Projects (5,221)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Installation of rooftop HVAC equipment, Engine Company 207 and 84th Police Precinct, 301 Gold Street, Brooklyn Brooklyn DDC Building systems & Modifications Commented 2021-06-21
Reconstruction of a fueling station, 30th Police Precinct, 233 West 10th Street, Manhattan Manhattan DDC Building systems & Modifications Commented 2021-06-21
Installation of aeration tank mixer platforms and vents, Rockaway Wastewater Treatment Plant, Beach Channel Drive between Beach 104th Street and Beach 108th Street, Queens Queens DEP Architecture Commented 2021-06-21
Reconstruction of the Centre Street and Hogan Place entrances and construction of a trash compactor enclosure on Baxter Street, Manhattan Criminal Court, 100 Centre Street, Manhattan Manhattan DDC Architecture Commented 2021-06-21
Reconstruction of the Passerelle bridge and plaza and the rehabilitation of an operations building, Flushing Meadows Corona Park, Roosevelt Avenue and Meridian Road, Corona, Queens Queens DPR Bridge Preliminary Approved with conditions 2021-05-26
Installation of Urban Poet by Alexandre Arrechea, Atlantic Avenue median between Conduit Boulevard and Fountain Avenue, Brooklyn Brooklyn DCLA% Artwork Preliminary Approved with conditions 2021-05-26
Installation of a rooftop generator, Engine Company 42, 1781 Monroe Avenue, Bronx Bronx FDNY Building systems & Modifications Preliminary and Final Approved 2021-05-26
Construction of a floodwall and adjacent site work (South Shore Coastal Resiliency), Oakwood Beach Wastewater Resource Recovery Facility, Staten Island Staten Island DPR Landscape Architecture Final Approved 2021-05-26
Reconstruction of Woodside Memorial Plaza, Woodside Avenue and Roosevelt Avenue, Woodside, Queens Queens DPR Landscape Architecture Preliminary Approved 2021-05-26
Reconstruction of the Strong Street Playground, Washington’s Walk, Strong Street, Reservoir Avenue, and West 197th Street, Bronx Bronx DPR Landscape Architecture Preliminary Approved 2021-05-26
Reconstruction of the Billy Lake Courts and an adult fitness area, Owl’s Head Park, Colonial Road between Wakeman Place and 67th Street, Brooklyn Brooklyn DPR Landscape Architecture Preliminary Approved 2021-05-26
Reconstruction of Laurelton Playground, 136th Avenue, Brookville Boulevard, and 137th Avenue, Rosedale, Queens Queens DPR Landscape Architecture Preliminary Approved 2021-05-26
Reconstruction of Hoover Playground, Hoover-Manton Playgrounds, Manton Street, Main Street, and Queens Boulevard, Briarwood, Queens Queens DPR Landscape Architecture Preliminary Approved 2021-05-26
Reconstruction of Chester Playground, adjacent to P.S. 327, Bristol Street and Chester Street between Sutter Avenue and Pitkin Avenue, Brooklyn Brooklyn DPR Landscape Architecture Preliminary Approved 2021-05-26
Installation of sports lighting and a scoreboard, 130th Street and 25th Avenue, College Point Ballfields, College Point, Queens Queens DPR Landscape Architecture Preliminary Approved 2021-05-26
Installation of a synthetic turf and adjacent site work, Bennett Park, Fort Washington Avenue, West 183rd Street, Pinehurst Avenue, and West 185th Street, Manhattan Manhattan DPR Landscape Architecture Preliminary Approved 2021-05-26
Construction of an adult fitness area, Classic Playground, Van Cortlandt Park, Van Cortlandt Park South between Orloff Avenue and Gouverneur Avenues, Bronx Bronx DPR Landscape Architecture Preliminary Approved 2021-05-26
Reconstruction of a plaza (Canal Street Triangle) as part of the Gateways to Chinatown program, Walker Street, Baxter Street, and Canal Street, Manhattan Manhattan DOT Landscape Architecture Final Approved with conditions 2021-05-26
Removal of a portion of a distinctive sidewalk, 188th Street between Horace Harding Expressway and 64th Avenue, Fresh Meadows, Queens Queens DOT Distinctive sidewalk Preliminary and Final Approved with conditions 2021-05-26
Installation of rooftop photovoltaic panels, 1400 Williamsbridge Road, Bronx Bronx DOT Building systems & Modifications Preliminary and Final Approved 2021-05-26
Construction of a bike lane transition, Prospect Park, Parkside Avenue, east of Machate Circle, Brooklyn Brooklyn DOT Landscape Architecture Preliminary and Final Approved 2021-05-26
Installation of signage, P.S. 216 (Auturo Toscanini School), 350 Avenue X, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2021-05-26
Installation of signage, P.S. 212 (The Lady Deborah Moody), 87 Bay 49th Street, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2021-05-26
Installation of signage, P.S. 184 (The Shuang Wen School), 327 Cherry Street, Manhattan Manhattan DOE Signage Preliminary and Final Approved 2021-05-26
Installation of signage, P.S. 101 (The Verrazzano School), 8696 24th Avenue, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2021-05-26
Installation of signage, P.S. 100 (The Coney Island School), 2951 West 3rd Street, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2021-05-26
Installation of a sealcoat soccer field, Louis C. Moser Playground, 77th Street and 25th Avenue, Woodside, Queens Queens DPR Landscape Architecture Preliminary and Final Approved 2021-05-26
Installation of a sealcoat soccer field, P.S. 57, 140 Palma Drive, Staten Island Staten Island DOE Landscape Architecture Preliminary and Final Approved 2021-05-26
Installation of mechanical equipment and louvers, Pump and Power Building, Coney Island Wastewater Resource Recovery Facility, 2502-2510 Knapp Street, Brooklyn Brooklyn DEP Building systems & Modifications Preliminary and Final Approved 2021-05-26
Installation of manholes, Manhattan District 8 Garage, 4036 Ninth Avenue, Manhattan Manhattan DDC Building systems & Modifications Preliminary and Final Approved 2021-05-26
Installation of prototypical pipe bollards, Jerome Avenue, Gerard Avenue, and East 169th Street, Bronx Bronx DDC Street furniture Preliminary and Final Approved 2021-05-26
Rehabilitation of gutters, cornice, and downspouts, Saratoga Branch Library, 8 Thomas S. Boyland Street, Brooklyn Brooklyn DDC Building systems & Modifications Preliminary and Final Approved 2021-05-26
Construction of a temporary exhibit (Budgie Feeding Experience), Bronx Zoo, 2300 Southern Boulevard, Bronx Bronx DCLA Building systems & Modifications Preliminary and Final Approved 2021-05-26
Installation of a louver at the south facade, Building 212, Flushing Avenue between Chauncey Avenue and Fourth Street, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Building systems & Modifications Preliminary and Final Approved 2021-05-26
Reconstruction of the Borden Avenue Pump Station, including the construction of an aeration building addition, Dutch Kills and Newtown Creek, 28-45 Borden Avenue under the Long Island Expressway, Queens Queens DEP Architecture Commented 2021-05-24
Reconstruction of Garrison Playground, East 146th Street, Walton Avenue, and the Grand Concourse, Bronx Bronx DPR Landscape Architecture Commented 2021-05-24
Reconstruction of baseball fields 4 and 5 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn Brooklyn DPR Landscape Architecture Commented 2021-05-24
Construction of Engine Company 268/Ladder Company 137 and adjacent site work, 116-11 Beach Channel Drive, Rockaway Park, Queens Queens DDC Architecture Commented 2021-05-24
Restoration of the Tea House Pavilion and reconstruction of the surrounding landscape, Concert Grove adjacent to East Lake Drive, Prospect Park, Brooklyn Brooklyn DPR Architecture Commented 2021-05-24
Reconstruction of Jesse Owens Playground, adjacent to P.S. 26 and J.H.S. 57, Lafayette Avenue between Stuyvesant Avenue and Malcolm X Boulevard, Brooklyn Brooklyn DPR Landscape Architecture Commented 2021-05-24
Design of a signage system for East Side Coastal Resiliency (ESCR), East River Park and the East River between Montgomery Street and East 25th Street, Manhattan Manhattan DDC Signage Commented 2021-05-24
Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 11 Hoyt Street, Hoyt Street, Livingston Street, and Elm Street, Brooklyn Brooklyn DOT Distinctive sidewalk Final Commented 2021-05-24
Removal of a distinctive sidewalk, Clove Lakes Park, Clove Road at Park Drive and Clove Road at Cheshire Place, Staten Island Staten Island DOT Distinctive sidewalk Preliminary and Final Commented 2021-05-24
Installation of a storefront system and signage (Starbucks), 625 Atlantic Avenue, Brooklyn Brooklyn EDC Signage Preliminary and Final Commented 2021-05-24
Construction of the New Douglaston-Little Neck Library, 249-01 Northern Boulevard, Little Neck, Queens Queens DDC Architecture Commented 2021-05-24
Construction of an open space area for animal statues, Flushing Meadows-Corona Park, Corona, Queens Queens DPR Landscape Architecture Commented 2021-05-24
Reconstruction of Daniel M. O’Connell Playground, 196th Street, 113th Avenue, and 197th Street, St. Albans, Queens Queens DPR Landscape Architecture Commented 2021-05-24
Installation of temporary light poles with a wind turbine and photovoltaic panels as part of a pilot project, Wolfe’s Pond Beach, Wolfe’s Pond Park, Staten Island Staten Island DPR Building systems & Modifications Commented 2021-05-24
Rehabilitation of a comfort station and adjacent site work, Bill Brown Park, Avenue X, Bedford Avenue, Avenue Y and East 24th Street, Brooklyn Brooklyn DPR Architecture Commented 2021-05-24
Installation of rooftop mechanical equipment and windows, Engine Company 82, 1215 Intervale Avenue, Bronx Bronx FDNY Building systems & Modifications Commented 2021-05-24