| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Brighton Beach Municipal Parking Field, 3162 Brighton 4th Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Rockaway Park Municipal Parking Field, 248 Beach 116th Street, Far Rockaway, Queens |
Queens |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, College Point Municipal Parking Field, 121-26 14th Avenue, College Point, Queens |
Queens |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Reconstruction of a storage building for use as an administrative office and locker room facility, Queens Repair Yard, 177-11 109th Avenue, Jamaica, Queens |
Queens |
DEP |
Architecture |
Preliminary and Final |
|
2025-02-24 |
| Construction of a greenway and daylighting of Tibbetts Brook, between West 230th Street and Hester and Piero’s Mill Pond, Van Cortlandt Park, Bronx |
Bronx |
DEP/DPR |
Landscape architecture |
Final |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Flushing #4 Municipal Parking Field, below the Northern Boulevard bridge between College Point Boulevard and Prince Street, Flushing, Queens |
Queens |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Reconstruction of the plaza, including the removal of a distinctive sidewalk, 60 Centre Street, Thomas Paine Park, Manhattan |
Manhattan |
DDC |
Landscape Architecture |
Preliminary and Final |
Commented |
2025-02-24 |
| Construction of a high level outlet system and adjacent site work, Gilboa Dam, Schoharie Reservoir, adjacent to Route 990V, Schoharie County |
Upstate |
DEP |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Sheepshead Bay #1 Municipal Parking Field, 2602 East 17th Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Reconstruction of Bronx Skate Park, Bronx Park, Bronx Park East and Britton Street, Bronx |
Bronx |
EDC/DPR |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Installation of photovoltaic panels and electrical equipment, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DCAS/DEP |
Architecture |
Preliminary |
|
2025-02-24 |
| Long-term installation of Sooner or Later (2022) by Mark di Suvero, the Brooklyn Museum, 200 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA |
Artwork |
Final |
|
2025-02-24 |
| Construction of a natural stormwater management system, including the reconstruction of a stormwater detention wetland, stormwater channels and floodplains, stabilization of inlets and streams, and adjacent site work, Arden Heights Woods Bluebelt, Woodrow Road, between Shotwell Avenue and Grantwood Avenue, Legate Avenue and Halpin Avenue, Legate Avenue and Carlton Boulevard, and Arden Avenue and Halpin Avenue, Staten Island |
Staten Island |
DDC/DEP/DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Installation of I Am Protected by Jazmine Hayes, Brownsville Multiservice Center and Community Hub (previously Brownsville Youth Empowerment Center and Community Hub), 444 Thomas S. Boyland Street between East New York Avenue and Pitkin Avenue, Brooklyn |
Brooklyn |
DCLA%/DDC |
Artwork |
Preliminary |
|
2025-02-24 |
| Reconstruction of the Brooklyn Detention Complex, 275 Atlantic Avenue, Brooklyn |
Brooklyn |
DDC/DOC |
Architecture |
Amended Final |
|
2025-02-24 |
| Reconstruction of the perimeter retaining wall and an ADA ramp, McLaughlin Park, Tillary Street, Jay Street, Cathedral Place and Flatbush Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Reconstruction of a skate park, Brower Park, adjacent to P.S. 289, St. Marks Avenue, Brooklyn Avenue, and Kingston Avenue, Brooklyn |
Brooklyn |
DPR/EDC |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Reconstruction of a retaining wall including installation of guardrails, Kissena Park, south of the public restroom building, Oak Avenue and 164th Street, Flushing, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Rehabilitation of the garage and marina, Skyport Marina and Seaplane Terminal, 2430 FDR Drive Service Road at East 23rd Street and East River, Manhattan |
Manhattan |
EDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-02-24 |
| Construction of a dog run, Irving Square Park, Weirfield Street, Knickerbocker Avenue, Halsey Street, and Wilson Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Installation of interpretive signage, as part of the reconstruction of the Easter River Esplanade, 107th Street Pier, and Bobby Wagner Walk, East 94th Street to 107th Street, and East 117th Street to East 124th Street, Manhattan |
Manhattan |
EDC |
Signage |
Preliminary |
Commented |
2025-02-24 |
| Reconstruction of East River Playground, adjacent to P.S. 146, FDR Drive between 107th Drive and East 106th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Reconstruction of the Randall's Island Nature Center and adjacent site work, 1 Central Road, north of Hell Gate Circle, east of the Wards Island Wastewater Treatment Plant, Randall's Island, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary |
|
2025-02-24 |
| Rehabilitation of the Washington Heights Health Center, including reconstruction of the roof, 600 West 168th Street, Manhattan |
Manhattan |
DDC/DOHMH |
Architecture |
Preliminary and Final |
|
2025-02-24 |
| Reconstruction of a multipurpose play area and playground and construction of a dog run as Phase III of the reconstruction of Commodore Barry Park, Flushing Avenue, North Elliot Place, Park Avenue, and Navy Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
|
2025-02-24 |
| Stabilization of the shoreline, reconstruction of the street end and adjacent site work, Lipsett Avenue, Staten Island |
Staten Island |
EDC/DPR/DOT |
Landscape architecture |
Preliminary and Final |
|
2025-02-24 |
| Construction of a community center and adjacent site work, Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx |
Bronx |
DPR |
Architecture |
Preliminary |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, White Plains Road Municipal Parking Field, 2071 White Plains Road, Bronx |
Bronx |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Construction of a public restroom building, Gwen Ifill Park, 129th Avenue, 176th Street, and 133rd Avenue, Jamaica, Queens |
Queens |
DPR |
Architecture |
Preliminary |
|
2025-02-24 |
| Removal of distinctive sidewalk pavers at pedestrian ramps, Greenpoint Avenue between 44th Street and 47th Street, Sunnyside, Queens |
Queens |
DOT |
Distinctive sidewalk |
Preliminary and Final |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Steinway #1 Municipal Parking Field, 38-02 30th Avenue, Astoria, Queens |
Queens |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Installation of vents as part of the reconstruction of the coastline (East Side Coastal Resiliency) and East River Park, including the construction of three bridges, a comfort station, two recreation centers, and two gate houses, East River between Montgomery Street and East 25th Street, Manhattan |
Manhattan |
DDC/DPR/DOT |
Landscape architecture |
Amended Final |
|
2025-02-24 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Steinway #2 Municipal Parking Field, Steinway Street between 31st Avenue and Broadway, Astoria, Queens |
Queens |
DOT |
Street furniture |
Amended Final |
|
2025-02-24 |
| Installation of façade graphics for a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Architecture |
Preliminary |
|
2025-02-24 |
| Construction of a spray shower area, Lenape Playground, Conference House Park, Swinnerton Street and Billop Avenue, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
|
2025-02-24 |
| Replacement of rooftop mechanical units, 1700 Bathgate Avenue, Bronx |
Bronx |
EDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-01-31 |
| Minor modifications to the installation of a storefront and signage (Nike), 625 Atlantic Avenue, Brooklyn |
Brooklyn |
EDC |
Architecture |
Amended Final |
|
2025-01-31 |
| Reinstallation of a conduit support system as part of the DEP Wastewater Resiliency Program, Final Settling Tanks, Hunts Point Wastewater Resource Recovery Facility, 1270 Ryawa Avenue, Bronx |
Bronx |
DEP |
Building systems & Modifications |
Preliminary and Final |
|
2025-01-31 |
| Installation of transformers, Biological Nutrient Removal Building, and installation of rooftop equipment, Pump and Blower Building, 26th Ward Wastewater Resource Recovery Facility, 12266 Flatlands Avenue, Brooklyn |
Brooklyn |
DEP |
Building systems & Modifications |
Preliminary and Final |
|
2025-01-31 |
| Installation of Brooklyn Museum of Love and Wonder by Vanessa German, Shirley Chisholm Recreation Center, 3002 Foster Avenue between Nostrand Avenue and New York Avenue, Brooklyn |
Brooklyn |
DCLA% |
Artwork |
Preliminary |
Commented |
2025-01-21 |
| Construction of a waterfront park at Pier 6, Bush Terminal Industrial Campus (Made in NY), adjacent to Marginal Way between 41st Street and 43rd Street, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Final |
|
2025-01-21 |
| Construction of walkways as part of a waterfront park and streetscape improvements, Phase II and Phase III, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC/DPR |
Landscape architecture |
Preliminary |
|
2025-01-21 |
| Installation of Past, Present, Future by Glendalys Medina, Walter Gladwin Recreation Center, Walter Gladwin Park (formerly Crotona Park), East Tremont Avenue between 3rd Avenue and Arthur Avenue, Bronx |
Bronx |
DCLA%/DDC/DPR |
Artwork |
Conceptual |
|
2025-01-21 |
| Reconstruction of Hattie Carthan Playground, adjacent to P.S. 305, Madison Street, Marcy Avenue, and Monroe Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-01-21 |
| Reconstruction of a public restroom building and an amphitheater, Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx |
Bronx |
DPR |
Architecture |
Preliminary |
|
2025-01-21 |
| Construction of the Shore Park Connection as part of the Destination: Greenways! master plan, Shore Park and Parkway, Shore Parkway between Bay Ridge Avenue and 4th Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-01-21 |
| Reconstruction of Virginia Principe Playground, Frank Principe Park, Maurice Avenue, 54th Avenue, 63rd Street, and Borden Avenue, Maspeth, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-01-21 |
| Reconstruction of a playground, Frederick Cabell Park (Cambria Heights Playground), Francis Lewis Boulevard and 121st Avenue, Cambria Heights, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2025-01-21 |
| Reconstruction of Harding Park, Bolton Avenue and Gildersleeve Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
|
2025-01-21 |
| Reconstruction of a plaza as part of the Phase II of the reconstruction of the Red Hook Recreation Area, Bay Street, Clinton Street, and Henry Street Basin, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
|
2025-01-21 |