| Construction of a waterfront park and streetscape improvements, Phase I, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Landscape architecture |
|
Commented |
2018-02-12 |
| Installation of prefabricated trailers, Glendale Yard, 69-46 Sybilla Street, Forest Hills, Queens |
Queens |
DOT |
Architecture |
Preliminary and Final |
Approved with conditions |
2018-02-12 |
| Reconstruction of a playground and basketball courts, Patterson Playground, adjacent to P.S. 18, College Avenue, East 145th Street, Morris Avenue, and East 148th Street, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2018-02-12 |
| Rehabilitation of a comfort station and a utility building, Betsy Head Park, Dumont Avenue, Thomas S. Boyland Street, Livonia Avenue, and Strauss Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary |
Approved |
2018-02-12 |
| Reconstruction of the Pelham Parkway malls, Phase I, Boston Road to Wallace Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Commented |
2018-02-12 |
| Brooklyn Heights Library bas relief panels |
Brooklyn |
BPL |
Artwork |
|
Commented |
2018-02-12 |
| Construction of an environmental learning center (Solar 2), 24-20 FDR Drive at Peter Cooper Road, Manhattan |
Manhattan |
EDC |
Architecture |
|
Commented |
2018-02-12 |
| Conservation and relocation of the Washington Kill Von Kull Monument (1932), Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island |
Staten Island |
DPR |
Artwork |
Preliminary |
Approved |
2018-01-17 |
| Design of prototypical building identification signage for installation citywide |
Citywide |
DOHMH |
Signage |
|
Commented |
2018-01-17 |
| Rehabilitation of the East 175th Street Bridge over Metro North Railroad, Bronx |
Bronx |
DOT |
Bridge |
Preliminary and Final |
Approved |
2018-01-17 |
| Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
|
Commented |
2018-01-17 |
| Reconstruction of Callahan-Kelly Park, Broadway Junction, Van Sinderen Avenue, Truxton Street, Eastern Parkway, and Fulton Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2018-01-17 |
| Installation of a prototypical newsstand, 1451 Second Avenue, southwest corner of Second Avenue and East 76th Street, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2018-01-17 |
| Installation of a distinctive sidewalk, Museum of Modern Art, 11 West 53rd Street, Manhattan |
Manhattan |
DOT |
Distinctive sidewalk |
|
Commented |
2018-01-17 |
| Reconstruction of Thomas Boyland Park, Broadway between Granite Street and Aberdeen Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2018-01-17 |
| Installation of a prototypical newsstand, 506 Lenox Avenue, northeast corner of Lenox Avenue and West 135 Street, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2018-01-17 |
| Installation of signage as part of the reconstruction of the Studio Museum in Harlem, 144 West 125th Street, Manhattan |
Manhattan |
DCLA |
Signage |
|
Commented |
2018-01-17 |
| Installation of a prototypical newsstand, Broadway and West 165th Street, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2018-01-17 |
| Construction of three carriage houses, Staten Island Historical Society, 145 Arthur Kill Road, Staten Island |
Staten Island |
DDC |
Architecture |
|
Commented |
2018-01-17 |
| Reconstruction of Hart Playground, formerly knowns as Eight Oaks Trapezoid Park, Broadway, 69th Street, 37th Avenue, and 65th Street, Woodside, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2018-01-17 |
| Reconstruction of Hugh J. Grant Circle and Virginia Park, White Plains Road, Westchester Avenue, and the Cross Bronx Expressway, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Commented |
2018-01-17 |
| Installation of Convergence by Shawn Smith, Westchester Square Branch Library, 9 Westchester Square, Bronx |
Bronx |
DCLA% |
Artwork |
Preliminary |
Approved |
2018-01-17 |
| Installation of a distinctive sidewalk, 572 11th Avenue, Manhattan |
Manhattan |
DOT |
Distinctive sidewalk |
|
Commented |
2018-01-17 |
| Installation of rooftop equipment, Anna M. Kross Center, Buildings 1, 2, 3, 4 & 5, 18-18 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2018-01-17 |
| Installation of a prototypical newsstand, 2520 Broadway, northeast corner of Broadway and West 94th Street, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2018-01-17 |
| Reconstruction of a portion of Times Plaza, Flatbush Avenue, Atlantic Avenue, and 4th Avenue, Brooklyn |
Brooklyn |
DOT |
Landscape architecture |
Preliminary |
Approved with conditions |
2018-01-17 |
| Construction of a combined sewer overflow (CSO) facility, Gowanus Canal, Butler Street, Nevins Street, and Degraw Street, Brooklyn |
Brooklyn |
DEP |
Architecture |
|
Commented |
2018-01-17 |
| Installation of Luminescence by Nobuho Nagasawa, The Peninsula, Hunter's Point South Waterfront Park, 54th Avenue, Center Boulevard, 55th Avenue, and the East River, Long Island City, Queens |
Queens |
EDC |
Artwork |
Final |
Approved |
2018-01-17 |
| Installation of rooftop mechanical equipment, Bronx Terminal Market, 401 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2018-01-17 |
| Construction of two picnic areas and adjacent site work, Prospect Park, East Drive at Parkside Avenue and Lincoln Road, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2018-01-17 |
| Restoration of landscape, including tree plantings, Shore Belt Parkway over Gerritsen Inlet, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2018-01-17 |
| Reconstruction of Abraham Lincoln Playground, East 135th Street, between 5th Avenue and Madison Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved |
2018-01-17 |
| Rehabilitation of Lost Battalion Hall, 93-29 Queens Boulevard, Rego Park, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved |
2018-01-17 |
| Reconstruction of a playground, McDonald Playground, McDonald Avenue, Avenue S, East 1st Street, and Avenue T, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2018-01-17 |
| Construction of a recreation trail and adult fitness area and reconstruction of the picnic area, Glendale Entrance, Forest Park, Forest Park Drive, Myrtle Avenue, and Jackie Robinson Parkway, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2018-01-17 |
| Construction of a playground and reconstruction of athletic courts, Pulaski Park, Bruckner Boulevard and the Willis Avenue Bridge, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2018-01-17 |
| Installation of signage, Sherwin Williams Paints, 2333 Cross Bronx Expressway, Bronx |
Bronx |
DCAS |
Signage |
|
Commented |
2018-01-17 |
| Reconstruction of Plimpton Playground, West 172nd Street, Plimpton Avenue, and Edward L. Grant Highway, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Approved |
2017-12-11 |
| Construction of a concrete facility (Ferrara Brothers), 730 3rd Avenue between 24th Street, 25th Street, and the Gowanus Canal, Brooklyn |
Brooklyn |
EDC |
Architecture |
|
Commented |
2017-12-11 |
| Reconstruction of Fairview Park, Phase I, Englewood Avenue, Arthur Kill Road, Veterans Road West, and Bricktown Way, Staten Island |
Staten Island |
DPR |
Landscape architecture |
|
Commented |
2017-12-11 |
| Installation of an adult fitness area, J. Hood Wright Park, Fort Washington Avenue and West 176th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
|
Approved |
2017-12-11 |
| Installation of a prototypical newsstand, 404 10th Avenue, southeast corner of 10th Avenue and West 33rd Street, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Approved |
2017-12-11 |
| Installation of a loading dock extension, Hunts Point Food Distribution Center, 355 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
|
Approved |
2017-12-11 |
| Construction of boardwalk access ramps and adjacent site work, Rockaway Beach between Beach 60th Street and Beach 86th Street, Arverne, Queens |
Queens |
HPD |
Landscape architecture |
|
Approved with conditions |
2017-12-11 |
| Construction of a rooftop canopy with photovoltaic panels, Court Square Parking Garage, 45-40 Court Square West, Long Island City, Queens |
Queens |
DCAS |
Building systems & Modifications |
|
Commented |
2017-12-11 |
| Construction of a garden entrance and adjacent site work, Dag Hammarskjold Plaza, East 47th between 1st Avenue and 2nd Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
|
Approved |
2017-12-11 |
| Construction of a freight rail platform, Hunts Point Terminal Produce Market, 101 Food Center Drive, Bronx |
Bronx |
EDC |
Architecture |
|
Approved |
2017-12-11 |
| Construction of a canopy with photovoltaic panels, Manhattan Beach Park Parking Lot, Manhattan Beach Park, 760 Oriental Boulevard, between Irwin Street and Langham Street, Brooklyn |
Brooklyn |
DCAS |
Architecture |
|
Commented |
2017-12-11 |
| Conservation of William Cullen Bryant (1911) by Herbert Adams, Bryant Park, 42nd Street, 5th Avenue, 40th Street, and 6th Avenue, Manhattan |
Manhattan |
DPR |
Artwork |
|
Approved |
2017-12-11 |
| Reconstruction of a playground and adjacent site work, Asser Levy Park, Sea Breeze Avenue, West Fifth Street, and Surf Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2017-12-11 |