Projects (5,221)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Installation of a prototypical newsstand, 205 Montague Street, northwest corner of Cadman Plaza and Montague Street, Brooklyn Brooklyn DCA Newsstand Withdrawn 2017-02-13
Installation of signage, Transit Tech Career and Technical Education High School, 1 Wells Street, Brooklyn Brooklyn DOE Signage Commented 2017-02-13
Removal and conservation of Abstraction (1942) by Ilya Bolotowsky, Day Room B-11, Coler-Goldwater Specialty Care Hospital and Nursing Facility, Roosevelt Island, Manhattan Manhattan EDC Artwork Approved with conditions 2017-02-13
Reconstruction of Bergen Beach playground, adjacent to P.S. 312, Avenue N and East 71st Street, Brooklyn Brooklyn DPR Landscape architecture Approved 2017-02-13
Installation of bulkheads and adjacent site work, 30-01 and 32-11 Harper Street, Queens Queens EDC Landscape architecture Found incomplete 2017-02-13
Reconstruction of a playground and construction of a sidewalk, Ida Court Park, North Railroad Street, Ida Court (formerly Heenan Avenue), Drumgoole Road East, and Korean War Veterans Parkway, Staten Island Staten Island DPR Landscape architecture Approved 2017-02-13
Construction of an adult fitness area, Inwood Hill Park, Dyckman Street and the Hudson River, Manhattan Manhattan DPR Landscape architecture Approved 2017-02-13
Construction of two adult fitness areas, Alley Pond Park, 73rd Road and 224th Street, Union Turnpike and Winchester Boulevard, Oakland Gardens, Queens Queens DPR Landscape architecture Approved 2017-02-13
Installation of a prototypical newsstand, 590 Sixth Avenue, southeast corner of Sixth Avenue and East 17th Street, Manhattan Manhattan DCA Newsstand Commented 2017-02-13
1215 5th Avenue Distinctive Sidewalk at East 102nd Street, Manhattan Manhattan DOT Distinctive sidewalk Commented 2017-02-13
Construction of a utility building and installation of diesel fuel storage tanks, Pier C, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn Brooklyn EDC Architecture Commented 2017-02-13
Installation of nine distance markers, Astoria Park, Astoria, Queens Queens DPR Signage Commented 2017-02-13
Reconstruction of an artificial turf field, construction of an artificial turf field, and adjacent site work, Bloomingdale Park, Lenevar Avenue between Drumgoole Road West and Ramona Avenue, Staten Island Staten Island DPR Landscape architecture Commented 2017-02-13
Reconstruction of a playground, Evergreen Park, adjacent to P.S. 68, St. Felix Place, Seneca Avenue, and 75th Avenue, Ridgewood, Queens Queens DPR Landscape architecture Approved with conditions 2017-02-13
Reconstruction of the East River Esplanade, Phase I, East 88th Street to East 90th Street and East 114th Street to East 115th Street, Manhattan Manhattan DPR Landscape architecture Approved with conditions 2017-02-13
Construction of flood resiliency infrastructure, New York Aquarium, Coney Island Boardwalk, West 5th Street, Surf Avenue, and West 8th Street, Brooklyn Brooklyn DCLA Landscape architecture Approved 2017-02-13
Reconstruction of a pier, West 79th Street, adjacent to the Boat Basin, Riverside Park, Manhattan Manhattan DPR Architecture Commented 2017-02-13
Installation of an artificial turf field, Crotona Park, Crotona Park North at Prospect Avenue, Bronx Bronx DPR Landscape architecture Approved 2017-02-13
Rehabilitation of Broadway Malls, West 102nd Street to West 104th Street and West 137th Street to West 139th Street, Manhattan Manhattan DPR Landscape architecture Approved 2017-02-13
Design of prototypical subway entrances, citywide Citywide NYCT Architecture Commented 2017-02-13
Reconstruction of Astoria Health Playground, 14th Street between 31st Avenue and 31st Road, Astoria, Queens Queens DPR Landscape architecture Approved 2017-02-13
Installation of HVAC equipment, Manhattan Family Court, 60 Lafayette Street, Manhattan Manhattan DCAS Building systems & Modifications Approved with conditions 2017-02-13
Installation of an emergency generator, Eric M. Taylor Center, 10-10 Hazen Street, Rikers Island, East Elmhurst, Queens Queens DOC Building systems & Modifications Approved 2017-02-13
Installation of Wi-Fi equipment, Phase II, One Police Plaza, Manhattan Manhattan NYPD Street furniture Approved 2017-02-13
Installation of rooftop equipment, Queens Central Library, 89-11 Merrick Boulevard, Jamaica, Queens Queens QPL Building systems & Modifications Approved 2017-02-13
Installation of a prototypical newsstand, 2022 Fifth Avenue, northeast corner of Fifth Avenue and West 125th Street, Manhattan Manhattan DCA Newsstand Commented 2017-02-13
Construction of a fenced-in planted area, 339 Pacific Street, Brooklyn Brooklyn DOT Landscape architecture Approved 2017-02-13
Installation of a prototypical newsstand, 939 Third Avenue, northeast corner of Third Avenue and East 56th Street, Manhattan Manhattan DCA Newsstand Commented 2017-02-13
Reconstruction of Epiphany Playground, Berry Street between South 9th Street and South 10th Street, Brooklyn Brooklyn DPR Landscape architecture Approved 2017-02-13
Installation of a prototypical newsstand, 121 East 59th Street, northeast corner of 59th Street and Park Avenue, Manhattan Manhattan DCA Newsstand Withdrawn 2017-02-13
Reconstruction of Playground 35 XXXV, Steinway Street and 35th Avenue, Long Island City, Queens Queens DPR Landscape architecture Approved 2017-02-13
Replacement of field lighting, South Shore Babe Ruth Baseball League Ballfields, 635 Page Avenue, Staten Island Staten Island DDC Landscape architecture Commented 2017-02-13
Construction of stairs and a planted area, 2018 East 7th Street, Brooklyn Brooklyn DOT Landscape architecture Approved 2017-02-13
Reconstruction of a playground and construction of two entrance plazas, Friends Field Park, East 4th Street, Avenue L, McDonald Avenue, and Avenue M, Brooklyn Brooklyn DPR Landscape architecture Approved with conditions 2017-01-18
Interim rehabilitation of the 107th Street Pier, 107th Street, and the East River, Manhattan Manhattan DPR Landscape architecture Approved with conditions 2017-01-18
Rehabilitation of Broadway Malls, West 102nd Street to West 104th Street and West 137th Street to 139th Street, Manhattan Manhattan DPR Landscape architecture Found incomplete 2017-01-18
Installation of distinctive lighting, World's Fair lightpoles, Jamaica Avenue from Crescent Street to 129th Street, Jamaica, Queens Queens DOT Distinctive lighting Commented 2017-01-18
Reconstruction of athletic fields, Phase I, Red Hook Recreation Area, Lorraine Street, Henry Street, Bay Street, and Hicks Street, Brooklyn Brooklyn DPR Landscape architecture Approved 2017-01-18
Installation of photovoltaic panels, Brooklyn New School, J.H.S. 142, 610 Henry Street, Brooklyn Brooklyn DOE Building systems & Modifications Approved 2017-01-18
Installation of rooftop mechanical equipment and light fixtures, Tannersville Wastewater Treatment Plant, Hunter, Greene County Upstate DEP Building systems & Modifications Approved 2017-01-18
Installation of rooftop mechanical equipment and light fixtures, Grand Gorge Wastewater Treatment Plant, Grand Gorge, Roxbury, Delaware County Upstate DEP Building systems & Modifications Approved 2017-01-18
Installation of light fixtures, Pine Hill Wastewater Treatment Plant, Shandaken, Ulster County Upstate DEP Distinctive sidewalk Approved 2017-01-18
Reconstruction of the spillway channel walls, Amawalk Dam, Amawalk Road and Lake Road, Somers, Westchester County Upstate DEP Landscape architecture Approved 2017-01-18
Replication of a sword, General Josiah Porter (1902) by William Clark Noble, Van Cortlandt Park, Bronx Bronx DPR Artwork Approved 2017-01-18
Replication of a sword, General Gouverneur Kemble Warren (1893) by Henry Baerer, Grand Army Plaza, Brooklyn Brooklyn DPR Artwork Approved 2017-01-18
Construction of two plazas and adjacent site work, Brownsville Recreation Center, 1555 Linden Boulevard, Brooklyn Brooklyn DPR Landscape architecture Approved with conditions 2017-01-18
Reconstruction of a playground and athletic courts, Dutch Kills Playground, Crescent Street and 36th Avenue, Long Island City, Queens Queens DPR Landscape architecture Approved with conditions 2017-01-18
Construction of an ADA ramp, canopy, and ticket office, Yankee Stadium, 1 East 161st Street, Bronx Bronx DPR Building systems & Modifications Approved with conditions 2017-01-18
Installation of Luminescence by Nobuho Nagasawa, The Peninsula, Hunter's Point South Waterfront Park, 54th Avenue, Center Boulevard, 55th Avenue, and the East River, Long Island City, Queens Queens DCLA% Artwork Approved 2017-01-18
Installation of tower lighting, Building 77, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn Brooklyn BNYDC Distinctive lighting Approved with conditions 2017-01-18