Projects (5,221)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Installation of signage, P.S. 9 (The Sarah Smith Garnet School, formerly The Teunis Bergen School), 80 Underhill Avenue, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2020-01-21
Construction of an addition and installation of three ADA ramps and rooftop mechanical equipment, Rose M. Singer Center, 19-19 Hazen Street, Rikers Island, Bronx Bronx DOC Architecture Preliminary and Final Approved 2020-01-21
Construction of an addition and installation of rooftop mechanical equipment, George R. Vierno Center, 09-09 Hazen Street, Rikers Island, Bronx Bronx DOC Architecture Preliminary and Final Approved 2020-01-21
Rehabilitation of the Corona Health Center, 34-33 Junction Boulevard, Jackson Heights, Queens Queens DDC Architecture Preliminary Approved 2020-01-21
Installation of a prototypical newsstand, 3865 Tenth Avenue, southeast corner of Tenth Avenue and West 207th Street, Manhattan Manhattan DCA Newsstand Preliminary and Final Approved 2020-01-21
Installation of Bachmann’s Knot by DB Lampman, Stapleton Waterfront and Park, Murray Hulbert Avenue north of Wave Street, Staten Island Staten Island EDC Artwork Preliminary Approved 2020-01-21
Reconstruction of a ballfield (Ballfield 3) and construction of a utility building, McCarren Park, Bedford Avenue, Lorimer Avenue, Driggs Avenue, and North 12th Street, Brooklyn Brooklyn DPR Landscape architecture Final Approved 2020-01-21
Rehabilitation of a comfort station, Sheltering Arms Playground, West 129th Street, Amsterdam Avenue, West 126th Street, and Old Broadway, Manhattan Manhattan DPR Architecture Final Approved 2020-01-21
Installation of a vent pipe, 625 Atlantic Avenue, Brooklyn Brooklyn EDC Building systems & Modifications Preliminary and Final Approved 2020-01-21
Installation of rooftop mechanical equipment, 565 West Street, Manhattan Manhattan EDC Building systems & Modifications Preliminary and Final Approved 2020-01-21
Construction of an adult fitness area, Ewen Park, Johnson Avenue, West 232nd Street, and Riverdale Avenue, Bronx Bronx DPR Landscape architecture Final Approved 2020-01-21
Construction of an addition to the Riverdale Equestrian Center, Van Cortlandt Park, 6100 Mosholu Avenue, Bronx Bronx DPR Architecture Preliminary and Final Approved 2020-01-21
Installation of skateboard deterrents, New York City AIDS Memorial, St. Vincent's Hospital Park, Seventh Avenue, West 12th Street, and Greenwich Avenue, Manhattan Manhattan DPR Landscape architecture Preliminary and Final Approved 2020-01-21
Installation of a rooftop generator, Engine Company 299/Ladder Company 152, 61-20 Utopia Parkway, Fresh Meadows, Queens Queens FDNY Building systems & Modifications Preliminary and Final Approved 2020-01-21
Installation of rooftop mechanical equipment, windows, and a generator, Ladder Company 20, 251 Lafayette Street, Manhattan Manhattan FDNY Building systems & Modifications Preliminary and Final Approved 2020-01-21
Rehabilitation of Engine Company 307, 81-17 Northern Boulevard, Jackson Heights, Queens Queens FDNY Building systems & Modifications Preliminary and Final Approved 2020-01-21
Reconstruction of Redwood Upper Playground, Cunningham Park, 193rd Street between Aberdeen Road and Radnor Road, Fresh Meadows, Queens Queens DPR Landscape architecture Preliminary Approved 2020-01-21
Construction of an ADA entrance, Hamilton Fish Park, East Houston Street, Columbia Street, Stanton Street, and Pitt Street, Manhattan Manhattan DPR Landscape architecture Preliminary and Final Approved 2020-01-21
Reconstruction of a portion of L/CPL Thomas P. Noonan Jr. Playground, including a plaza and dog run, Greenpoint Avenue and 42nd Street, Sunnyside, Queens Queens DPR Landscape architecture Preliminary Approved 2020-01-21
Construction of Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens Queens DPR Landscape architecture Preliminary Approved 2020-01-21
Construction of a prototypical comfort station, Harlem River Park, Harlem River Drive, East 128th Street, and the Third Avenue Bridge, Manhattan Manhattan DPR Architecture Preliminary Approved 2020-01-21
Construction of an ADA ramp and adjacent site work, West 79th Street Rotunda, Riverside Park, West Terminus of 79th Street between Henry Hudson Parkway and the Hudson River, Manhattan Manhattan DOT Landscape architecture Preliminary and Final Approved with conditions 2020-01-21
Rehabilitation of the Springfield Boulevard Bridge over the Belt Parkway, Springfield Boulevard between North Conduit Avenue and South Conduit Avenue, Jamaica, Queens Queens DOT Bridge Preliminary and Final Approved 2020-01-21
Rehabilitation of the Hillside Avenue Bridge over the Cross Island Parkway, Hillside Avenue between 243rd Street and Commonwealth Boulevard, Jamaica, Queens Queens DOT Bridge Preliminary and Final Approved 2020-01-21
Rehabilitation of the 130th Street Bridge over the Belt Parkway, 130th Street between Laurelton Parkway and Brookville Boulevard, Rosedale, Queens Queens DOT Bridge Preliminary and Final Approved 2020-01-21
Installation of a distinctive sidewalk, including bollards, Manhattan West, 442 West 33rd Street, between Dyer Avenue and Ninth Avenue, Manhattan Manhattan DOT Distinctive sidewalk Preliminary and Final Approved 2020-01-21
Installation of a prototypical newsstand, 787 Seventh Avenue, northeast corner of West 51st street and Seventh Avenue, Manhattan Manhattan DCA Newsstand Preliminary and Final Commented 2020-01-20
Renovation of the Borough Park Library, 1265 43rd Street, Brooklyn Brooklyn DDC Architecture Commented 2020-01-20
Construction of an addition and adjacent site work, Brownsville Library, 61 Glenmore Avenue, Brooklyn Brooklyn DDC Architecture Commented 2020-01-20
Installation of signage (existing), Strong Place for Hope Day Care (previously Second Street Day Care Center), 225-333 Second Street, Brooklyn Brooklyn DOE Signage Commented 2020-01-20
Reconstruction of Sandpiper Playground, Shore Front Parkway, Beach 108th Street, Rockaway Park, Queens Queens DPR Landscape architecture Commented 2020-01-20
Installation of Raycap mobile telecom equipment boxes on light poles Citywide Citywide DoITT Street furniture Commented 2020-01-20
Reconstruction of Ten Eyck Playground, adjacent to P.S. 196, Scholes Street and Meserole Street between Bushwick Avenue and Waterbury Street, Brooklyn Brooklyn DPR Landscape architecture Commented 2020-01-20
Construction of streetscape improvements, including the Under the El toolkit, Jerome Avenue at Burnside Avenue, at Tremont Avenue, and at Keltch Park, Bronx Bronx DDC Landscape architecture Commented 2020-01-20
Reconstruction of Marcy Green Park, Marcy Avenue between South 3rd Street and Broadway Avenue, Brooklyn Brooklyn DPR Landscape architecture Commented 2020-01-20
Construction of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront, Phase III, Kent Avenue between North 9th Street and North 15th Street, Brooklyn Brooklyn DPR Landscape architecture Commented 2020-01-20
Construction of a comfort station, Aqueduct Walk, Aqueduct Avenue East between West 182nd Street and West 183rd Street, Bronx Bronx DPR Architecture Commented 2020-01-20
Construction of an addition, East Elmhurst (formerly North Beach) Community Library, 95-08 Astoria Boulevard, Queens Queens DDC Architecture Commented 2020-01-20
Installation of interim flood protection measures, East River Waterfront from Wall Street to Catherine Slip, Manhattan Manhattan EM Landscape architecture Preliminary and Final Commented 2020-01-20
Installation of a prototypical newsstand, 572 West 207th Street, southeast corner of West 207th Street and Vermilyea Avenue, Manhattan Manhattan DCA Newsstand Preliminary and Final Commented 2020-01-20
Installation of interim flood protection measures, Conner Street Yard, 3200 Conner Street, Bronx Bronx EM Landscape architecture Preliminary and Final Commented 2020-01-20
Construction of a covered artificial turf field and comfort station (FC Harlem), adjacent to the North River Wastewater Treatment Plant and Riverbank State Park, West 145th Street and the Henry Hudson Parkway, Manhattan Manhattan DEP Landscape architecture Commented 2020-01-20
Installation of interim flood protection measures, Metropolitan Hospital, 1902 Second Avenue, Manhattan Manhattan EM Landscape architecture Preliminary and Final Commented 2020-01-20
Installation of interim flood protection measures, 60th Police Precinct, 2951 West Eighth Street, Brooklyn Brooklyn EM Landscape architecture Preliminary and Final Commented 2020-01-20
Installation of fuel tank access hatches, DCA Central Testing Station, 245 Meserole Avenue, Brooklyn Brooklyn DDC Building systems & Modifications Preliminary and Final Commented 2019-12-16
Reconstruction of Maple Playground, Maple Avenue and Kissena Boulevard, Flushing, Queens Queens DPR Landscape architecture Preliminary Approved 2019-12-16
Rehabilitation of Engine Company 266, 92-20 Rockaway Beach Boulevard, Far Rockaway, Queens Queens FDNY Architecture Preliminary and Final Approved 2019-12-16
Rehabilitation of a comfort station and adjacent site work, Commodore Barry Park, Flushing Avenue between Navy Street and North Elliott Place, Brooklyn Brooklyn DPR Architecture Preliminary Approved with conditions 2019-12-16
Rehabilitation of a comfort station, Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East and Kepler Avenue, Bronx Bronx DPR Architecture Preliminary Approved 2019-12-16
Installation of sports lighting at tennis courts, McCarren Park, Bedford Avenue, North 12th Street, and Berry Street, Brooklyn Brooklyn DPR Landscape architecture Preliminary and Final Approved 2019-12-16