| Reconstruction of Esdale Bridge over Ambergill Pond, west edge of the Ravine, Prospect Park, Brooklyn |
Brooklyn |
DPR |
Bridge |
Preliminary |
Approved |
2023-05-22 |
| Installation of an interpretive sign and adjacent site work, Memorial to the Victims of 9/11, Staten Island Promenade, Richmond County Bank Ballpark, North Shore, Staten Island |
Staten Island |
EDC |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Construction of an environmental learning center (Solar 2), 24-20 FDR Drive at Peter Cooper Road, Manhattan |
Manhattan |
EDC |
Architecture |
Final |
Approved |
2023-05-22 |
| Reconstruction of South Rochdale Playground, adjacent to P.S. 80, 134th Road and 173rd Street, Jamaica, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Reconstruction of Ruppert Park, East 90th Street, Second Avenue, and East 91st Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Installation of Costume by Ornaghi & Prestinari, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
DCLA% |
Artwork |
Conceptual |
Commented |
2023-05-22 |
| Installation of prefabricated public toilets (Portland Loo) as part of a pilot, Hoyt Playground, 29th Street between Dorothy Place and Hoyt Avenue North, Astoria, Queens |
Queens |
DPR |
Architecture |
Preliminary and Final |
Approved with conditions |
2023-05-22 |
| Installation of prefabricated public toilets (Portland Loo) as part of a pilot, Irving Square Park, Weirfield Street between Knickerbocker Avenue and Halsey Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary and Final |
Approved with conditions |
2023-05-22 |
| Reconstruction of Horseshoe Playground, Hall Place and Rogers Place, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Installation of prefabricated public toilets (Portland Loo) as part of a pilot, Thomas Jefferson Park, East 114th Street between FDR Drive and First Avenue, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary and Final |
Approved with conditions |
2023-05-22 |
| Installation of prefabricated public toilets (Portland Loo) as part of a pilot, Father Macris Park, Lamberts Lane and Fahy Avenue, Staten Island |
Staten Island |
DPR |
Architecture |
Preliminary and Final |
Approved with conditions |
2023-05-22 |
| Design of prototypical bus shelters for installation on narrow sidewalks citywide |
Citywide |
DOT |
Street furniture |
Preliminary |
Approved |
2023-05-22 |
| Reconstruction of Josephine Caminiti Playground (formerly Corona Playground), Corona Avenue, Alstyne Avenue, and 102nd Street, Corona, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Reconstruction of electrical vault buildings, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved with conditions |
2023-05-22 |
| Reconstruction of Dyckman Marina and adjacent site work, Fort Washington Park Greenway and Route 9A at Dyckman Street, Inwood Hill Park, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2023-05-22 |
| Construction of a retaining wall, 118-22 80th Road at Grenfell Street, Kew Gardens, Queens |
Queens |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2023-05-22 |
| Minor modification to the installation of commemorative plaques and a flagpole, 239th Street median at Hillside Avenue, Bellerose, Queens |
Queens |
DOT |
Signage |
Amended Final |
Approved |
2023-05-22 |
| Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 9 Dekalb Avenue, Flatbush Avenue, Dekalb Avenue, and Fleet Street, Brooklyn |
Brooklyn |
DOT |
Distinctive sidewalk |
Final |
Approved |
2023-05-22 |
| Reconstruction of a storefront and installation of a rooftop mechanical enclosure, 3rd Street Women's Shelter, Manhattan |
Manhattan |
DDC |
Architecture |
Final |
Approved |
2023-05-22 |
| Repair of five siphon chambers, the Bryn Mawr Connection Chamber and the Eastview Overflow Weir and adjacent site work, Lower Catskill Aqueduct, Town of Greenburgh, Village of Elmsford, and the City of Yonkers |
Upstate |
DEP |
Architecture |
Preliminary |
Approved |
2023-05-22 |
| Installation of standardized tank and fueling stations and related equipment citywide |
Citywide |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2023-05-22 |
| Minor modifications to the construction of an academic building, 28th Street between Seventh Avenue and Eighth Avenue, Fashion Institute of Technology, Manhattan |
Manhattan |
DOE |
Architecture |
Amended Final |
Approved |
2023-05-22 |
| Reconstruction of an NYPD warehouse, 109 23rd Street, Gowanus Canal between 22nd Street and 23rd Street, Brooklyn |
Brooklyn |
NYPD |
Architecture |
Preliminary |
Approved |
2023-05-22 |
| Installation of standardized rooftop photovoltaic flat-mounted panels citywide |
Citywide |
DCAS |
Building systems & Modifications |
Preliminary and Final |
Approved with conditions |
2023-05-22 |
| Reconstruction of the West Tremont Avenue Bridge over the Major Deegan Expressway, Cedar Avenue, and Roberto Clemente State Park, Bronx |
Bronx |
DOT |
Bridge |
Preliminary |
Approved |
2023-05-22 |
| Installation of fuel tank access hatches, 24th Police Precinct, 151 West 100th Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2023-05-22 |
| Installation of two ADA lifts, 515 Canal Street (481 and 487 Greenwich Street), Greenwich Street between Canal Street and Spring Street, Manhattan |
Manhattan |
DOT |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2023-05-22 |
| Installation of rooftop mechanical equipment, Main Building, Maintenance Building and Meter Building, Oakwood Beach Wastewater Resource Recovery Facility, 175 Mill Road, Staten Island |
Staten Island |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2023-05-22 |
| Minor modification to the construction of a café kiosk (German Doner Kebab), Columbus Park, Joralemon Street between Court Street and Brooklyn Bridge Boulevard, east of Brooklyn Borough Hall, Brooklyn |
Brooklyn |
DPR |
Street furniture |
Amended Final |
Approved per delegation |
2023-05-22 |
| Reconstruction of a staircase, Ewen Park, Johnson Avenue and 231st Street, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Installation of a manhole, vent pipes, and overfill signage, Engine Company 318, 2510 Neptune Avenue, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2023-05-22 |
| Installation of prototypical pipe bollards at the construction of a prototypical planted median, Grand Concourse Boulevard, Phase IV, from East 175th Street to East Fordham Road, Bronx |
Bronx |
DOT |
Landscape architecture |
Amended Final |
Approved |
2023-05-22 |
| Installation of a rooftop mechanical unit, Lighthouse Point, 5 Bay Street, Staten Island |
Staten Island |
EDC |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2023-05-22 |
| Reconstruction of pavilion structures and adjacent site work, World’s Fair Marina, Flushing Meadows Corona Park, Marina Road and Boat Basin Place, Corona, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2023-05-22 |
| Rehabilitation of the West 186th Street Basketball Court, West 186th Street between St. Nicholas Avenue and Audubon Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Commented |
2023-05-22 |
| Installation of rooftop mechanical equipment, Decontamination Specialization Unit, 104-32 43rd Avenue, Corona, Queens |
Queens |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2023-05-22 |
| Installation of a fuel tank access hatch, Engine Company 5, 340 East 14th Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2023-05-22 |
| Installation of an emergency generator, Engine Company 282, 4210 12th Avenue, Brooklyn |
Brooklyn |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2023-05-22 |
| Construction of the Mary Cali Dalton Recreation Center, 6 Victory Boulevard, adjacent to at the Lyons Pool, Hannah Street, Murray Hulbert Avenue, and the Tompkinsville Esplanade, Staten Island |
Staten Island |
DPR |
Architecture |
Preliminary |
Commented |
2023-05-22 |
| Installation of distinctive lighting, Steinway Street between 28th Avenue to 35th Avenue, Long Island City, Queens |
Queens |
DOT |
Distinctive lighting |
|
Commented |
2023-05-22 |
| Construction of a prototypical comfort station and maintenance building, Lincoln Terrace Park, East New York Avenue between Rochester Avenue and Buffalo Avenue, Brooklyn |
Brooklyn |
DPR |
Architecture |
|
Commented |
2023-05-22 |
| Construction of a prototypical comfort station, West Playground, Avenue Y, West Street, Avenue Z, and West 1st Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
|
Commented |
2023-05-22 |
| Reconstruction of the East River Esplanade, East 72nd Street to East 78th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Commented |
2023-05-22 |
| Installation of a concrete pad as part of the reconstruction of a parking lot and installation of a water tank, FDNY Fire Training Academy, Randall’s Island, Manhattan |
Manhattan |
FDNY |
Building systems & Modifications |
Amended Final |
Commented |
2023-05-22 |
| Reconstruction of Rivington Street Playground, Sara D. Roosevelt Park, Forsyth Street, extension of Rivington Street, and Chrystie Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved |
2023-05-22 |
| Installation of distinctive lighting, Myrtle Avenue between Wyckoff Avenue and Fresh Pond Avenue, Ridgewood, Queens |
Queens |
DOT |
Distinctive lighting |
|
Commented |
2023-05-22 |
| Rehabilitation of a comfort station and a utility building, Betsy Head Park, Dumont Avenue, Thomas S. Boyland Street, Livonia Avenue, and Strauss Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
Final |
Commented |
2023-05-22 |
| Minor modification to the rehabilitation of Engine Company 54/Ladder Company 4, 782 Eighth Avenue, Manhattan |
Manhattan |
FDNY |
Architecture |
Amended Final |
Approved per delegation |
2023-05-22 |
| Construction of bridges over West 203rd Street connecting two Con Edison buildings, 3775 Ninth Avenue and 3795 Ninth Avenue, Manhattan |
Manhattan |
DOT |
Bridge |
Preliminary |
Commented |
2023-04-24 |
| Reconstruction of the Upper Vale, including construction of the Northeast Pavilion, Prospect Park, Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2023-04-24 |