| Minor modifications to the streetscape as part of Phase I of the construction of a residential building, streetscape, and plazas, 126th Street and Roosevelt Avenue, Willets Point, Corona, Queens |
Queens |
EDC |
Landscape architecture |
Amended Final |
Approved |
2024-02-12 |
| Reconstruction of a storefront, as part of Phase II of the construction of CityPoint, 445 Albee Square West, Brooklyn |
Brooklyn |
EDC |
Architecture |
Preliminary |
Approved with conditions |
2024-02-12 |
| Installation of emergency generators, Hunts Point Food Distribution Center, 600 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2024-02-12 |
| Construction of Residential Building 3 for the construction of a residential building, streetscape, and plazas, as part Phase I of Willets Point, 38-02 126th Lane, Willets Point, Corona, Queens |
Queens |
EDC |
Architecture |
Final |
Approved |
2024-02-12 |
| Construction of a foundation, as part of the construction of an administrative building and adjacent site work, Harper Street Yard, 32-11 Harper Street, Corona, Queens |
Queens |
DDC |
Architecture |
|
Commented |
2024-02-12 |
| Minor modifications to the construction of Buildings 2A and 2B and a central plaza, as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx |
Bronx |
EDC |
Architecture |
Amended Final |
Approved |
2024-02-12 |
| Rehabilitation of a public restroom building and Columbus Park Pavilion, including installation of security gates and adjacent site work, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Architecture |
|
Withdrawn |
2024-02-12 |
| Reconstruction of East Springfield Playground, adjacent to P.S. 147, 115th Road, between 218th Street and 219th Street, Cambria Heights, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2024-02-12 |
| Reconstruction of St. Michael's Playground, adjacent to the Brooklyn-Queens Expressway between 30th Avenue and 31st Avenue, Astoria, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2024-02-12 |
| Reconstruction of electrical vault buildings, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
Architecture |
Final |
Approved |
2024-02-12 |
| Construction of a plaza and railing, Beach Channel Drive, Beach 108th Street, Jamaica Bay, and Rockaway Freeway, Far Rockaway, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Commented |
2024-02-12 |
| Reconstruction of four bridges over the Shore Belt Parkway at Sheepshead Bay Road, Ocean Avenue, Bedford Avenue, and Nostrand Avenue, Brooklyn |
Brooklyn |
DOT |
Bridge |
Preliminary |
Approved |
2024-02-12 |
| Reconstruction of the East 14th Street Pedestrian Bridge over the Belt Parkway, between Shore Parkway and Voorhies Avenue, Brooklyn |
Brooklyn |
DOT |
Bridge |
Final |
Approved |
2024-02-12 |
| Reconstruction of Umma Park, Woodruff Avenue and Ocean Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2024-02-12 |
| Reconstruction of Esdale Bridge over Ambergill Pond, west edge of the Ravine, Prospect Park, Brooklyn |
Brooklyn |
DPR |
Bridge |
Final |
Approved |
2024-02-12 |
| Rehabilitation of the esplanade, Harlem River Greenway, as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 135th Street and East 145th Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Final |
Approved |
2024-02-12 |
| Installation of a façade and renovation of Emergency Medical Service (EMS 58), 420 East 83rd Street, Brooklyn |
Brooklyn |
FDNY |
Architecture |
|
Commented |
2024-02-12 |
| Installation of signage, Cornell University/Cornell Tech campus, Roosevelt Island, Manhattan |
Manhattan |
EDC |
Signage |
|
Commented |
2024-02-12 |
| Reconstruction of Augustus Saint-Gaudens Playground, adjacent to P.S. 40, Second Avenue, between East 19th Street and East 20th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2024-02-12 |
| Installation of Wings of Everchange 易之翼 by Jennifer Wen Ma, 70 Mulberry Street, Manhattan |
Manhattan |
DCLA% |
Artwork |
Conceptual |
Approved with conditions |
2024-01-16 |
| Installation of The Feeling is Mutual by Justin Valdes, Arverne Community Library, 312 Beach 54th Street, Arverne, Queens |
Queens |
DCLA% |
Artwork |
Preliminary |
Approved with conditions |
2024-01-16 |
| Reconstruction of Dinosaur Playground, Riverside Park, west of Riverside Drive between West 96th Street and West 98th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2024-01-16 |
| Installation of electric vehicle charging stations, Pier 36 (Basketball City), 299 South Street, Manhattan |
Manhattan |
EDC |
Street furniture |
Preliminary |
Approved with conditions |
2024-01-16 |
| Reconstruction of Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2024-01-16 |
| Reconstruction of Boerum Park, adjacent to P.S. 373, west of Hoyt Street between Warren Street and Baltic Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2024-01-16 |
| Reconstruction of Frank D. O’Connor Playground, Woodside Avenue, 78th Street, and Broadway, Woodside, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2024-01-16 |
| Installation of fuel tanks and vent pipes, Brooklyn Repair Yard, 9023 Avenue D, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
|
Commented |
2024-01-16 |
| Installation of a fuel tank access hatch, Engine Company 247, 1336 60th Street, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-01-16 |
| Reconstruction of Annadale Green, Jefferson Boulevard and Annadale Road, North Railroad Street, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2024-01-16 |
| Installation of a fire alarm system, Dean Street Residence, 2155 Dean Street, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-01-16 |
| Relocation of the Annadale Memorial (1953) within the park perimeter, as part of the reconstruction of Annadale Green, Annadale Green, Jefferson Boulevard and Annadale Road, North Railroad Street, Staten Island |
Staten Island |
DPR |
Artwork |
Preliminary |
Approved |
2024-01-16 |
| Reconstruction of Baseball Field #7, Juniper Valley Park, Juniper Boulevard South near 74th Street, Middle Village, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2024-01-16 |
| Removal and temporary storage of Enlightenment and Arms of the City of New York (1940) by Rene Paul Chambellan, Manhattan Detention Complex, 125 White Street, White Street between Baxter Street and Centre Street, Manhattan |
Manhattan |
DCLA% |
Artwork |
Final |
Approved with conditions |
2024-01-16 |
| Installation of rooftop mechanical equipment, Building 12, FDNY Fire Training Academy, 15 Reilly Boulevard, Randall's Island, Manhattan |
Manhattan |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-01-16 |
| Minor modifications to the installation of commemorative markers (Harlem Heritage Markers), Hudson River, 125th Street to 162nd Street, and the Bronx River, Manhattan |
Manhattan |
DOT |
Signage |
Amended Final |
Approved |
2024-01-16 |
| Reconstruction of the 154th Street Pump Station, Powell’s Cove Boulevard between 154th Street and 154th Place, Whitestone, Queens |
Queens |
DEP |
Architecture |
Final |
Approved with conditions |
2024-01-16 |
| Installation of an interim sally port and bail payment center, Manhattan Detention Complex, 100 Centre Street, Manhattan |
Manhattan |
DDC |
Architecture |
Preliminary and Final |
Commented |
2024-01-16 |
| Design of prototypical short bus shelters for installation on narrow sidewalks citywide |
Citywide |
DOT |
Street furniture |
Preliminary |
Approved with conditions |
2024-01-16 |
| Design of a prototypical rooftop solar canopy for installation citywide |
Citywide |
DCAS |
Building systems & Modifications |
|
Commented |
2024-01-16 |
| Installation of security cameras, Bowery Bay Wastewater Resource Recovery Facility, 4301 Berrian Boulevard, Astoria, Queens |
Queens |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2024-01-16 |
| Minor modifications to the rehabilitation of a façade, Engine Company 46, 460 Cross Bronx Expressway, Bronx |
Bronx |
FDNY |
Building systems & Modifications |
Amended Final |
Approved per delegation |
2024-01-16 |
| Construction of North Park, Phase I, Fresh Kills Park, Richmond Hill Road, Arthur Kill Road and Victory Boulevard, Staten Island |
Staten Island |
DPR |
Landscape architecture |
|
Commented |
2024-01-16 |
| Installation of distinctive light poles, Jumel Terrace, West 160th Street, St. Nicholas Avenue, and West 162nd Street, Manhattan |
Manhattan |
DOT |
Distinctive lighting |
Preliminary and Final |
Approved |
2024-01-16 |
| Removal of Upright (1992) by Kit-Yin Snyder, Manhattan Detention Complex, White Street between Baxter Street and Centre Street, 125 White Street, Manhattan |
Manhattan |
DCLA% |
Artwork |
Final |
Approved |
2024-01-16 |
| Construction of a water quality monitoring station, Shaft 7, Sedgwick Avenue and West 167th Street, Bronx |
Bronx |
DEP |
Architecture |
Final |
Commented |
2024-01-16 |
| Construction of a water quality monitoring station, Croton Water Filtration Plant, 3701 Jerome Avenue, Bronx |
Bronx |
DEP |
Architecture |
Preliminary and Final |
Commented |
2024-01-16 |
| Construction of the North Tower and reconstruction of open spaces, East River Science Park (Alexandria Center for Life Science), 500 East 30th Street between First Avenue, the FDR Drive, East 28th Street, and East 30th Street, Manhattan |
Manhattan |
EDC |
Architecture |
|
Withdrawn |
2024-01-16 |
| Removal of Immigration on the Lower East Side of New York (1989) by Richard Haas, Manhattan Detention Complex, 125 White Street, Baxter Street façade, Manhattan |
Manhattan |
DCLA% |
Artwork |
Final |
Approved |
2024-01-16 |
| Minor modifications to the construction of Andrew Haswell Green Park, Phase IIB, including the reconstruction of the pavilion roof, East 60th Street to East 63rd Street between the FDR Drive and the East River, Manhattan |
Manhattan |
EDC |
Landscape Architecture |
Amended Final |
Approved per delegation |
2024-01-16 |
| Removal and temporary storage of The Seven Columns of the Temple of Wisdom and Solomon’s Throne (1992) by Kit-Yin Snyder, Manhattan Detention Complex, White Street between Baxter Street and Centre Street, Manhattan |
Manhattan |
DCLA% |
Artwork |
Final |
Approved with conditions |
2024-01-16 |