019-06-17 |
| Waterfront development plan, Sunset Park, between 28th Street, Belt Parkway, Shore Road, and the Gowanus Bay, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
|
Commented |
2019-06-17 |
| Design of a prototypical bus shelter for installation citywide, Citywide |
Citywide |
DOT |
Street Furniture |
|
Commented |
2019-06-17 |
| Installation of a guardrail, Building 292, Brooklyn Navy Yard Industrial Park, Railroad Avenue between Kay Avenue and Gee Avenue, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
|
Commented |
2019-06-17 |
| Rehabilitation of a comfort station, Arrochar Playground, adjacent to P.S. 139, Sand Avenue between Major Avenue and MacFarland Avenue, Staten Island |
Staten Island |
DPR |
Architecture |
|
Commented |
2019-06-17 |
| Rehabilitation of a comfort station, Hunts Point Playground, Hunts Point Avenue, Faile Street and Spofford Avenue, Bronx |
Bronx |
DPR |
Architecture |
|
Commented |
2019-06-17 |
| Construction of an NYPD vehicle impound facility, administration building, guard booth and adjacent site work, Rockaway Boulevard, Guy Brewer Boulevard, Farmers Boulevard, JFK International Airport, Queens |
Queens |
EDC |
Architecture |
|
Commented |
2019-06-17 |
| Reconstruction of a marine transfer station, East 91st Street Station, FDR Drive and East 91st Street, Manhattan |
Manhattan |
DDC |
Architecture |
|
Commented |
2019-06-17 |
| Construction of an entrance building, Shaft 4, Catskill Aqueduct and Delaware Aqueduct interconnection, Route 208 and Armato Lane, Gardiner, Ulster County |
Upstate |
DEP |
Architecture |
|
Commented |
2019-06-17 |
| Reconstruction of a portion of Dugan Playground, Mill Road, Isernia Avenue, Weed Avenue, and Tysens Lane, Staten Island |
Staten Island |
DPR |
Landscape architecture |
|
Commented |
2019-06-17 |
| Construction of a park and adjacent site work, Pier 97 between West 57th Street and West 59th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
|
Commented |
2019-06-17 |
| Installation of a prototypical public toilet (APT), Municipal Building, One Centre Street, southern plaza near off-ramp of Brooklyn Bridge between Centre Street and Park Row, Manhattan |
Manhattan |
DOT |
Architecture |
|
Commented |
2019-06-17 |
| Construction of a portion of the Bronx River Greenway, including the reconstruction of Garrison Park, Concrete Plant Park and Garrison Park, Westchester Avenue, the Bronx River, Garrison Avenue, and the Amtrak Railroad, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Commented |
2019-06-17 |
| Installation of electrical equipment, fencing, security booth, and turnstile enclosure to accommodate citywide ferry service, Dock 72, Market Street between 6th Street and Assembly Road, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
|
Commented |
2019-06-17 |
| Installation of a long range charging mast and two electrical equipment enclosures as a pilot of an electric bus program (“All Electric Bus”), Williamsburg Bridge Plaza, Havemeyer Street, Broadway, and Roebling Street, Brooklyn |
Brooklyn |
DOT |
Street Furniture |
|
Commented |
2019-06-17 |
| Reconstruction of Engine Company 293, including the construction of an addition, 89-40 87th Street, Queens |
Queens |
FDNY |
Architecture |
|
Commented |
2019-06-17 |
| Construction of Site B as part of the reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn |
Brooklyn |
EDC |
Architecture |
Final |
Approved with conditions |
2019-06-17 |
| Construction of the esplanade, Phase V, East River Waterfront between Peck Slip and Catherine Slip, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary |
Approved with conditions |
2019-06-17 |
| Construction of Box Street Park, including a prototypical comfort station, Commercial Street, Box Street, and Newtown Creek, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Preliminary |
Approved with conditions |
2019-06-17 |
| Installation of a mural, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 12th Avenue, Manhattan. |
Manhattan |
DSNY |
Artwork |
Final |
Approved with conditions |
2019-06-17 |
| Reconstruction of the shoreline, including construction of outlooks and ADA accessible pathways, between Conference House Park and Butler Manor Woods, Tottenville, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-06-17 |
| Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island |
Staten Island |
DPR |
Architecture |
Final |
Approved |
2019-06-17 |
| Construction of a portion of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront master plan, including a lawn area and adjacent site work, Kent Avenue between North 11th Street and North 12th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2019-06-17 |
| Installation of a soccer sealcoat field, Neptune Playground, West 12th Street and Neptune Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2019-06-17 |
| Installation of a soccer sealcoat field, Century Playground, West 2nd Street and West Brighton Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2019-06-17 |
| Installation of a reinterment marker, Washington Square Park near Washington Square South and Sullivan Street, Manhattan |
Manhattan |
DPR |
Signage |
Preliminary and Final |
Approved |
2019-06-17 |
| Reconstruction of a portion of Kelly Playground, adjacent to P.S. 255, Moore Place, East 17th Street, and Avenue S, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-06-17 |
| Reconstruction of a dog run, Madison Square Park, Fifth Avenue between 24th Street and 25th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-06-17 |
| Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2019-06-17 |
| Installation of planters, West 14th Street between Ninth Avenue and 10th Avenue, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary and Final |
Approved with conditions |
2019-06-17 |
| Installation of a marker commemorating the location of DeWitt Clinton's summer house, 56th Terrace and Maspeth Avenue, Ridgewood, Queens |
Queens |
DOT |
Signage |
Preliminary and Final |
Approved |
2019-06-17 |
| Construction of balconies, 293 Broome Street, Manhattan |
Manhattan |
DOT |
Architecture |
Preliminary and Final |
Approved |
2019-06-17 |
| Installation of signage, P.S. 006 (Corporal Allan F. Kivlehan School), 555 Page Avenue, Staten Island |
Staten Island |
DOE |
Signage |
Preliminary and Final |
Approved |
2019-06-17 |
| Installation of a soccer sealcoat field, P.S. 150, 364 Sackman Street, Brooklyn |
Brooklyn |
DOE |
Landscape architecture |
Preliminary and Final |
Approved |
2019-06-17 |
| Construction of streetscape improvements, including reconstruction of an entrance at Our Lady of Lourdes Church and Corporal Allan F. Kivlehan Park, between Milton Avenue, New Dorp Lane, Cedar Grove Avenue, Ebbits Street, and Hetts Avenue, Staten Island |
Staten Island |
DDC |
Landscape architecture |
Preliminary and Final |
Approved with conditions |
2019-06-17 |
| Installation of rooftop mechanical equipment, Bedford Library, 496 Franklin Avenue, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-06-17 |