| Construction of a hospitality building (Player Performance Building), including a parking garage, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a recreation center (Shirley Chisholm Recreation Center) and adjacent site work, 3002 Foster Avenue between Nostrand Avenue and New York Avenue, Brooklyn |
Brooklyn |
DDC |
Amended Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a waterfront park at Pier 6, Bush Terminal Industrial Campus (Made in NY), adjacent to Marginal Way between 41st Street and 43rd Street, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of façade and entrance improvements, Arthur Ashe Stadium, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of Jamaica Station Plaza, Archer Avenue between 146th Street and 147th Place, Jamaica, Queens |
Queens |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Design of a prototypical automatic public toilet for installation citywide |
Citywide |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Design of prototypical pipe bollards for installation citywide |
Citywide |
DOT |
Amended Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of Al Qalam: Poets in the Park by Sara Ouhaddou, Elizabeth H. Berger Plaza, Greenwich Street, Edgar Street, Trinity Place, and Morris Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of an ADA ramp and stairs, Wakefield Library, 4100 Lowerre Place, Bronx |
Bronx |
DDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of security bollards, Young Israel of Hillcrest, 169-07 Jewel Avenue, Fresh Meadows, Queens |
Queens |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of the Andrew J. Barberi Ferry commemorative plaque and memorial bell, Ferry Terminal Viaduct south of the St. George Ferry Terminal, Staten Island |
Staten Island |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Long-term installation of Sooner or Later (2022) by Mark di Suvero, the Brooklyn Museum, 200 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Minor modifications to a retaining wall as part of the construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Amended Final |
|
Consent Items |
Agenda
Minutes
|
| Minor modifications to the construction of a sanitation garage, Districts 1 & 3, Freshkills Park, Muldoon Avenue and West Service Road, Staten Island |
Staten Island |
DDC |
Amended Final |
|
Consent Items |
Agenda
Minutes
|
| Minor modifications to the installation of an interim sallyport, bail payment center, and adjacent planted area, Queens Criminal Court, 125-01 Queens Boulevard at 82nd Avenue, Kew Gardens, Queens |
Queens |
DDC |
Amended Final |
|
Consent Items |
Agenda
Minutes
|
| Minor modifications to the installation of electric vehicle charging stations, Pier 36 (Basketball City), 299 South Street, Manhattan |
Manhattan |
EDC |
Amended Final |
|
Consent Items |
Agenda
Minutes
|
| Minor modifications to the landscape as part of the construction of Buildings 2A and 2B and a central plaza, as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx |
Bronx |
EDC |
Amended Final |
|
Consent Items |
Agenda
Minutes
|
| Modifications to the installation of Costume by Ornaghi & Prestinari, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
DCLA% |
Amended Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of a portion of a pier and floating dock, Hunts Point Riverside Park, Lafayette Avenue and the Bronx River, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Maurice A Fitzgerald Playground, 106th Street between 94th Avenue and Atlantic Avenue, Ozone Park, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of North Rochdale Playground, adjacent to P.S. 30, Baisley Boulevard and Bedell Street, Cambria Heights, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a roof and rehabilitation of the façade, Pelham Fritz Recreation Center, Marcus Garvey Park, 120th Street, Madison Avenue, 124th Street and Mount Morris Park West, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a step street, including the construction of ADA ramps, Henwood Place between Walton Avenue and Morris Avenue, Bronx |
Bronx |
DDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a storefront, as part of Phase II of the construction of CityPoint, 445 Albee Square West, Brooklyn |
Brooklyn |
EDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a tot lot, Mahoney Playground, Beechwood Avenue and Cleveland Street, Staten Island |
Staten Island |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Boerum Park, adjacent to P.S. 373, west of Hoyt Street between Warren Street and Baltic Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Dyckman Marina and adjacent site work, Fort Washington Park Greenway and Route 9A at Dyckman Street, Inwood Hill Park, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of East Springfield Playground, adjacent to P.S. 147, 115th Road, between 218th Street and 219th Street, Cambria Heights, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Gwen Ifill Park, 129th Avenue, 176th Street, and 133rd Avenue, Jamaica, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Midland Playground, adjacent to P.S. 38, Midland Avenue and Lincoln Avenue, between Mason Avenue and Oldfield Street, Staten Island |
Staten Island |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of St. Catherine’s Park, adjacent to Manhattan International High School, First Avenue between East 67th Street and East 68th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the shoreline, as Phase I of the restoration of the Lakeshore shoreline, Parkside Avenue, between Parade Place and Ocean Avenue, adjacent to East Drive, Prospect Park, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the West Tremont Avenue Bridge over the Major Deegan Expressway, Cedar Avenue, and Roberto Clemente State Park, Bronx |
Bronx |
DOT |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a façade and replacement of a roof, Pamoja House, 357 Marcus Garvey Boulevard, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of Ranaqua, Bronx Park, 1 Bronx River Parkway, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Briarwood Community Library, 85-12 Main Street, Briarwood, Queens |
Queens |
DDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the façade, Queens Museum, 52-01 Grand Central Parkway, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DDC |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Rehabilitation of Walt Whitman Library and adjacent site work, 93 Saint Edwards Street, Brooklyn |
Brooklyn |
BPL |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Rehabilitation of Washington Irving Branch Library and adjacent sitework, 360 Irving Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Removal of a distinctive sidewalk, Chase Bank, 75 East 161st Street, Bronx |
Bronx |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a façade and renovation of Emergency Medical Service (EMS 58), 420 East 83rd Street, Brooklyn |
Brooklyn |
FDNY |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a water recirculation system, including adjacent site work, south of Central Park North between Adam Clayton Powell Jr. Boulevard and Malcolm X Boulevard, between the Harlem Meer and Fifth Avenue near East 106th Street, and east of Central Park West between West 100th Street and the Pool, Central Park, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Reconstruction of the Northwest shoreline as Phase 1 of the reconstruction of the Harlem Meer shoreline, Central Park North between the East Drive and Fifth Avenue, Central Park, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of an addition, Rosedale Community Library, 144-20 243rd Street, Rosedale, Queens |
Queens |
DDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a dog run, Irving Square Park, Weirfield Street, Knickerbocker Avenue, Halsey Street, and Wilson Avenue, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a foundation as part of the construction of a hospitality building (Player Performance Building), including a parking garage, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a hospitality building (Player Performance Building), including a parking garage, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a hospitality building (Player Performance Building), including a parking garage, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an addition, Rosedale Community Library, 144-20 243rd Street, Rosedale, Queens |
Queens |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an addition, Rosedale Community Library, 144-20 243rd Street, Rosedale, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an annex building, Horizon Juvenile Center, 560 Brooke Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a parking lot and fuel station, as part of the 40th Police Precinct and adjacent site work, East 149th Street and St. Ann's Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a recreation center (Shirley Chisholm Recreation Center) and adjacent site work, 3002 Foster Avenue between Nostrand Avenue and New York Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a recreation center (Shirley Chisholm Recreation Center) and adjacent site work, 3002 Foster Avenue between Nostrand Avenue and New York Avenue, Brooklyn |
Brooklyn |
DDC |
Amended Final |
|
|
Agenda
Minutes
|
| Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a storehouse building, Manhattan Storehouse, Bronx Shore Road north of the RFK Bridge, Randall's Island, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a waterfront park at Pier 6, Bush Terminal Industrial Campus (Made in NY), adjacent to Marginal Way between 41st Street and 43rd Street, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a waterfront park at Pier 6, Bush Terminal Industrial Campus (Made in NY), adjacent to Marginal Way between 41st Street and 43rd Street, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a water recirculation system, including adjacent site work, south of Central Park North between Adam Clayton Powell Jr. Boulevard and Malcolm X Boulevard, between the Harlem Meer and Fifth Avenue near East 106th Street, and east of Central Park West between West 100th Street and the Pool, Central Park, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a water recirculation system, including adjacent site work, south of Central Park North between Adam Clayton Powell Jr. Boulevard and Malcolm X Boulevard, between the Harlem Meer and Fifth Avenue near East 106th Street, and east of Central Park West between West 100th Street and the Pool, Central Park, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of façade and entrance improvements, Arthur Ashe Stadium, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of façade and entrance improvements, Arthur Ashe Stadium, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of flood protection, North-West Battery Park City Resiliency master plan, Battery Place and 1st Place, South End Avenue and 3rd Place, West Thames Street, and West Street between Chambers Street and North Moore Street, Manhattan |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Construction of Jamaica Station Plaza, Archer Avenue between 146th Street and 147th Place, Jamaica, Queens |
Queens |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of Jamaica Station Plaza, Archer Avenue between 146th Street and 147th Place, Jamaica, Queens |
Queens |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of the Metropolitan Park (Queens Future) gaming facility, resort, retail and parking structures, and adjacent site work, 123-01 Roosevelt Avenue, between Shea Road and Seaver Way, adjacent to Willets Point, Corona, Queens |
Queens |
EDC |
|
Found Incomplete |
|
Agenda
Minutes
|
| Design of a prototypical automatic public toilet for installation citywide |
Citywide |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Design of a prototypical automatic public toilet for installation citywide |
Citywide |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Final |
|
|
Agenda
Minutes
|
| Design of prototypical pipe bollards for installation citywide |
Citywide |
DOT |
Amended Final |
|
|
Agenda
Minutes
|
| Design of prototypical pipe bollards for installation citywide |
Citywide |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Designs for a sidewalk treatment proposed for Junction Boulevard from 94th Street to Alstyne Avenue, Queens |
Queens |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of a façade and renovation of Emergency Medical Service (EMS 58), 420 East 83rd Street, Brooklyn |
Brooklyn |
FDNY |
Final |
|
|
Agenda
Minutes
|
| Installation of a façade and renovation of Emergency Medical Service (EMS 58), 420 East 83rd Street, Brooklyn |
Brooklyn |
FDNY |
|
Approved |
|
Agenda
Minutes
|
| Installation of Al Qalam: Poets in the Park by Sara Ouhaddou, Elizabeth H. Berger Plaza, Greenwich Street, Edgar Street, Trinity Place, and Morris Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of Al Qalam: Poets in the Park by Sara Ouhaddou, Elizabeth H. Berger Plaza, Greenwich Street, Edgar Street, Trinity Place, and Morris Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of an ADA ramp and stairs, Wakefield Library, 4100 Lowerre Place, Bronx |
Bronx |
DDC |
Final |
|
|
Agenda
Minutes
|
| Installation of an ADA ramp and stairs, Wakefield Library, 4100 Lowerre Place, Bronx |
Bronx |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Fort Washington Armory, 216 Fort Washington Avenue, Manhattan |
Manhattan |
DDC |
|
Approved per delegation |
|
Agenda
Minutes
|
| Installation of security bollards, Young Israel of Hillcrest, 169-07 Jewel Avenue, Fresh Meadows, Queens |
Queens |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Installation of security bollards, Young Israel of Hillcrest, 169-07 Jewel Avenue, Fresh Meadows, Queens |
Queens |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of signage as part of the construction of a maintenance building, as Phase II (Southern Phase) of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
|
Approved per delegation |
|
Agenda
Minutes
|
| Installation of signage (IYAHO Social Services), 1165 Rockaway Avenue, Brooklyn |
Brooklyn |
DCAS |
|
Approved per delegation |
|
Agenda
Minutes
|
| Installation of signage (Sephora), CityPoint, 1 Dekalb Avenue (445 Albee Square West), Albee Square West between Albee Square and Willoughby Street, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of the Andrew J. Barberi Ferry commemorative plaque and memorial bell, Ferry Terminal Viaduct south of the St. George Ferry Terminal, Staten Island |
Staten Island |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Installation of the Andrew J. Barberi Ferry commemorative plaque and memorial bell, Ferry Terminal Viaduct south of the St. George Ferry Terminal, Staten Island |
Staten Island |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of wayfinding signage, MetroTech Center (Brooklyn Commons), Myrtle Avenue Promenade and MetroTech Commons between Jay Street and Flatbush Avenue, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Long-term installation of Sooner or Later (2022) by Mark di Suvero, the Brooklyn Museum, 200 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA |
|
Approved with conditions |
|
Agenda
Minutes
|
| Long-term installation of Sooner or Later (2022) by Mark di Suvero, the Brooklyn Museum, 200 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA |
Preliminary |
|
|
Agenda
Minutes
|
| Minor modifications to a retaining wall as part of the construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to a retaining wall as part of the construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Minor modifications to the construction of a fenced-in area, 177 East 64th Street, Manhattan |
Manhattan |
DOT |
|
Approved per delegation |
|
Agenda
Minutes
|
| Minor modifications to the construction of a sanitation garage, Districts 1 & 3, Freshkills Park, Muldoon Avenue and West Service Road, Staten Island |
Staten Island |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Minor modifications to the construction of a sanitation garage, Districts 1 & 3, Freshkills Park, Muldoon Avenue and West Service Road, Staten Island |
Staten Island |
DDC |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the construction of Seaside Park & Community Arts Center, including an amphitheater, Riegelmann Boardwalk between West 21st Street and West 23rd Street, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Minor modifications to the installation of an interim sallyport, bail payment center, and adjacent planted area, Queens Criminal Court, 125-01 Queens Boulevard at 82nd Avenue, Kew Gardens, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Minor modifications to the installation of an interim sallyport, bail payment center, and adjacent planted area, Queens Criminal Court, 125-01 Queens Boulevard at 82nd Avenue, Kew Gardens, Queens |
Queens |
DDC |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the installation of electric vehicle charging stations, Pier 36 (Basketball City), 299 South Street, Manhattan |
Manhattan |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Minor modifications to the installation of electric vehicle charging stations, Pier 36 (Basketball City), 299 South Street, Manhattan |
Manhattan |
EDC |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the landscape as part of the construction of Buildings 2A and 2B and a central plaza, as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx |
Bronx |
EDC |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the landscape as part of the construction of Buildings 2A and 2B and a central plaza, as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx |
Bronx |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Minor modifications to the reconstruction of swales and construction of a stormwater detention system, Drewville Road adjacent to the Croton Falls Reservoir between Stoneleigh Avenue and Drew Lane, Town of Carmel, Putnam County |
Upstate |
DEP |
|
Approved per delegation |
|
Agenda
Minutes
|
| Minor modifications to the reconstruction of swales, Maple Avenue adjacent to the Cross River Reservoir, Town of Bedford, Westchester County |
Upstate |
DEP |
|
Approved per delegation |
|
Agenda
Minutes
|
| Modifications to the installation of Costume by Ornaghi & Prestinari, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
DCLA% |
|
Approved |
|
Agenda
Minutes
|
| Modifications to the installation of Costume by Ornaghi & Prestinari, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
DCLA% |
Amended Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of a pier and floating dock, Hunts Point Riverside Park, Lafayette Avenue and the Bronx River, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of a pier and floating dock, Hunts Point Riverside Park, Lafayette Avenue and the Bronx River, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Maurice A Fitzgerald Playground, 106th Street between 94th Avenue and Atlantic Avenue, Ozone Park, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Maurice A Fitzgerald Playground, 106th Street between 94th Avenue and Atlantic Avenue, Ozone Park, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of North Rochdale Playground, adjacent to P.S. 30, Baisley Boulevard and Bedell Street, Cambria Heights, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of North Rochdale Playground, adjacent to P.S. 30, Baisley Boulevard and Bedell Street, Cambria Heights, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a roof and rehabilitation of the façade, Pelham Fritz Recreation Center, Marcus Garvey Park, 120th Street, Madison Avenue, 124th Street and Mount Morris Park West, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a roof and rehabilitation of the façade, Pelham Fritz Recreation Center, Marcus Garvey Park, 120th Street, Madison Avenue, 124th Street and Mount Morris Park West, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a step street, including the construction of ADA ramps, Henwood Place between Walton Avenue and Morris Avenue, Bronx |
Bronx |
DDC |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a step street, including the construction of ADA ramps, Henwood Place between Walton Avenue and Morris Avenue, Bronx |
Bronx |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a storefront, as part of Phase II of the construction of CityPoint, 445 Albee Square West, Brooklyn |
Brooklyn |
EDC |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a storefront, as part of Phase II of the construction of CityPoint, 445 Albee Square West, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a tot lot, Mahoney Playground, Beechwood Avenue and Cleveland Street, Staten Island |
Staten Island |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a tot lot, Mahoney Playground, Beechwood Avenue and Cleveland Street, Staten Island |
Staten Island |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Boerum Park, adjacent to P.S. 373, west of Hoyt Street between Warren Street and Baltic Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Boerum Park, adjacent to P.S. 373, west of Hoyt Street between Warren Street and Baltic Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Dyckman Marina and adjacent site work, Fort Washington Park Greenway and Route 9A at Dyckman Street, Inwood Hill Park, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Dyckman Marina and adjacent site work, Fort Washington Park Greenway and Route 9A at Dyckman Street, Inwood Hill Park, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of East Springfield Playground, adjacent to P.S. 147, 115th Road, between 218th Street and 219th Street, Cambria Heights, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of East Springfield Playground, adjacent to P.S. 147, 115th Road, between 218th Street and 219th Street, Cambria Heights, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of fuel tank access hatches, Bronx Water Maintenance, 930 Zerega Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Gwen Ifill Park, 129th Avenue, 176th Street, and 133rd Avenue, Jamaica, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Gwen Ifill Park, 129th Avenue, 176th Street, and 133rd Avenue, Jamaica, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Midland Playground, adjacent to P.S. 38, Midland Avenue and Lincoln Avenue, between Mason Avenue and Oldfield Street, Staten Island |
Staten Island |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Midland Playground, adjacent to P.S. 38, Midland Avenue and Lincoln Avenue, between Mason Avenue and Oldfield Street, Staten Island |
Staten Island |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of St. Catherine’s Park, adjacent to Manhattan International High School, First Avenue between East 67th Street and East 68th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of St. Catherine’s Park, adjacent to Manhattan International High School, First Avenue between East 67th Street and East 68th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of swales and construction of a stormwater detention system, Drewville Road adjacent to the Croton Falls Reservoir between Stoneleigh Avenue and Drew Lane, Town of Carmel, Putnam County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of swales, Maple Avenue adjacent to the Cross River Reservoir, Town of Bedford, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the Harlem Meer shoreline, Central Park North between the East Drive and Fifth Avenue, Central Park, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the Northwest shoreline as Phase 1 of the reconstruction of the Harlem Meer shoreline, Central Park North between the East Drive and Fifth Avenue, Central Park, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the Northwest shoreline as Phase 1 of the reconstruction of the Harlem Meer shoreline, Central Park North between the East Drive and Fifth Avenue, Central Park, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of the shoreline, as Phase I of the restoration of the Lakeshore shoreline, Parkside Avenue, between Parade Place and Ocean Avenue, adjacent to East Drive, Prospect Park, Brooklyn |
Brooklyn |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of the shoreline, as Phase I of the restoration of the Lakeshore shoreline, Parkside Avenue, between Parade Place and Ocean Avenue, adjacent to East Drive, Prospect Park, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of the West Tremont Avenue Bridge over the Major Deegan Expressway, Cedar Avenue, and Roberto Clemente State Park, Bronx |
Bronx |
DOT |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the West Tremont Avenue Bridge over the Major Deegan Expressway, Cedar Avenue, and Roberto Clemente State Park, Bronx |
Bronx |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, Playground 174 (formerly Bronx River Houses Playground), East 174th Street between Ward Avenue and Manor Avenue, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a façade and replacement of a roof, Pamoja House, 357 Marcus Garvey Boulevard, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of a façade and replacement of a roof, Pamoja House, 357 Marcus Garvey Boulevard, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a parking garage (Pier 83 Circle Line), Pier 83, Hudson River Park, 12th Avenue between West 42nd Street and West 43rd Street, Manhattan |
Manhattan |
DPR |
|
Approved per delegation |
|
Agenda
Minutes
|
| Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Rehabilitation of Ranaqua, Bronx Park, 1 Bronx River Parkway, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of Ranaqua, Bronx Park, 1 Bronx River Parkway, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the Briarwood Community Library, 85-12 Main Street, Briarwood, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the Briarwood Community Library, 85-12 Main Street, Briarwood, Queens |
Queens |
DDC |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the façade, Queens Museum, 52-01 Grand Central Parkway, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the façade, Queens Museum, 52-01 Grand Central Parkway, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DDC |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of Walt Whitman Library and adjacent site work, 93 Saint Edwards Street, Brooklyn |
Brooklyn |
BPL |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of Walt Whitman Library and adjacent site work, 93 Saint Edwards Street, Brooklyn |
Brooklyn |
BPL |
|
Approved with conditions |
|
Agenda
Minutes
|
| Rehabilitation of Washington Irving Branch Library and adjacent sitework, 360 Irving Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of Washington Irving Branch Library and adjacent sitework, 360 Irving Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Reinstallation of four artworks by Clemente Spampinato, Walt Whitman Library, 93 Saint Edwards Street, Brooklyn |
Brooklyn |
BPL |
|
Commented |
|
Agenda
Minutes
|
| Removal of a distinctive sidewalk, Chase Bank, 75 East 161st Street, Bronx |
Bronx |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Removal of a distinctive sidewalk, Chase Bank, 75 East 161st Street, Bronx |
Bronx |
DOT |
|
Approved |
|
Agenda
Minutes
|