| Reconstruction of handball courts, fitness area, seating areas, and adjacent site work, Rockaway Beach, Shore Front Parkway between Beach 103rd Street and Beach 105th Street, Rockaway Park, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2020-07-13 |
| Reconstruction of Dongan Playground, adjacent to P.S. 52, Dongan Hills Avenue, Mason Avenue, and Buel Avenue, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2020-07-13 |
| Construction of a prototypical comfort station, Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved |
2020-07-13 |
| Construction of a maintenance building and comfort station, Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved with conditions |
2020-07-13 |
| Rehabilitation of Emergency Medical Services 4 (EMS 4), including the installation of an emergency generator, Pier 36, 270 South Street, Manhattan |
Manhattan |
FDNY |
Architecture |
Preliminary and Final |
Approved |
2020-07-13 |
| Installation of an interim open space, Willoughby Street, Duffield Street and Gold Street, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Preliminary and Final |
Approved |
2020-07-13 |
| Reconstruction of Mercer Playground, Phase I, Mercer Street between Bleecker Street and West 3rd Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-07-13 |
| Construction of an entrance on Bleecker Street at Mercer Street, New York University, 181 Mercer Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2020-07-13 |
| Reconstruction of the East River Esplanade, Phase II, East 115th Street to East 117th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved with conditions |
2020-07-13 |
| Reconstruction of Ten Eyck Plaza, Ten Eyck Street and Stagg Street between Union Avenue and Lorimer Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2020-07-13 |
| Construction of a comfort station, Monsignor Kett Playground, West 204th Street between Nagle Avenue and Tenth Avenue, Manhattan |
Manhattan |
DPR |
Architecture |
Final |
Approved |
2020-07-13 |
| Construction of a skate park, Jerome Playground South, Jerome Avenue, Cross Bronx Expressway, and Townsend Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-07-13 |
| Conservation of Dante Alighieri (1921) by Ettore Ximenes, Dante Park, Columbus Avenue, Broadway, and West 63rd Street, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
Approved |
2020-07-13 |
| Installation of doors, louvers, and mechanical equipment, Building 28 (Bednark Fabrication Studio), Fifth Street between Morris Avenue and Market Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary and Final |
Approved |
2020-07-13 |
| Reconstruction of a substation, Building 62, Fifth Street between Morris Avenue and Market Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary |
Approved with conditions |
2020-07-13 |
| Installation of mechanical equipment, Morrisania Health Center, 1309 Fulton Avenue, Bronx |
Bronx |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2020-07-13 |
| Installation of mechanical equipment, Riverside Health Center, 106 West 100th Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2020-07-13 |
| Installation of mechanical equipment, Chelsea District Health Center, 303 Ninth Avenue, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2020-07-13 |
| Installation of mechanical equipment, Central Harlem Health Center, 2238 Fifth Avenue, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2020-07-13 |
| Installation of security infrastructure, Heschel School, 30 West End Avenue, West End Avenue, West 60th Street, and West 61st Street, Manhattan |
Manhattan |
DOT |
Street furniture |
Preliminary and Final |
Commented |
2020-06-22 |
| Construction of a prototypical comfort station, Saw Mill Playground, adjacent to P.S. 179, East 140th Street and East 139th Street between Willis Avenue and Brook Avenue, Bronx |
Bronx |
DPR |
Architecture |
|
Commented |
2020-06-22 |
| Reconstruction of the Baptist Church Road Bridge over Hunter Brook, Baptist Church Road between Croton Avenue and Hunterbrook Road, Town of Yorktown, Westchester County |
Upstate |
DEP |
Bridge |
|
Commented |
2020-06-22 |
| Design of a wayfinding and signage, East River Science Park (Alexandria Center for Life Science), 500 East 30th Street between First Avenue, the FDR Drive, East 28th Street, and East 30th Street, Manhattan |
Manhattan |
EDC |
Signage |
|
Commented |
2020-06-22 |
| Construction of a storage and maintenance building, Madison Square Park, Madison Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
Architecture |
|
Commented |
2020-06-22 |
| Construction of a mixed-use development and waterfront esplanade (Bronx Point), Major Deegan Expressway, 145th Street Bridge, East 150th Street, and the Harlem River, Bronx |
Bronx |
EDC |
Architecture |
Preliminary |
Commented |
2020-06-22 |
| Installation of a citric acid storage tank, Sludge Dewatering Facility, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Architecture |
|
Commented |
2020-06-22 |
| Construction of a reading garden, Bellerose Playground, adjacent to P.S. 133, 249th Street between 85th Avenue and 86th Avenue, Bellerose Manor, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2020-06-22 |
| Reconstruction of a portion of Rainbow Playground, Sixth Avenue between 55th Street and 56th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2020-06-22 |
| Installation of flood barriers, Hunts Point Food Distribution Center, 355 Food Center Drive, Bronx |
Bronx |
EM |
Building systems & Modifications |
|
Commented |
2020-06-22 |
| Relocation of Charging Bull Relocation by Arturo Di Modica, from Bowling Green to the southeast corner of Broad Street and Wall Street, Manhattan |
Manhattan |
DOT |
Artwork |
Conceptual |
Rejected |
2020-06-22 |
| Reconstruction of a portion of Kelly Playground, adjacent to P.S. 255, East 17th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2020-06-22 |
| Construction of a cafe addition, storage building, and adjacent site work, McCarren Park House, McCarren Park, between Lorimer Street, Bedford Avenue, and Driggs Avenue, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary |
Approved with conditions |
2020-06-22 |
| Reconstruction of a portion of L/CPL Thomas P. Noonan Jr. Playground, including a plaza and dog run, Greenpoint Avenue and 42nd Street, Sunnyside, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2020-06-22 |
| Temporary installation of Peacock (Short-tailed) (1920) and Peacock (Long-tailed) (1928) by Gaston Lachaise, Bartow Pell Mansion, Pelham Bay Park, Bronx |
Bronx |
DPR |
Artwork |
Preliminary and Final |
Approved with conditions |
2020-06-22 |
| Construction of a prototypical comfort station and adjacent site work, Seaside Wildlife Nature Park, Nelson Avenue and Tennyson Drive, Staten Island |
Staten Island |
DPR |
Architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Reconstruction of the Inwood Hill Ballfields, Inwood Hill Park, West 214th Street and Seaman Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-06-22 |
| Reconstruction of Davidson Playground, Davidson Avenue between West 176th Street and West 177th Street, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2020-06-22 |
| Construction of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront, Phase III, Kent Avenue between North 9th Street and North 15th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2020-06-22 |
| Construction of a prototypical comfort station and adjacent site work, Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved with conditions |
2020-06-22 |
| Reconstruction of an ADA ramp, 125th Street Branch Library, 224 East 125th Street, Manhattan |
Manhattan |
DOT |
Architecture |
Preliminary and Final |
Approved with conditions |
2020-06-22 |
| Installation of interim flood protection measures as part of the Battery Park City Resiliency Plan, Battery Park City Ballfields and Community Center, Warren Street, West Street, and Murray Street, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Installation of a wireless router and antenna on light poles, Brooklyn, Queens, and Staten Island |
Citywide |
DOT |
Street furniture |
Preliminary and Final |
Approved |
2020-06-22 |
| Construction of a stoop and fenced-in area, 31 Third Street, Brooklyn |
Brooklyn |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Installation of a sealcoat soccer pitch, P.S. 18, 221 Broadway, Staten Island |
Staten Island |
DOE |
Landscape architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Zerega Avenue Pump Station, 2171 Hart Street, Bronx |
Bronx |
DEP |
Architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Richmond Hill Road Pump Station, Richmond Hill Road and Richmond Avenue, Staten Island |
Staten Island |
DEP |
Architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Construction of a maintenance yard, including prefabricated trailers, storage containers, and adjacent site work, DEP Green Infrastructure Satellite Facility, 62 White Street, Brooklyn |
Brooklyn |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2020-06-22 |
| Installation of a conduit support system, Final Settling Tanks, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2020-06-22 |
| Construction of an addition to the Pump and Power House, reconstruction of the guard house, installation of a digester gas conditioning system adjacent to the Old Power House, and adjacent site work, Coney Island Wastewater Resource Recovery Facility, 2591 Knapp Street, Brooklyn |
Brooklyn |
DEP |
Architecture |
Preliminary |
Approved |
2020-06-22 |
| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
Artwork |
Preliminary |
Approved with conditions |
2020-06-22 |