| Minor modifications to the installation of security bollards, Central UTA Satmar School for Boys, 762 Wythe Avenue, Rutledge Street and Penn Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Amended Final |
Approved |
2024-12-16 |
| Reconstruction of streetscape improvements, 345 Hudson Street, between King Street and Charlton Street, Manhattan |
Manhattan |
DOT |
Landscape Architecture |
Preliminary and Final |
Approved |
2024-12-16 |
| Construction of a plaza, adjacent to City-As-School High School, West Houston and Hudson Street, Manhattan |
Manhattan |
DEP |
Landscape Architecture |
Final |
Approved |
2024-12-16 |
| Reconstruction of a dog run, Herbert Von King Park, Marcy Avenue and Lafayette Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape Architecture |
Preliminary |
Approved |
2024-12-16 |
| Construction of an open space under the ramps to the Ed Koch Queensborough Bridge, Dutch Kills Street between Jackson Avenue and the Long Island Rail Road, Long Island City, Queens |
Queens |
DOT |
Landscape Architecture |
Preliminary |
Approved with conditions |
2024-12-16 |
| Construction of entry vestibules, Fashion Institute of Technology, David Dubinsky Student Center and Business and Liberal Arts Center, 340 Eighth Avenue, Manhattan |
Manhattan |
DOE |
Building systems & Modifications |
Preliminary and Final |
Approved |
2024-12-16 |
| Design of a charging dock and electrical cabinet, as part of the prototypical Citibike share station for installation citywide |
Citywide |
DOT |
Street furniture |
Preliminary |
Approved |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Steinway #1 Municipal Parking Field, 38-02 30th Avenue, Astoria, Queens |
Queens |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Steinway #2 Municipal Parking Field, Steinway Street between 31st Avenue and Broadway, Astoria, Queens |
Queens |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, White Plains Road Municipal Parking Field, 2071 White Plains Road, Bronx |
Bronx |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Sheepshead Bay #1 Municipal Parking Field, 2602 East 17th Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Construction of an interim pre-fabricated trailer, Horizon Juvenile Center, 560 Brooke Avenue, Bronx |
Bronx |
DDC |
Architecture |
Preliminary and Final |
Approved |
2024-12-16 |
| Installation of a fuel tank access hatch, Engine Company 6, 49 Beekman Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Rockaway Park Municipal Parking Field, 248 Beach 116th Street, Far Rockaway, Queens |
Queens |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Rehabilitation of the Merriman Dam Spillway, Rondout Reservoir, State Route 55 and Porter Road, Napanoch, Ulster County |
Upstate |
DEP |
Landscape Architecture |
Final |
Approved |
2024-12-16 |
| Renovation of Buildings A and C (Made in NY-North), Bush Terminal Industrial Campus, 13 42nd Street and One 43rd Street, Brooklyn |
Brooklyn |
EDC |
Architecture |
Final |
Commented |
2024-12-16 |
| Rehabilitation of a comfort station, Cooper Park, Maspeth Avenue, Morgan Avenue, Sharon Street and Olive Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary and Final |
Commented |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Ditmars #2 Municipal Parking Field, 22-70 33rd Street, Astoria, Queens |
Queens |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Installation of Love and Resistance in El Barrio by Miguel Luciano, Metropolitan Hospital, 1902 Second Avenue, First Avenue between 97th Street and 99th Street and Second Avenue between 97th Street and 99th Street, Manhattan |
Manhattan |
EDC |
Artwork |
Preliminary |
Commented |
2024-12-16 |
| Reconstruction of the Queens Detention Complex, 126-01 82nd Avenue, Kew Gardens, Queens |
Queens |
DDC |
Architecture |
|
Commented |
2024-12-16 |
| Repair of the spillway, Kirk Lake Dam, east of County Road 32 at Lakeside Road, Mahopac, Carmel, Putnam County |
Upstate |
DEP |
Landscape Architecture |
Preliminary and Final |
Approved |
2024-12-16 |
| Construction of the Soundview Park Recreation Center, Soundview Park, Lafayette Avenue between Morrison Avenue and Metcalf Avenue, Bronx |
Bronx |
DDC |
Architecture |
Preliminary |
Approved with conditions |
2024-12-16 |
| Reconstruction of a fueling station, NYPD Harbor George, 109-01 14th Avenue, College Point, Queens |
Queens |
NYPD |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-12-16 |
| Design of a master plan for Fifth Avenue ("Future of Fifth"), Fifth Avenue between East 40th Street and East 60th Street, Manhattan |
Manhattan |
DOT |
Landscape Architecture |
|
Commented |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Brighton Beach Municipal Parking Field, 3162 Brighton 4th Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Ferry Terminal South #1 Municipal Parking Field, 1 Bay Street, Staten Island |
Staten Island |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2024-12-16 |
| Construction of a plaza, adjacent to City-As-School High School, West Houston Street and Hudson Street, Manhattan |
Manhattan |
DEP |
Landscape Architecture |
Preliminary |
Commented |
2024-11-18 |
| Reconstruction of a fueling station, Van Cortlandt Yard, Van Cortlandt Park, Mosholu Avenue east of Broadway, Bronx |
Bronx |
DDC |
Building systems & Modifications |
|
Commented |
2024-11-18 |
| Construction of an annex building, Horizon Juvenile Center, 560 Brooke Avenue, Bronx |
Bronx |
DDC |
Architecture |
Preliminary |
Approved with conditions |
2024-11-18 |
| Reconstruction of the entrance stairs and adjacent site work, Morningside Park, 114th Street and Morningside Drive, 116th Street and Morningside Drive, and 122nd Street and Morningside Drive, Morningside Park, Manhattan |
Manhattan |
DPR |
Landscape Architecture |
Preliminary |
Approved |
2024-11-18 |
| Reconstruction of the Allen Street and Pike Street malls, Pike Street between Madison Street and Division Street, and Allen Street between Division Street and Hester Street, and construction of a plaza at Pike Street between East Broadway and Division Street, Manhattan |
Manhattan |
DPR |
Landscape Architecture |
Preliminary |
Approved with conditions |
2024-11-18 |
| Reconstruction of the Manhattan Detention Complex, 125 White Street, Manhattan |
Manhattan |
DDC |
Architecture |
|
Commented |
2024-11-18 |
| Reconstruction of a portion of the Sol Bloom Playground, adjacent to P.S. 084 (The Lillian Weber School of Arts), Columbus Avenue between West 91st Street and West 92nd Street, Manhattan |
Manhattan |
DPR |
Landscape Architecture |
Final |
Approved |
2024-11-18 |
| Reconstruction of a playground, Julio Carballo Fields, adjacent to Hunts Point Recreation Center, Manida Street between Lafayette Avenue and Spofford Avenue, Bronx |
Bronx |
DPR |
Landscape Architecture |
Final |
Approved with conditions |
2024-11-18 |
| Installation of two flagpoles, Swedish Cottage, West Drive and 79th Street Transverse, Central Park, Manhattan |
Manhattan |
DPR |
Landscape Architecture |
Preliminary and Final |
Approved |
2024-11-18 |
| Reconstruction of Frank D. O’Connor Playground, Woodside Avenue, 78th Street, and Broadway, Woodside, Queens |
Queens |
DPR |
Landscape Architecture |
Final |
Approved |
2024-11-18 |
| Construction of a dog run, Asser Levy Park, Sea Breeze Avenue between West Fifth Street and Surf Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape Architecture |
Final |
Approved |
2024-11-18 |
| Installation of a rooftop generator, Engine Company 241, 6630 3rd Avenue, Brooklyn |
Brooklyn |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-11-18 |
| Reconstruction of Summit Playground, Macombs Dam Park, Summit Avenue and West 161st Street, Bronx |
Bronx |
DPR |
Landscape Architecture |
Preliminary |
Approved with conditions |
2024-11-18 |
| Construction of the 40th Police Precinct and adjacent site work, East 149th Street and St. Ann's Avenue, Bronx |
Bronx |
DDC |
Architecture |
|
Commented |
2024-11-18 |
| Rehabilitation of a façade, Engine Company 46, 460 Cross Bronx Expressway, Bronx |
Bronx |
FDNY |
Architecture |
Final |
Commented |
2024-11-18 |
| Reconstruction of a playground, Poe Park, East 192nd Street between Grand Concourse and East Kingsbridge Road, Bronx |
Bronx |
DPR |
Landscape Architecture |
Preliminary |
Approved |
2024-11-18 |
| Reconstruction of a playground, Corporal Lawrence Thompson Park, Broadway and Markham Lane, Staten Island |
Staten Island |
DPR |
Landscape Architecture |
Preliminary and Final |
Approved |
2024-11-18 |
| Construction of a prototypical comfort station and adjacent site work, Canarsie Park between Seaview Avenue and the Shore Belt Parkway, Brooklyn |
Brooklyn |
DPR |
Architecture |
|
Commented |
2024-11-18 |
| Installation of an ADA lift and stairs, 1840 Anthony Avenue, Bronx |
Bronx |
DOT |
Building systems & Modifications |
Preliminary and Final |
Approved |
2024-11-18 |
| Reconstruction of the Brooklyn Detention Complex, 275 Atlantic Avenue, Brooklyn |
Brooklyn |
DDC |
Architecture |
Preliminary |
Commented |
2024-11-18 |
| Installation of rooftop mechanical equipment, 335 Adams Street, Brooklyn |
Brooklyn |
EDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-11-18 |
| Removal of distinctive sidewalk pavers at pedestrian ramps, Junction Boulevard between 34th Road and 40th Road, Jackson Heights, Queens |
Queens |
DOT |
Distinctive sidewalk |
Preliminary and Final |
Approved |
2024-11-18 |
| Installation of ADA door actuators, Brooklyn Supreme Court, 360 Adams Street, Brooklyn |
Brooklyn |
DCAS |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2024-11-18 |
| Installation of pre-engineered metal building addition, Anheuser-Busch warehouse/distribution facility and recycling center, Hunts Point Food Distribution Center, 500 Food Center Drive, Bronx |
Bronx |
EDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2024-11-18 |