| Construction of a comfort station and maintenance building, Pier 97 between West 57th Street and West 59th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of an addition and adjacent site work, Brownsville Library, 61 Glenmore Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of an addition, Arverne Community Library, 312 Beach 54th Street, Arverne, Queens |
Queens |
DDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of an interim park, Pier 42, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a path and installation of electrical outlets, Madison Square Park, Fifth Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a portion of the Bronx River Greenway, including the reconstruction of Garrison Park, Concrete Plant Park and Garrison Park, Westchester Avenue, the Bronx River, Garrison Avenue, and the Amtrak Railroad, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of coastal resiliency infrastructure, Rockaway Point Boulevard at Beach 184th Street and Bayside Avenue, Roxbury, Queens |
Queens |
DDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of coastal resiliency infrastructure, Rockaway Point Boulevard at Beach 222nd Street and Beach 201st Street, Breezy Point, Queens |
Queens |
DDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Demolition of Design Team Project (1994) by Scott Burton, as part of the reconstruction of Sheepshead Bay Piers, Emmons Avenue between 21st Street and 27th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, Schaefer Landing, South 10th Street between Kent Avenue and the East River, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, St. George Ferry Terminal, Wall Street between Richmond Terrace and the Anchorage Channel, Staten Island |
Staten Island |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a fuel tank access hatch, 79th Street Yard, Central Park, 79th Street Transverse Road, west of West Drive, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a fuel tank access hatch, 86th Street Shops, Central Park, 86th Street Transverse Road, west of the 22nd Precinct Police Station, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 122nd Street Pump Station, 28-1 122nd Street, Jamaica, Queens |
Queens |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 24th Avenue Pump Station, 23-50 Waters Edge Drive, Bayside, Queens |
Queens |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, Sixth Road Pump Station, 627 151st Street, Queens. |
Queens |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a rooftop antenna system, 131 Walnut Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a rooftop antenna system and equipment platform, 625 West 133rd Street, Manhattan |
Manhattan |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Fresh Meadows playground, adjacent to P.S. 173, 173rd Street, 67th Avenue, and Fresh Meadow Lane, Fresh Meadows, Queens |
Queens |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, I.S. 117, 1865 Morris Avenue, Bronx |
Bronx |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Pomonok Playground, adjacent to P.S. 201, Kissena Boulevard, 65th Avenue, and 155th Street, Flushing, Queens |
Queens |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S. 7, 160 East 120th Street, Manhattan |
Manhattan |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Utopia playground, Utopia Parkway, Jewel Avenue, and 73rd Avenue, Fresh Meadows, Queens |
Queens |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of Colorful Companions by Olalekan Jeyifous, Brooklyn Animal Care Center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DCLA% |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Gildersleeve Avenue Pump Station, 208A Betts Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island Main Pump Station, 728 Main Street, Roosevelt Island, Manhattan |
Manhattan |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island South Pump Station, South Loop Road and East Loop Road, Roosevelt Island, Manhattan |
Manhattan |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue, Brooklyn |
Brooklyn |
DPR |
Conceptual |
|
Consent Items |
Agenda
Minutes
|
| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
Conceptual |
|
Consent Items |
Agenda
Minutes
|
| Installation of security bollards, Hebrew Institute of Riverdale, 3700 Henry Hudson Parkway, Henry Hudson Parkway and Netherland Avenue, Bronx |
Bronx |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of security infrastructure, between Surf Avenue, West 37th Street, The Riegelmann Boardwalk, and Brighton 15th Street, Coney Island Beach at Surf Avenue, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage, overfill switch, and alarm, DSNY Queens 13 East Garage, 153-67 146th Avenue, Jamaica, Queens |
Queens |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage, P.S. 12 (Ronald Edmonds Learning Center II), 430 Howard Avenue, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage, P.S. 197 (Kings Highway Academy), 1599 East 22nd Street, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of an ADA entrance, Bryant Park, West 42nd Street between 5th Avenue and 6th Avenue, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a pedestal, William Henry Seward (1876) by Randolph Rogers, Madison Square Park, Fifth Avenue and East 23rd Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Jamaica Playground, Union Hall Street, Brinkeroff Avenue, and 160th Street, Jamaica, Queens |
Queens |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Quarry Ballfields, Oak Tree Place, Hughes Avenue, and East 181st Street, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Maple Playground, Maple Avenue and Kissena Boulevard, Flushing, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Monsignor Kett Playground, West 204th Street between Nagle Avenue and Tenth Avenue, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the bulkhead, southern terminus of Vernon Boulevard between 54th Avenue and Newtown Creek, Long Island City, Queens |
Queens |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the plaza surrounding the Bailey Fountain, Grand Army Plaza, Prospect Park, Flatbush Avenue, and Eastern Parkway, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a building and construction of an addition, Melrose Branch Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a field house, Tompkins Square Park, Avenue A, East 10th Street, Avenue B, and East 7th Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of an administration building and garage building, 5 Dubois Avenue, Staten Island |
Staten Island |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of Gerritsen Beach Branch Library, 2808 Gerritsen Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the East 188th Street Bridge, East 188th Street between Park Avenue North and Park Avenue South, Bronx |
Bronx |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Queens County Criminal Courthouse, 125-01 Queens Boulevard, Kew Gardens, Queens |
Queens |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a comfort station and adjacent site work, Owl Hollow Fields, Arthur Kill Road, Route 440 and Arden Avenue, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a comfort station and maintenance building, Pier 97 between West 57th Street and West 59th Street, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a comfort station and maintenance building, Pier 97 between West 57th Street and West 59th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a comfort station, Seaside Wildlife Nature Park, Nelson Avenue and Tennyson Drive, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk, the Hospital for Special Surgery, 525 East 71st Street between York Avenue and the FDR Drive, Manhattan |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk, the New York Public Library Stephen A. Schwarzman Building and Bryant Park, West 40th Street and West 42nd Street between Fifth Avenue and Sixth Avenue, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a dog run, Shore Road Park, Shore Parkway, Fourth Avenue, and Shore Road, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a garden shed, Edgemere Coalition Community Garden, 4-80 Beach 43rd Street, Far Rockaway, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a gate, East River Science Park (Alexandria Center for Life Science), 500 East 30th Street at First Avenue and East 29th Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an addition and adjacent site work, Brownsville Library, 61 Glenmore Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an addition and adjacent site work, Brownsville Library, 61 Glenmore Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an addition, Arverne Community Library, 312 Beach 54th Street, Arverne, Queens |
Queens |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an addition, Arverne Community Library, 312 Beach 54th Street, Arverne, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an animal care center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an education building, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an interim park, Pier 42, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of an interim park, Pier 42, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a park, Willoughby Street, Duffield Street and Gold Street, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a path and installation of electrical outlets, Madison Square Park, Fifth Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a path and installation of electrical outlets, Madison Square Park, Fifth Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a plaza, Osborn Street south of Belmont Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a portion of the Bronx River Greenway, including the reconstruction of Garrison Park, Concrete Plant Park and Garrison Park, Westchester Avenue, the Bronx River, Garrison Avenue, and the Amtrak Railroad, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a portion of the Bronx River Greenway, including the reconstruction of Garrison Park, Concrete Plant Park and Garrison Park, Westchester Avenue, the Bronx River, Garrison Avenue, and the Amtrak Railroad, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of basketball courts, Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of Bella Abzug Park (Hudson Park and Boulevard) Blocks 5 and 6, 10th Avenue and 11th Avenue from 37th Street to 39th Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of coastal resiliency infrastructure, Rockaway Point Boulevard at Beach 184th Street and Bayside Avenue, Roxbury, Queens |
Queens |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of coastal resiliency infrastructure, Rockaway Point Boulevard at Beach 184th Street and Bayside Avenue, Roxbury, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of coastal resiliency infrastructure, Rockaway Point Boulevard at Beach 222nd Street and Beach 201st Street, Breezy Point, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of coastal resiliency infrastructure, Rockaway Point Boulevard at Beach 222nd Street and Beach 201st Street, Breezy Point, Queens |
Queens |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of Engine Company 268/Ladder Company 137 and adjacent site work, 116-11 Beach Channel Drive, Rockaway Park, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of flood protection measures as part of the South Battery Park City Resiliency Master Plan, 1st Place between Battery Place and the Hudson River, Pier A Plaza, and The Battery, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of North Park, Phase I, Fresh Kills Park, Richmond Hill Road, Arthur Kill Road and Victory Boulevard, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of two residential buildings (Buildings 2 and 3) as part of the rehabilitation of the Bedford Union Armory, 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Demolition of Design Team Project (1994) by Scott Burton, as part of the reconstruction of Sheepshead Bay Piers, Emmons Avenue between 21st Street and 27th Street, Brooklyn |
Brooklyn |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Demolition of Design Team Project (1994) by Scott Burton, as part of the reconstruction of Sheepshead Bay Piers, Emmons Avenue between 21st Street and 27th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, Schaefer Landing, South 10th Street between Kent Avenue and the East River, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, Schaefer Landing, South 10th Street between Kent Avenue and the East River, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, St. George Ferry Terminal, Wall Street between Richmond Terrace and the Anchorage Channel, Staten Island |
Staten Island |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, St. George Ferry Terminal, Wall Street between Richmond Terrace and the Anchorage Channel, Staten Island |
Staten Island |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a fuel tank access hatch, 79th Street Yard, Central Park, 79th Street Transverse Road, west of West Drive, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a fuel tank access hatch, 79th Street Yard, Central Park, 79th Street Transverse Road, west of West Drive, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a fuel tank access hatch, 86th Street Shops, Central Park, 86th Street Transverse Road, west of the 22nd Precinct Police Station, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a fuel tank access hatch, 86th Street Shops, Central Park, 86th Street Transverse Road, west of the 22nd Precinct Police Station, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 122nd Street Pump Station, 28-1 122nd Street, Jamaica, Queens |
Queens |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 122nd Street Pump Station, 28-1 122nd Street, Jamaica, Queens |
Queens |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 24th Avenue Pump Station, 23-50 Waters Edge Drive, Bayside, Queens |
Queens |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 24th Avenue Pump Station, 23-50 Waters Edge Drive, Bayside, Queens |
Queens |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, Sixth Road Pump Station, 627 151st Street, Queens. |
Queens |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, Sixth Road Pump Station, 627 151st Street, Queens. |
Queens |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 700 8th Avenue, northeast corner of 8th Avenue and West 44th Street, Manhattan |
Manhattan |
DCA |
|
Commented |
|
Agenda
Minutes
|
| Installation of a rooftop antenna system, 131 Walnut Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a rooftop antenna system, 131 Walnut Avenue, Bronx |
Bronx |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of a rooftop antenna system and equipment platform, 625 West 133rd Street, Manhattan |
Manhattan |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a rooftop antenna system and equipment platform, 625 West 133rd Street, Manhattan |
Manhattan |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Fresh Meadows playground, adjacent to P.S. 173, 173rd Street, 67th Avenue, and Fresh Meadow Lane, Fresh Meadows, Queens |
Queens |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Fresh Meadows playground, adjacent to P.S. 173, 173rd Street, 67th Avenue, and Fresh Meadow Lane, Fresh Meadows, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, I.S. 117, 1865 Morris Avenue, Bronx |
Bronx |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, I.S. 117, 1865 Morris Avenue, Bronx |
Bronx |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Pomonok Playground, adjacent to P.S. 201, Kissena Boulevard, 65th Avenue, and 155th Street, Flushing, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Pomonok Playground, adjacent to P.S. 201, Kissena Boulevard, 65th Avenue, and 155th Street, Flushing, Queens |
Queens |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S. 7, 160 East 120th Street, Manhattan |
Manhattan |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S. 7, 160 East 120th Street, Manhattan |
Manhattan |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Utopia playground, Utopia Parkway, Jewel Avenue, and 73rd Avenue, Fresh Meadows, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, Utopia playground, Utopia Parkway, Jewel Avenue, and 73rd Avenue, Fresh Meadows, Queens |
Queens |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of Colorful Companions by Olalekan Jeyifous, Brooklyn Animal Care Center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DCLA% |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of Colorful Companions by Olalekan Jeyifous, Brooklyn Animal Care Center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DCLA% |
|
Approved |
|
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Gildersleeve Avenue Pump Station, 208A Betts Avenue, Bronx |
Bronx |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Gildersleeve Avenue Pump Station, 208A Betts Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island Main Pump Station, 728 Main Street, Roosevelt Island, Manhattan |
Manhattan |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island Main Pump Station, 728 Main Street, Roosevelt Island, Manhattan |
Manhattan |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island South Pump Station, South Loop Road and East Loop Road, Roosevelt Island, Manhattan |
Manhattan |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island South Pump Station, South Loop Road and East Loop Road, Roosevelt Island, Manhattan |
Manhattan |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue, Brooklyn |
Brooklyn |
DPR |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue, Brooklyn |
Brooklyn |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of security bollards, Hebrew Institute of Riverdale, 3700 Henry Hudson Parkway, Henry Hudson Parkway and Netherland Avenue, Bronx |
Bronx |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of security bollards, Hebrew Institute of Riverdale, 3700 Henry Hudson Parkway, Henry Hudson Parkway and Netherland Avenue, Bronx |
Bronx |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Installation of security infrastructure, between Surf Avenue, West 37th Street, The Riegelmann Boardwalk, and Brighton 15th Street, Coney Island Beach at Surf Avenue, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of security infrastructure, between Surf Avenue, West 37th Street, The Riegelmann Boardwalk, and Brighton 15th Street, Coney Island Beach at Surf Avenue, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Installation of security infrastructure, Empire State Building, 350 Fifth Avenue, Fifth Avenue, West 33rd Street, and West 34th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of signage, overfill switch, and alarm, DSNY Queens 13 East Garage, 153-67 146th Avenue, Jamaica, Queens |
Queens |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of signage, overfill switch, and alarm, DSNY Queens 13 East Garage, 153-67 146th Avenue, Jamaica, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of signage, P.S. 12 (Ronald Edmonds Learning Center II), 430 Howard Avenue, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of signage, P.S. 12 (Ronald Edmonds Learning Center II), 430 Howard Avenue, Brooklyn |
Brooklyn |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of signage, P.S. 197 (Kings Highway Academy), 1599 East 22nd Street, Brooklyn |
Brooklyn |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of signage, P.S. 197 (Kings Highway Academy), 1599 East 22nd Street, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of sports lighting, Ferry Point Park Golf Course, Balcom Avenue, Miles Avenue, the Whitestone Bridge approach, and the East River, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction and infill of windows (Dave & Buster's), 625 Atlantic Avenue, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a landscaped terrace to support an exhibit (Earth Science Garden), Brooklyn Children's Museum, 145 Brooklyn Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an ADA entrance, Bryant Park, West 42nd Street between 5th Avenue and 6th Avenue, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of an ADA entrance, Bryant Park, West 42nd Street between 5th Avenue and 6th Avenue, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a park, Elizabeth H. Berger Plaza, Greenwich Street, Edgar Street, Trinity Place, and Morris Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a pedestal, William Henry Seward (1876) by Randolph Rogers, Madison Square Park, Fifth Avenue and East 23rd Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a pedestal, William Henry Seward (1876) by Randolph Rogers, Madison Square Park, Fifth Avenue and East 23rd Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Jamaica Playground, Union Hall Street, Brinkeroff Avenue, and 160th Street, Jamaica, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Jamaica Playground, Union Hall Street, Brinkeroff Avenue, and 160th Street, Jamaica, Queens |
Queens |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Quarry Ballfields, Oak Tree Place, Hughes Avenue, and East 181st Street, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Quarry Ballfields, Oak Tree Place, Hughes Avenue, and East 181st Street, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of fueling facilities, New York Police Department, Highway Precinct No. 3, Cunningham Park, 198-15 Grand Central Parkway, Hollis, Queens |
Queens |
DDC |
|
Withdrawn |
|
Agenda
Minutes
|
| Reconstruction of Maple Playground, Maple Avenue and Kissena Boulevard, Flushing, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Maple Playground, Maple Avenue and Kissena Boulevard, Flushing, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Monsignor Kett Playground, West 204th Street between Nagle Avenue and Tenth Avenue, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Monsignor Kett Playground, West 204th Street between Nagle Avenue and Tenth Avenue, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Ocean Hill Playground, adjacent to I.S. 55, Bergen Street, Rockaway Avenue, and Dean Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the bulkhead, southern terminus of Vernon Boulevard between 54th Avenue and Newtown Creek, Long Island City, Queens |
Queens |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the bulkhead, southern terminus of Vernon Boulevard between 54th Avenue and Newtown Creek, Long Island City, Queens |
Queens |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of the plaza surrounding the Bailey Fountain, Grand Army Plaza, Prospect Park, Flatbush Avenue, and Eastern Parkway, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the plaza surrounding the Bailey Fountain, Grand Army Plaza, Prospect Park, Flatbush Avenue, and Eastern Parkway, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the World's Fair Marina, Flushing Bay Promenade, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a building and construction of an addition, Melrose Branch Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a building and construction of an addition, Melrose Branch Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, Colonel David Marcus Playground, Avenue P between Ocean Parkway and East 5th Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a field house, Tompkins Square Park, Avenue A, East 10th Street, Avenue B, and East 7th Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of a field house, Tompkins Square Park, Avenue A, East 10th Street, Avenue B, and East 7th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of an administration building and garage building, 5 Dubois Avenue, Staten Island |
Staten Island |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of an administration building and garage building, 5 Dubois Avenue, Staten Island |
Staten Island |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of Gerritsen Beach Branch Library, 2808 Gerritsen Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of Gerritsen Beach Branch Library, 2808 Gerritsen Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the courtyard, Clarendon Branch Library, 2035 Nostrand Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the East 188th Street Bridge, East 188th Street between Park Avenue North and Park Avenue South, Bronx |
Bronx |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the East 188th Street Bridge, East 188th Street between Park Avenue North and Park Avenue South, Bronx |
Bronx |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the Queens County Criminal Courthouse, 125-01 Queens Boulevard, Kew Gardens, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the Queens County Criminal Courthouse, 125-01 Queens Boulevard, Kew Gardens, Queens |
Queens |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Renovation of a recreation center, St. Mary's Park, St. Anne's Avenue between East 145th Street and East 144th Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|