| Construction of a plaza, Morrison Avenue between Westchester Avenue and Harrold Place, Bronx |
Bronx |
DDC |
Landscape architecture |
Final |
Commented |
2022-10-11 |
| Reconstruction of basketball courts, Nostrand Playground, adjacent to P.S. 269, Nostrand Avenue and Foster Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2022-10-11 |
| Installation of wayfinding signage, MetroTech Center (Brooklyn Commons), Myrtle Avenue Promenade and MetroTech Commons between Jay Street and Flatbush Avenue, Brooklyn |
Brooklyn |
EDC |
Signage |
Preliminary |
Approved |
2022-10-11 |
| Installation of a generator and rooftop mechanical equipment, reconstruction of parapets, and replacement of a roof, Engine Company 159/Satellite 5, 1592 Richmond Road, Staten Island |
Staten Island |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-10-11 |
| Installation of 35 medallions, Avenue of the Americas between 42nd Street and 59th Street, Manhattan |
Manhattan |
DOT |
Signage |
Preliminary |
Approved with conditions |
2022-10-11 |
| Construction of a bulkhead and addition (Foodirect), Hunts Point Distribution Center, Building B, 355 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
Final |
Approved |
2022-10-11 |
| Reconstruction of the esplanade Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary |
Commented |
2022-10-11 |
| Installation of rooftop mechanical equipment, Repairs and Transportation (R & T) Building, 48-34 35th Street, Long Island City, Queens |
Queens |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-10-11 |
| Reconstruction of Lemon Creek Playground, Johnston Terrace and Seguine Avenue, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2022-10-11 |
| Installation of interpretive signage, Arverne East Nature Preserve, Rockaway Beach between Beach 44th Street and Beach 56th Place, Arverne, Queens |
Queens |
DPR |
Signage |
Preliminary and Final |
Approved |
2022-10-11 |
| Resolution of the Public Design Commission to allow remote participation by Commissioners with an extraordinary circumstance |
|
PDC |
|
|
|
2022-10-11 |
| Resolution of Delegation to the Executive Director for the approval of minor modifications to projects after final approval and utility and mechanical installations |
|
PDC |
|
|
|
2022-10-11 |
| Construction of a fenced-in area and stairs, 19‐25 Greene Avenue, Ridgewood, Queens |
Queens |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-10-11 |
| Design of a wayfinding and environmental graphics system, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Signage |
Preliminary |
Commented |
2022-10-11 |
| Conservation of the Kimlau War Memorial (1962) by Poy G. Lee, Park Row and Chatham Square, Kimlau Square, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
Approved with conditions |
2022-10-11 |
| Reconstruction of a storefront, Citi Field, 120-01 Roosevelt Avenue, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
Building systems & Modifications |
Preliminary |
Approved |
2022-10-11 |
| Installation of rooftop mechanical equipment, Department of Sanitation Operations Assistance Unit, 52-35 58th Street, Woodside, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-10-11 |
| Installation of rooftop equipment, Headworks Building, Port Richmond Wastewater Resource Recovery Facility, 1801 Richmond Terrace, Staten Island |
Staten Island |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-10-11 |
| Reconstruction of Anibal Aviles Playground, West 108th Street between Amsterdam Avenue and Columbus Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-10-11 |
| Construction of an electrical building, relocation of West Lake Drive, and adjacent site work as part of the Kensico-Eastview Connection Project, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
Architecture |
Final |
Approved |
2022-10-11 |
| Installation of exhaust and vent piping, Bushwick Family Residence, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-10-11 |
| Reconstruction of a storefront and installation of a rooftop mechanical enclosure, 3rd Street Women's Shelter, Manhattan |
Manhattan |
DDC |
Architecture |
Preliminary |
Approved with conditions |
2022-10-11 |
| Installation of security booth and gate, Randall's Island Fire Training Academy, 9 Reilly Boulevard, Randall's Island, Manhattan |
Manhattan |
FDNY |
Street furniture |
Preliminary and Final |
Approved |
2022-10-11 |
| Installation of rooftop HVAC equipment (Suite 701), Building 303 (formerly Building 399), Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-10-11 |
| Installation of removable bollards as part of the Safe Routes to School program, 905 Winthrop Street, 5902 6th Avenue, 4305 7th Avenue, 104 Sutter Avenue, 1100 East New York Avenue, 111 Bristol Street, 370 Marcy Avenue, Brooklyn, and 216 Clawson Street, Staten Island |
Brooklyn/Staten Island |
DDC |
Street furniture |
Preliminary and Final |
Approved |
2022-10-11 |
| Installation of digester biogas piping, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-10-11 |
| Reconstruction of the Hamilton Fish Recreation Center auxiliary structures and adjacent site work, Pitt Street between Stanton Street and East Houston Street, Hamilton Fish Park, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-10-11 |
| Reconstruction of the Cumberland Street Gate and Clinton Avenue Gate, and adjacent site work, Flushing Avenue at Cumberland Street and Sixth Street, and at Clinton Avenue and Tenth Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary |
Approved with conditions |
2022-10-11 |
| Construction of an adult fitness area, Shoelace Park, Bronx Boulevard between East 211th Street and East 229th Street, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2022-10-11 |
| Reconstruction of Bridge Park 2, Jay Street, York Street, Bridge Street, and Prospect Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Commented |
2022-10-11 |
| Construction of an addition (Fancy Foods), Hunts Point Food Distribution Center, Building B, 355 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
Final |
Approved |
2022-10-11 |
| Rehabilitation of a comfort station, Grove Hill Playground, adjacent to P.S. 157, East 158th Street between Eagle Avenue and Cauldwell Avenue, Bronx |
Bronx |
DPR |
Architecture |
Final |
Commented |
2022-09-12 |
| Installation of security bollards, Phase III, Moynihan Station (formerly Farley Post Office), 421 Eighth Avenue, Ninth Avenue between West 31st Street and West 33rd Street, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-09-12 |
| Reconstruction of the coastline (East Side Coastal Resiliency) and East River Park, including the construction of three bridges, a comfort station, two recreation centers, and two gate houses, East River between Montgomery Street and East 25th Street, Manhattan |
Manhattan |
DDC |
Landscape architecture |
Final |
Commented |
2022-09-12 |
| Installation of Resonances by Christopher Myers, Brownsville Library, 61 Glenmore Avenue, Brooklyn |
Brooklyn |
DCLA% |
Artwork |
Preliminary |
Commented |
2022-09-12 |
| Installation of signage (New York Blood Center), 30 Flatbush Avenue, Brooklyn |
Brooklyn |
HPD |
Signage |
Preliminary and Final |
Commented |
2022-09-12 |
| Installation of a conduit support system, Final Settling Tanks, Red Hook Wastewater Resource Recovery Facility, West Street between East Way and Little Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-09-12 |
| Installation of rooftop mechanical units, 100th Police Precinct, 92-24 Rockaway Beach Boulevard, Rockaway Beach, Queens |
Queens |
NYPD |
Building systems & Modifications |
Final |
Approved |
2022-09-12 |
| Installation of rooftop HVAC equipment, skylights and doors, and adjacent site work, Headworks Building, Tallman Island Wastewater Resource Recovery Facility, 127th Street and Powell's Cove Boulevard, College Point, Queens |
Queens |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-09-12 |
| Installation of a modular comfort station and adjacent site work, Discovery Playground, Fort Washington Park, Henry Hudson Parkway near West 163rd Street, Manhattan |
Manhattan |
DPR |
Architecture |
|
Commented |
2022-09-12 |
| Construction of an operations facility, Rockaway Operational Headquarters, 3-75 Beach 75th Street, Arverne, Queens |
Queens |
DDC |
Architecture |
|
Commented |
2022-09-12 |
| Reconstruction of Pontiac Playground, adjacent to P.S. 5, East 150th Street between Jackson Avenue and Concord Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Commented |
2022-09-12 |
| Construction of flood protection measures and moveable planters as part of the South Battery Park City Resiliency master plan, 1st Place between Battery Place and the Battery Park City Esplanade, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-09-12 |
| Rehabilitation of the east facade, including the installation of signage, West Farms Branch Library, 2085 Honeywell Avenue, Bronx |
Bronx |
DDC |
Architecture |
|
Commented |
2022-09-12 |
| Installation of a permanent perimeter fence, Newtown Creek Wastewater Pollution Control Plant, Provost Street, Greenpoint Avenue, and Kingsland Avenue, Brooklyn |
Brooklyn |
DEP |
Landscape architecture |
|
Commented |
2022-09-12 |
| Installation of a fenced-in area with stairs and a wheelchair lift, 202 St. Nicholas Avenue, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-09-12 |
| Reconstruction of a park, Elizabeth H. Berger Plaza, Greenwich Street, Edgar Street, Trinity Place, and Morris Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
|
Commented |
2022-09-12 |
| Reconstruction of Gate Houses No. 2 and 3 and rehabilitation of Gate Houses No. 5 and 7, Jerome Park Reservoir, Sedgwick Avenue, Goulden Avenue and Reservoir Avenue, Bronx |
Bronx |
DEP |
Architecture |
|
Commented |
2022-09-12 |
| Reconstruction of the roof, Ozone Park Branch Library, 92-24 Rockaway Boulevard, Ozone Park, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-09-12 |
| Reconstruction of Lawrence Playground, College Point Boulevard, Botanical Garden Bridge, and the Van Wyck Expressway, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2022-09-12 |