| Replacement of rooftop mechanical equipment, Queens Central Library, 89-11 Merrick Boulevard, Jamaica, Queens |
Queens |
QPL |
Building systems & Modifications |
Preliminary and Final |
|
2025-04-07 |
| Minor modifications to the installation of rooftop HVAC equipment, Queens Borough Hall, 120-55 Queens Boulevard, Kew Gardens, Queens |
Queens |
DCAS |
Building systems & Modifications |
Amended Final |
|
2025-04-07 |
| Installation of a mechanical unit at the lower roof, Bronx County District Attorney’s Office Data Center, 198 East 161st Street, Bronx |
Bronx |
DCAS |
Building systems & Modifications |
Preliminary and Final |
|
2025-04-07 |
| Reconstruction of a roof including installation of photovoltaic panels, FIT Haft Theater Center, Fashion Institute of Technology, 243 West 27th Street, Manhattan |
Manhattan |
DOE |
Building systems & Modifications |
Preliminary and Final |
|
2025-04-07 |
| Installation of tenant signage (Circle Line and The BEAST), Pier 81, Hudson River Park, west of Route 9A bikeway at West 41st Street, Manhattan |
Manhattan |
DPR/HRPT |
Signage |
Preliminary and Final |
|
2025-04-07 |
| Minor modifications to the construction of flood protection measures as part of the South Battery Park City Resiliency master plan, Battery Place between 1st Place and Little West Street, Pier A Plaza, and The Battery, Manhattan |
Manhattan |
EDC/DOT/DPR/BPCA |
Landscape architecture |
Amended Final |
|
2025-04-07 |
| Installation of a generator, Engine Company 16, 234 East 29th Street, Manhattan |
Manhattan |
FDNY |
Building systems & Modifications |
Preliminary and Final |
|
2025-04-07 |
| Reconstruction of a dock, Harper Street Yard, 30-01 Harper Street, Corona, Queens |
Queens |
EDC/DOT |
Architecture |
Preliminary and Final |
|
2025-03-24 |
| Installation of identification signage, Downtown Manhattan Heliport, Pier 6, 20 South Street, Manhattan |
Manhattan |
EDC |
Signage |
Preliminary and Final |
|
2025-03-24 |
| Reconstruction of the East River Esplanade, 107th Street Pier, and Bobby Wagner Walk, East 94th Street to East 107th Street, and East 117th Street to East 124th Street, Manhattan |
Manhattan |
EDC/DPR |
Landscape architecture |
Final |
|
2025-03-24 |
| Stabilization of the shoreline and restoration of wetlands, Pier 7, Bush Terminal Industrial Campus (Made in NY), adjacent to Marginal Way between 39th Street and 41st Street, Brooklyn |
Brooklyn |
EDC/SBS |
Landscape architecture |
Preliminary and Final |
|
2025-03-24 |
| Reconstruction of the Pelham Parkway malls, Phase II, White Plains Road to Stillwell Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2025-03-24 |
| Reconstruction of a portion of Equity Playground, adjacent to P.S. 60, 88th Avenue, 90th Street, and 89th Avenue, Woodhaven, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2025-03-24 |
| Installation of Wings of Everchange 易之翼 by Jennifer Wen Ma, 70 Mulberry Street, Manhattan |
Manhattan |
DCLA%/DDC/DCAS |
Artwork |
Preliminary |
|
2025-03-24 |
| Reconstruction of a portion of Maurice A. Fitzgerald Playground, 106th Street between 94th Avenue and Atlantic Avenue, Ozone Park, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2025-03-24 |
| Reconstruction of a bike park, Reverend T. Wendell Foster Park, East 164th Street, River Avenue, and East 165th Street, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2025-03-24 |
| Reconstruction of Baseball Field #7, Juniper Valley Park, Juniper Boulevard South near 74th Street, Middle Village, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2025-03-24 |
| Stabilization of the shoreline between the Upper Effluent Chamber and the cove as part of the Kensico-Eastview Connection Project, Kensico Reservoir, Valhalla, Mount Pleasant, Westchester County |
Upstate |
DEP |
Landscape architecture |
Preliminary and Final |
|
2025-03-24 |
| Construction of a wetland as part of the Kensico-Eastview Connection Project, adjacent to King Street and New York Highway Route 120, Big Peninsula, Kensico Reservoir, Town of New Castle, Westchester County |
Upstate |
DEP |
Landscape architecture |
Preliminary and Final |
|
2025-03-24 |
| Rehabilitation of the Upper Effluent Chamber as part of the Kensico-Eastview Connection Project, Kensico Reservoir, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
Building systems & Modifications |
Final |
|
2025-03-24 |
| Construction of an electrical building and adjacent site work, Oakwood Beach Water Pollution Control Plant, 751 Mill Road, Staten Island |
Staten Island |
DEP |
Architecture |
Amended Final |
|
2025-03-24 |
| Reconstruction of Caserta Playground and installation of a subsurface detention system as a part of the Cloudburst Management Program for the Parkchester and Morris Park Cloudburst Hub, Odell Street, St. Raymond Avenue, and Purdy Street, Bronx |
Bronx |
DEP/DPR |
Landscape architecture |
Preliminary |
|
2025-03-24 |
| Construction of an electrical substation and adjacent site work, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
Architecture |
Final |
|
2025-03-24 |
| Reconstruction of a portion of Bensonhurst Park, 21st Avenue, 21st Drive, Belt Parkway, Bay Parkway, and Cropsey Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-03-24 |
| Construction of prototypical sidewalk extensions and medians as part of the design for select bus service citywide, 79th Street Crosstown M79 service, West 79th Street between Riverside Drive and West End Avenue, West 79th Street and a portion of the Broadway Malls, West 81st Street and Central Park West, East 79th Street and Fifth Avenue, East 79th Street between Madison Avenue and Park Avenue, East 79th Street between Lexington Avenue and FDR Drive, and East 80th Street between York Avenue and FDR Drive, Manhattan |
Manhattan |
DDC/DOT/DPR |
Landscape architecture |
Preliminary and Final |
|
2025-03-24 |
| Reconstruction of a portion of Frederick Douglass Playground, West 100th Street and Amsterdam Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
|
2025-03-24 |
| Reconstruction of an office building for use as a police precinct, DEP Police 7th Precinct, 750 McLean Avenue, Yonkers, Westchester County |
Upstate |
DEP |
Architecture |
Preliminary |
|
2025-03-24 |
| Installation of Bookmobile and Crown by Melvin Nesbitt Jr., Red Hook Library, 7 Wolcott Street, Brooklyn |
Brooklyn |
DCLA%/EDC/BPL |
Artwork |
Conceptual and Preliminary |
|
2025-03-24 |
| Rehabilitation of Washington Irving Branch Library and adjacent site work, 360 Irving Avenue, Brooklyn |
Brooklyn |
DDC/BPL |
Architecture |
Final |
|
2025-03-24 |
| Reconstruction of a portion of Renaissance Playground, adjacent to P.S. 194, West 143rd Street, Frederick Douglass Boulevard, and West 144th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
|
2025-03-24 |
| Reconstruction of Canarsie Branch Library, 1580 Rockaway Parkway, Brooklyn |
Brooklyn |
BPL |
Architecture |
Final |
|
2025-03-24 |
| Reconstruction of the garden, Mapleton Branch Library, 1702 60th Street, Brooklyn |
Brooklyn |
DDC/BPL |
Landscape architecture |
Amended Final |
|
2025-03-24 |
| Reconstruction of Lou Lodati Playground and the dog run, Torsney Playground, Skillman Avenue between 41st Street and 42nd Street, Sunnyside, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-03-24 |
| Reconstruction of an ADA ramp, New York Academy of Medicine, 1216 Fifth Avenue, Manhattan |
Manhattan |
DOT |
Building systems & Modifications |
Preliminary and Final |
|
2025-03-10 |
| Installation of rooftop equipment, Building A (Made in NY-North), Bush Terminal Industrial Campus, 13 42nd Street, Brooklyn |
Brooklyn |
EDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-03-10 |
| Minor modifications to the reconstruction of a community center, 70 Mulberry Street at Bayard Street, Manhattan |
Manhattan |
DDC/DCAS |
Architecture |
Amended Final |
|
2025-03-10 |
| Minor modifications to the construction of the Douglaston-Little Neck Library, 249-01 Northern Boulevard, Little Neck, Queens |
Queens |
DDC/QPL |
Architecture |
Amended Final |
|
2025-03-10 |
| Installation of I Am Protected by Jazmine Hayes, Brownsville Multiservice Center and Community Hub (previously Brownsville Youth Empowerment Center and Community Hub), 444 Thomas S. Boyland Street between East New York Avenue and Pitkin Avenue, Brooklyn |
Brooklyn |
DCLA%/DDC |
Artwork |
Preliminary |
|
2025-02-24 |
| Reconstruction of the Randall's Island Nature Center and adjacent site work, 1 Central Road, north of Hell Gate Circle, east of the Wards Island Wastewater Treatment Plant, Randall's Island, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary |
|
2025-02-24 |
| Installation of façade graphics for a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Architecture |
Preliminary |
|
2025-02-24 |
| Installation of interpretive signage, as part of the reconstruction of the Easter River Esplanade, 107th Street Pier, and Bobby Wagner Walk, East 94th Street to 107th Street, and East 117th Street to East 124th Street, Manhattan |
Manhattan |
EDC |
Signage |
Preliminary |
Commented |
2025-02-24 |
| Reconstruction of Bronx Skate Park, Bronx Park, Bronx Park East and Britton Street, Bronx |
Bronx |
EDC/DPR |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Reconstruction of the perimeter retaining wall and an ADA ramp, McLaughlin Park, Tillary Street, Jay Street, Cathedral Place and Flatbush Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Reconstruction of a skate park, Brower Park, adjacent to P.S. 289, St. Marks Avenue, Brooklyn Avenue, and Kingston Avenue, Brooklyn |
Brooklyn |
DPR/EDC |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Construction of a dog run, Irving Square Park, Weirfield Street, Knickerbocker Avenue, Halsey Street, and Wilson Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Stabilization of the shoreline, reconstruction of the street end and adjacent site work, Lipsett Avenue, Staten Island |
Staten Island |
EDC/DPR/DOT |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Reconstruction of a retaining wall including installation of guardrails, Kissena Park, south of the public restroom building, Oak Avenue and 164th Street, Flushing, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Rehabilitation of the garage and marina, Skyport Marina and Seaplane Terminal, 2430 FDR Drive Service Road at East 23rd Street and East River, Manhattan |
Manhattan |
EDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-02-24 |
| Reconstruction of the plaza, including the removal of a distinctive sidewalk, 60 Centre Street, Thomas Paine Park, Manhattan |
Manhattan |
DDC |
Landscape Architecture |
Preliminary and Final |
Commented |
2025-02-24 |
| Construction of a community center and adjacent site work, Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx |
Bronx |
DPR |
Architecture |
Preliminary |
|
2025-02-24 |