| Construction of a dog run, Parade Ground, Prospect Park, Caton Avenue and Coney Island Avenue, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an electrical building and adjacent site work, Oakwood Beach Water Pollution Control Plant, 751 Mill Road, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a utility shed, Glendale Yard, 69-46 Sybilla Street, Forest Hills, Queens |
Queens |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of Biogas Conditioning System and adjacent site work, Newtown Creek Wastewater Treatment Plant, 327 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of the Queens Vietnam Veterans Memorial, Elmhurst Park, Grand Avenue and 79th Street, Elmhurst, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a long range charging mast and two electrical equipment enclosures as a pilot of an electric bus program (“All Electric Bus”), Williamsburg Bridge Plaza, Havemeyer Street, Broadway, and Roebling Street, Brooklyn |
Brooklyn |
DOT |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of an artificial turf field and basketball courts, P.S. 43, Jonas Bronck School, 165 Brown Place, Bronx |
Bronx |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a pre-fabricated storage building, Prospect Park, Prospect Park West between Sixth Street and Eighth Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a prototypical newsstand, 200 West 65th Street, southwest corner of Amsterdam Avenue and West 65th Street, Manhattan |
Manhattan |
DCA |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a prototypical newsstand, 22-15 31st Street, southeast corner of 31st Street and Ditmars Boulevard, Astoria, Queens |
Queens |
DCA |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a prototypical newsstand, 300 West 44th Street, southwest corner of West 44th Street and 8th Avenue, Manhattan |
Manhattan |
DCA |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a prototypical newsstand, 423 9th Avenue, southwest corner of West 34th Street and 9th Avenue, Manhattan |
Manhattan |
DCA |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a prototypical newsstand, 617 Pacific Street, southwest corner of Flatbush Avenue and Atlantic Avenue, Brooklyn |
Brooklyn |
DCA |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a roof, Richmondtown Library, 200 Clarke Avenue, Staten Island |
Staten Island |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a rooftop exhaust fan, Essex Street Market, 120 Essex Street at Delancey Street, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of artworks by Pablo Helguera, Far Rockaway Community Library, 16-37 Central Avenue, Far Rockaway, Queens |
Queens |
DCLA% |
Conceptual |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S./ I.S. 66, 845 East 96th Street, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a picnic area, Prospect Park Picnic House, Prospect Park West and Fifth Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a playground, Success Academy Charter School, P.S. 175, 175 West 134th Street, Manhattan |
Manhattan |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of baseball fields 4 and 5 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Callahan-Kelly Park, Broadway Junction, Van Sinderen Avenue, Truxton Street, Eastern Parkway, and Fulton Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the picnic areas and adjacent site work, Prospect Park Bandshell, Prospect Park West between 9th Street and 11th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the Reflecting Pool as Phase I of the reconstruction of three fountains, between the Unisphere and Fountain of the Planets, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a facade and installation of guardrails, Bellevue Men’s Shelter, 400 East 30th Street, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of docks, Paerdegat Basin Park, Paerdegat Avenue North between Paerdegat 12th Street and Seaview Avenue, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Renovation of a recreation center, St. Mary's Park, St. Anne's Avenue between East 145th Street and East 144th Street, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of the First Responders Memorial by Masayuki Sono, an addition to the Staten Island September 11 Memorial (2004) by Masayuki Sono, Staten Island Promenade, Richmond County Bank Ballpark, North Shore, Staten Island |
Staten Island |
EDC |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Reconstruction of the New York City Police Substation (formerly Times Square Sweep-up Booth, formerly Times Square Information Booth), Broadway and 43rd Street, 43rd Street between Broadway and 7th Avenue, Manhattan |
Manhattan |
NYPD |
Final |
|
Public Hearing |
Agenda
Minutes
|
| 108 Leonard Street, Leonard Street between Lafayette and Broadway, Distinctive Lighting |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Construction of a broadcasting facility, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a covered artificial turf field and comfort station (FC Harlem), adjacent to the North River Wastewater Treatment Plant and Riverbank State Park, West 145th Street and the Henry Hudson Parkway, Manhattan |
Manhattan |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a dog run, Parade Ground, Prospect Park, Caton Avenue and Coney Island Avenue, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a foundation and platform for the track and field house and adjacent site work as Phase IA of the reconstruction of Ocean Breeze Park, Quintard Street, Mason Avenue and Father Capodanno Boulevard, Staten Island |
Staten Island |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a hotel, restoration and adaptive reuse of historic structures, and related site work as Phase II of the construction of a mixed-use development (Lighthouse Point), 5 Bay Street, Staten Island |
Staten Island |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of Alley Pond Environmental Center, 228-08 Northern Boulevard, Alley Pond Park, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a mixed-use development, including a hotel tower and residential tower, 495 11th Avenue, 11th Avenue between 39th Street and 40th Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an adult fitness area and a basketball court, Bronx Park, Bronx River Parkway, Boston Road and Sagamore Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of an aeration building and adjacent site work, Phase I, 47th Street and Newtown Creek, Maspeth, Queens |
Queens |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of an electrical building and adjacent site work, Oakwood Beach Water Pollution Control Plant, 751 Mill Road, Staten Island |
Staten Island |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Construction of a parking garage (Building 399), Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a primary electrical substation, Oakwood Beach Water Pollution Control Plant, 751 Mill Road, Staten Island |
Staten Island |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a tennis stadium (Court 17), Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a utility shed, Glendale Yard, 69-46 Sybilla Street, Forest Hills, Queens |
Queens |
DOT |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a warehouse building and locker room building, Pier C, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of Biogas Conditioning System and adjacent site work, Newtown Creek Wastewater Treatment Plant, 327 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Construction of the building entrances, comfort station and concession building and mechanical equipment for the track and field house as Phase IC of the reconstruction of Ocean Breeze Park, Quintard Street, Mason Avenue and Father Capodanno Boulevard, Staten Island |
Staten Island |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of the Clearview Pumping Station, Clearview Expressway exit ramp, Roe Place and the Cross Island Parkway service road, Queens |
Queens |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of the Edenwald YMCA facility and adjacent site work, Christopher School Facility, 1250 East 229th Street at Schieffelin Place, Bronx |
Bronx |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of the NYPD training facility, Phase I, College Point Boulevard, 28th Avenue, Ulmer Street, College Point Corporate Park, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of the Queens Vietnam Veterans Memorial, Elmhurst Park, Grand Avenue and 79th Street, Elmhurst, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a distinctive sidewalk, Inter-Continental Hotel- The Barclay New York, 111 East 48th Street, between Park Avenue and Lexington Avenue, Manhattan |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of a long range charging mast and two electrical equipment enclosures as a pilot of an electric bus program (“All Electric Bus”), Williamsburg Bridge Plaza, Havemeyer Street, Broadway, and Roebling Street, Brooklyn |
Brooklyn |
DOT |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of an artificial turf field and basketball courts, P.S. 43, Jonas Bronck School, 165 Brown Place, Bronx |
Bronx |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of an artwork by Siah Armajani, North Shore Esplanade, adjacent to the Staten Island Ferry Terminal and former U.S. Coast Guard Light House Depot, Staten Island |
Staten Island |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of a plaque, Sheldon Avenue Bluebelt, Sweet Brook watershed, Staten Island |
Staten Island |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a pre-fabricated storage building, Prospect Park, Prospect Park West between Sixth Street and Eighth Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 200 West 65th Street, southwest corner of Amsterdam Avenue and West 65th Street, Manhattan |
Manhattan |
DCA |
|
Approved |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 22-15 31st Street, southeast corner of 31st Street and Ditmars Boulevard, Astoria, Queens |
Queens |
DCA |
|
Approved |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 300 West 44th Street, southwest corner of West 44th Street and 8th Avenue, Manhattan |
Manhattan |
DCA |
|
Approved |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 423 9th Avenue, southwest corner of West 34th Street and 9th Avenue, Manhattan |
Manhattan |
DCA |
|
Approved |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 617 Pacific Street, southwest corner of Flatbush Avenue and Atlantic Avenue, Brooklyn |
Brooklyn |
DCA |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of a roof, Richmondtown Library, 200 Clarke Avenue, Staten Island |
Staten Island |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a rooftop exhaust fan, Essex Street Market, 120 Essex Street at Delancey Street, Manhattan |
Manhattan |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of artworks by Pablo Helguera, Far Rockaway Community Library, 16-37 Central Avenue, Far Rockaway, Queens |
Queens |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S./ I.S. 66, 845 East 96th Street, Brooklyn |
Brooklyn |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a stair and railing, 120 North 6th Street, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of electrical equipment, fencing, security booth, and turnstile enclosure to accommodate citywide ferry service, Dock 72, Market Street between 6th Street and Assembly Road, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of flood barriers, Hunts Point Food Distribution Center, 355 Food Center Drive, Bronx |
Bronx |
EM |
|
Commented |
|
Agenda
Minutes
|
| Installation of flood barriers, Hunts Point Water Pollution Control Plant, East River near Halleck Road and Ryawa Avenue, Bronx |
Bronx |
NYCEM |
|
Commented |
|
Agenda
Minutes
|
| Installation of green infrastructure including a bioswale, Carroll Park, President Street, Smith Street, Carroll Street, and Court Street, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Installation of interim flood protection measures, 44-36 Vernon Boulevard, 5-40 44th Drive, Long Island City, Queens |
Queens |
NYCEM |
|
Commented |
|
Agenda
Minutes
|
| Installation of interim flood protection measures, Mason Avenue Pumping Station, 494 Mason Avenue, Staten Island |
Staten Island |
NYCEM |
|
Commented |
|
Agenda
Minutes
|
| Installation of photocells on pedestrian light poles citywide |
Citywide |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop HVAC equipment and windows, 1400 Williamsbridge Road, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop HVAC equipment, Richmond Hill Community Library, 118-14 Hillside Avenue, Richmond Hill, Queens |
Queens |
QPL |
|
Commented |
|
Agenda
Minutes
|
| Installation of the First Responders Memorial by Masayuki Sono, an addition to the Staten Island September 11 Memorial (2004) by Masayuki Sono, Staten Island Promenade, Richmond County Bank Ballpark, North Shore, Staten Island |
Staten Island |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of windows and a curtain wall, 111 Precinct, 45-06 21 5th Street, Bayside, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of windows, Old Administration Building, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Greenpoint Avenue between Humboldt Street and Russell Street, Brooklyn |
Brooklyn |
DEP |
|
Withdrawn |
|
Agenda
Minutes
|
| Reconstruction of an administrative building and western tennis courts, including construction of a spectator deck, and adjacent site work as part of the United States Tennis Association's Billie Jean King National Tennis Center strategic vision plan, Flushing Meadows Corona Park, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an education center, Queens Zoo, 55-51 111th Street, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an embankment, Hillview Reservoir, Hillview Avenue between Aqueduct Avenue and Harding Avenue, Yonkers, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an entrance, Bushwick Communicare Health Center, 335 Central Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a picnic area, Prospect Park Picnic House, Prospect Park West and Fifth Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a playground, Rosemary's Playground, Woodward Street between Woodbine Street and Madison Street, Ridgewood, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a playground, Success Academy Charter School, P.S. 175, 175 West 134th Street, Manhattan |
Manhattan |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Park Slope Playground including green infrastructure, adjacent to P. S. 282, Lincoln Place, 6th Avenue, Berkeley Place, and 5th Avenue, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of baseball fields 4 and 5 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Callahan-Kelly Park, Broadway Junction, Van Sinderen Avenue, Truxton Street, Eastern Parkway, and Fulton Street, Brooklyn |
Brooklyn |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of docks, Mill Basin Marina, East 69th Street and Avenue Y, Brooklyn |
Brooklyn |
DPR |
|
Found incomplete |
|
Agenda
Minutes
|
| Reconstruction of Hart Playground, formerly knowns as Eight Oaks Trapezoid Park, Broadway, 69th Street, 37th Avenue, and 65th Street, Woodside, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Pershing Square West Plaza, Park Avenue between East 41st Street and East 42nd Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Public School 269 (Nostrand) Playground, southeast corner of Nostrand Avenue and Foster Avenue |
Upstate |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Riverside Park South, Phase I, including the construction of a shade structure, west of Route 9A between West 62nd Street and West 70th Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Roberto Clemente Plaza, Third Avenue, East 147th Street, East 149th Street and Willis Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the Henry Hudson entrance, Flushing Meadows Corona Park, 111th Street between 53rd Avenue and 56th Avenue, Flushing, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the New York City Police Substation (formerly Times Square Sweep-up Booth, formerly Times Square Information Booth), Broadway and 43rd Street, 43rd Street between Broadway and 7th Avenue, Manhattan |
Manhattan |
NYPD |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the picnic areas and adjacent site work, Prospect Park Bandshell, Prospect Park West between 9th Street and 11th Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the Reflecting Pool as Phase I of the reconstruction of three fountains, between the Unisphere and Fountain of the Planets, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a facade and installation of guardrails, Bellevue Men’s Shelter, 400 East 30th Street, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of an existing building and construction of an addition, Melrose Branch Library, New York Public Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of docks, Paerdegat Basin Park, Paerdegat Avenue North between Paerdegat 12th Street and Seaview Avenue, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the Shaft 11A headhouse and adjacent site work, New Croton Aqueduct, White Plains Road, Greenburgh, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the Shaft 18 gatehouse and adjacent site work, New Croton Aqueduct, Yonkers Avenue, Yonkers, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the Shaft 23 headhouse and adjacent site work, New Croton Aqueduct, West Burnside Avenue, University Heights |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the Shaft 25 headhouse and adjacent site work, New Croton Aqueduct, Highbridge Park |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the Shaft 9 gatehouse and adjacent site work, New Croton Aqueduct, Sleepy Hollow, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Relocation of two mosaics (1958) by Edward Meshekoff from the New York City Police Substation, Broadway and 43rd Street, 43rd Street between Broadway and 7th Avenue, Manhattan to Old Slip Park, Old Slip between Water Street and Front Street, Manhattan |
Manhattan |
NYPD |
|
Withdrawn |
|
Agenda
Minutes
|
| Renovation of a recreation center, St. Mary's Park, St. Anne's Avenue between East 145th Street and East 144th Street, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Restoration of the 96th Street Branch Library, 112 East 96th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Update to the design of a master plan for the reconstruction of Sherman Creek Park, including the construction of a boat storage building, outdoor pavilion, and adjacent site work, Tenth Avenue, Harlem River Drive, Academy Street, and Sherman Creek, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|