| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
Artwork |
Preliminary |
Approved with conditions |
2020-06-22 |
| Reconstruction of Ericsson Playground, adjacent to M.S. 126, Manhattan Avenue and Leonard Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Commented |
2020-05-18 |
| Installation of Unity by Hank Willis Thomas, Tillary Street, between Cadman Plaza East and Adams Street, Brooklyn |
Brooklyn |
DCLA% |
Artwork |
Final |
Commented |
2020-05-18 |
| Reconstruction of soccer fields 1 & 3 as Phase IV of the reconstruction of the Red Hook Recreation Area, Clinton Street, Bay Street, and Court Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2020-05-18 |
| Installation of two generators and switchgear, Hunts Point Cooperative Market, 355 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
|
Commented |
2020-05-18 |
| Construction of a water quality monitoring station, Shaft 3A, 903 East 233rd Street, Bronx |
Bronx |
DEP |
Building systems & Modifications |
|
Commented |
2020-05-18 |
| Construction of an ADA ramp at the Dairy, Central Park, East 65th Street transverse road between Center Drive and East Drive, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2020-05-18 |
| Construction of ADA ramps and restoration of the Conservatory Garden, Central Park, Fifth Avenue at East 105th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2020-05-18 |
| Installation of an antenna enclosure, Downtown Manhattan Heliport, Pier 6, 20 South Street, Manhattan |
Manhattan |
EDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-05-18 |
| Installation of a storefront, louvers, and rooftop mechanical equipment, Public Safety Answering Center, 11 MetroTech Center, Brooklyn |
Brooklyn |
EDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-05-18 |
| Reconstruction of the Soldiers & Sailors Memorial Arch (1892) by John Hemingway Duncan, Prospect Park, Grand Army Plaza, Flatbush Avenue and Eastern Parkway, Brooklyn. |
Brooklyn |
DPR |
Artwork |
Preliminary |
Approved |
2020-05-18 |
| Conservation of Private Passage (2005)by Malcolm Cochran, Hudson River Park, Clinton Cove, between 12th Avenue and the Hudson River at West 56th Street, Manhattan. |
Manhattan |
DPR |
Artwork |
Preliminary |
Approved |
2020-05-18 |
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue at West 8th Street, Brooklyn. |
Brooklyn |
DPR |
Artwork |
Preliminary |
Approved with conditions |
2020-05-18 |
| Rehabilitation of a comfort station, Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East and Kepler Avenue, Bronx |
Bronx |
DPR |
Architecture |
Final |
Approved |
2020-05-18 |
| Reconstruction of Redwood Upper Playground, Cunningham Park, 193rd Street between Aberdeen Road and Radnor Road, Fresh Meadows, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2020-05-18 |
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Construction of a seating area, Rockaway Beach, Shore Front Parkway between Beach 73rd Street and Beach 74th Street, Arverne, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 98th Street, Arverne, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 102nd Street, Arverne, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 101st Street, Arverne, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Installation of a sealcoat soccer pitch, P.S. 60, 55 Merrill Avenue, Staten Island |
Staten Island |
DOE |
Landscape architecture |
Preliminary and Final |
Approved |
2020-05-18 |
| Construction of a comfort station and adjacent site work, Owl Hollow Fields, Arthur Kill Road, Route 440 and Arden Avenue, Staten Island |
Staten Island |
DPR |
Architecture |
|
Commented |
2020-05-18 |
| Rehabilitation of the Eltingville Pumping Station (formerly Brookfield Landfill), Arthur Kill Road and Brookfield Avenue, Staten Island |
Staten Island |
DEP |
Architecture |
Final |
Approved |
2020-05-18 |
| Rehabilitation of the 108th Street Pump Station, including the installation of an emergency generator and odor control unit, 108-1 Horace Harding Expressway, Queens |
Queens |
DEP |
Architecture |
Preliminary and Final |
Approved |
2020-05-18 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Sapphire Street Pump Station, 2891 Linden Boulevard, Brooklyn |
Brooklyn |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2020-05-18 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Co-Op City North Pump Station, Co-Op City North Boulevard and Bellamy Loop, Bronx |
Bronx |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2020-05-18 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Commerce Avenue Pump Station, 2500 Ellis Avenue, Bronx |
Bronx |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2020-05-18 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Cannon Avenue Pump Station, 183 Cannon Avenue, Staten Island |
Staten Island |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2020-05-18 |
| Construction of a stormwater detention wetland, Staten Island Bluebelt, Todt Hill Road and Whitlock Avenue, New Creek Watershed, Staten Island |
Staten Island |
DEP |
Landscape architecture |
Preliminary |
Approved |
2020-05-18 |
| Construction of a distinctive sidewalk, the New York Public Library Stephen A. Schwarzman Building and Bryant Park, West 40th Street and West 42nd Street between Fifth Avenue and Sixth Avenue, Manhattan |
Manhattan |
DDC |
Distinctive sidewalk |
Preliminary and Final |
Approved with conditions |
2020-05-18 |
| Construction of a portion of the Bronx River Greenway, including the reconstruction of Garrison Park, Concrete Plant Park and Garrison Park, Westchester Avenue, the Bronx River, Garrison Avenue, and the Amtrak Railroad, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2020-04-20 |
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Building systems & Modifications |
Preliminary |
Approved |
2020-04-20 |
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-04-20 |
| Construction of a path and installation of electrical outlets, Madison Square Park, Fifth Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2020-04-20 |
| Rehabilitation of the East 188th Street Bridge, East 188th Street between Park Avenue North and Park Avenue South, Bronx |
Bronx |
DOT |
Bridge |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of security bollards, Hebrew Institute of Riverdale, 3700 Henry Hudson Parkway, Henry Hudson Parkway and Netherland Avenue, Bronx |
Bronx |
DOT |
Street furniture |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of signage, P.S. 197 (Kings Highway Academy), 1599 East 22nd Street, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a sealcoat soccer field, P.S. 7, 160 East 120th Street, Manhattan |
Manhattan |
DOE |
Landscape architecture |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a sealcoat soccer field, I.S. 117, 1865 Morris Avenue, Bronx |
Bronx |
DOE |
Landscape architecture |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a rooftop antenna system and equipment platform, 625 West 133rd Street, Manhattan |
Manhattan |
DOE |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of signage, P.S. 12 (Ronald Edmonds Learning Center II), 430 Howard Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a rooftop antenna system, 131 Walnut Avenue, Bronx |
Bronx |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island South Pump Station, South Loop Road and East Loop Road, Roosevelt Island, Manhattan |
Manhattan |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Roosevelt Island Main Pump Station, 728 Main Street, Roosevelt Island, Manhattan |
Manhattan |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Gildersleeve Avenue Pump Station, 208A Betts Avenue, Bronx |
Bronx |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, Sixth Road Pump Station, 627 151st Street, Queens. |
Queens |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 24th Avenue Pump Station, 23-50 Waters Edge Drive, Bayside, Queens |
Queens |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of a hatch and adjacent site work as a part of the DEP Wastewater Resiliency Program, 122nd Street Pump Station, 28-1 122nd Street, Jamaica, Queens |
Queens |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-04-20 |
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
Architecture |
Preliminary |
Approved with conditions |
2020-04-20 |