| Construction of two soundstage buildings, a parking structure and lot, rehabilitation of two industrial buildings, and adjacent site work (Steiner Studios Sequel), Made in NY-South Campus, Bush Terminal, between 43rd Street, 1st Avenue, and 51st Street, Brooklyn |
Brooklyn |
EDC |
Final |
|
Committee Meeting |
Agenda
Minutes
|
| Construction of ADA paths and adjacent site work, Delacorte Theater, Central Park, Central Park West and West 81st Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of an ADA path and adjacent site work, Great Hill, Central Park, Central Park West between West 103rd Street and West 107th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an off-shore wind operations and maintenance building and adjacent sitework, South Brooklyn Marine Terminal, 2nd Avenue between 32nd Street and 34th Street, Brooklyn |
Brooklyn |
EDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an operational building, New York Botanical Garden, 2900 Southern Boulevard, Bronx River Parkway between Waring Avenue and Thwaites Place, Bronx |
Bronx |
DCLA |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Minor modifications to the construction of a field house and adjacent site work (Sportime), One Randall's Island, Manhattan |
Manhattan |
DPR |
Amended Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Minor modifications to the installation of security bollards, Walt Disney Project Galaxy, 310 Hudson Street, Vandam Street, Varick Street, and Spring Street, Manhattan |
Manhattan |
DOT |
Amended Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of a portion of Equity Playground, adjacent to P.S. 60, 88th Avenue, 90th Street, and 89th Avenue, Woodhaven, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of Lily Brown Playground, Fort Washington Park, east of Riverside Drive, between West 162nd Street and West 163rd Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of Penn South Playground, West 26th Street, Eighth Avenue, West 25th Street, and Ninth Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of Playground 278, adjacent to P.S. 278, Marine Park, Stuart Street, Fillmore Avenue, and Madison Place, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Rehabilitation of the esplanade, Harlem River Greenway, as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 135th Street and East 145th Street, Manhattan |
Manhattan |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Pulitzer Fountain and conservation of Pomona by Karl Bitter (1916), Central Park, Grand Army Plaza, West 59th Street, Fifth Avenue, and West 59th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of façade and site lighting, Schomburg Center for Research in Black Culture, 515 Malcolm X Boulevard between West 135th Street and West 136th Street, Manhattan |
Manhattan |
NYPD |
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of the Walter Gladwin Recreation Center, Walter Gladwin Park (formerly Crotona Park), East Tremont Avenue between 3rd Avenue and Arthur Avenue, Bronx |
Bronx |
DDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Reconstruction of a portion of a park, Bush Terminal Piers, west of 1st Avenue between 43rd Street and 51st Street, Brooklyn |
Brooklyn |
EDC |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Conservation and reinstallation of Grand Finale of an Opera (1938) and Circus (1938) by Max Spivak, Astoria Library, 14-01 Astoria Boulevard, Astoria, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a café kiosk (German Doner Kebab), Columbus Park, Joralemon Street between Court Street and Brooklyn Bridge Boulevard, east of Brooklyn Borough Hall, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a concrete facility (SRM Concrete, formerly US Concrete and Ferrara Brothers) 738 3rd Avenue, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of ADA paths and adjacent site work, Delacorte Theater, Central Park, Central Park West and West 81st Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of ADA paths and adjacent site work, Delacorte Theater, Central Park, Central Park West and West 81st Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a life sciences building, Innovation East Life Sciences, 455 First Avenue, First Avenue between East 26th and East 27th Streets, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an ADA path and adjacent site work, Great Hill, Central Park, Central Park West between West 103rd Street and West 107th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of an ADA path and adjacent site work, Great Hill, Central Park, Central Park West between West 103rd Street and West 107th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of an addition, Old Stone House, Washington Park, 336 3rd Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of an addition to the Return and Waste Sludge Building and rehabilitation of the Final Settling Tanks, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of an entrance plaza, Seaside Park & Community Arts Center, Riegelmann Boardwalk between West 21st Street and West 23rd Street, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an off-shore wind operations and maintenance building and adjacent sitework, South Brooklyn Marine Terminal, 2nd Avenue between 32nd Street and 34th Street, Brooklyn |
Brooklyn |
EDC |
Final |
|
|
Agenda
Minutes
|
| Construction of an off-shore wind operations and maintenance building and adjacent sitework, South Brooklyn Marine Terminal, 2nd Avenue between 32nd Street and 34th Street, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an operational building, New York Botanical Garden, 2900 Southern Boulevard, Bronx River Parkway between Waring Avenue and Thwaites Place, Bronx |
Bronx |
DCLA |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of an operational building, New York Botanical Garden, 2900 Southern Boulevard, Bronx River Parkway between Waring Avenue and Thwaites Place, Bronx |
Bronx |
DCLA |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, as Phase II of the reconstruction of Highbridge Park, Edgecombe Avenue, West 163rd to West 168th Street, and West 175th Street to West 176th Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of Gateway Park (Gateway Estates), Phase II, Vandalia Avenue, Ashford Street, Schroeders Avenue, and Walker Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of Seaside Park & Community Arts Center, including an amphitheater, Riegelmann Boardwalk between West 21st Street and West 23rd Street, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of the QueensWay Metropolitan Hub, including construction of a pedestrian bridge over the LIRR, Metropolitan Avenue, Metropolitan Expeditionary Learning School Driveway, Union Turnpike, and Trotting Course Lane, Forest Hills, Queens |
Queens |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of the Walter Gladwin Recreation Center, Walter Gladwin Park (formerly Crotona Park), East Tremont Avenue between 3rd Avenue and Arthur Avenue, Bronx |
Bronx |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of the Walter Gladwin Recreation Center, Walter Gladwin Park (formerly Crotona Park), East Tremont Avenue between 3rd Avenue and Arthur Avenue, Bronx |
Bronx |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of three subway entrance head house structures, Burnside Avenue Station at Jerome Avenue and East Burnside Avenue, Bronx, Norwood Avenue Station at Fulton Street and Norwood Avenue, Brooklyn, and Neptune Avenue Station at West 6th Street and Neptune Avenue, Brooklyn |
Bronx/Brooklyn |
NYCT |
|
Commented |
|
Agenda
Minutes
|
| Construction of two soundstage buildings, a parking structure and lot, rehabilitation of two industrial buildings, and adjacent site work (Steiner Studios Sequel), Made in NY-South Campus, Bush Terminal, between 43rd Street, 1st Avenue, and 51st Street, Brooklyn |
Brooklyn |
EDC |
Final |
|
|
Agenda
Minutes
|
| Construction of two soundstage buildings, a parking structure and lot, rehabilitation of two industrial buildings, and adjacent site work (Steiner Studios Sequel), Made in NY-South Campus, Bush Terminal, between 43rd Street, 1st Avenue, and 51st Street, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Design of a mixed-use development, including a stadium, as part of Phase II of Willets Point, 126th Street and 127th Street between Northern Boulevard, Willets Point Boulevard and Roosevelt Avenue, Corona, Queens |
Queens |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of façade and site lighting, Schomburg Center for Research in Black Culture, 515 Malcolm X Boulevard between West 135th Street and West 136th Street, Manhattan |
Manhattan |
NYPD |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of façade and site lighting, Schomburg Center for Research in Black Culture, 515 Malcolm X Boulevard between West 135th Street and West 136th Street, Manhattan |
Manhattan |
NYPD |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Newtown Creek Wastewater Resource Recovery Facility, Provost Street, Greenpoint Avenue, and Kingsland Avenue, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Installation of interpretive signage as part of the reconstruction of the shoreline (Tottenville Shoreline Protection Plan), between Conference House Park and Butler Manor Woods, Tottenville, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of ventilation equipment, Machine Shop, Pump and Powerhouse Building, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
|
Approved per delegation |
|
Agenda
Minutes
|
| Loan of the Theodore Roosevelt Monument (1940) by James Earle Fraser to the Theodore Roosevelt Presidential Library, Medora, North Dakota |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Minor modifications to the construction of a bulkhead and addition (Foodirect), Hunts Point Distribution Center, Building B, 355 Food Center Drive, Bronx |
Bronx |
EDC |
|
Withdrawn |
|
Agenda
Minutes
|
| Minor modifications to the construction of a field house and adjacent site work (Sportime), One Randall's Island, Manhattan |
Manhattan |
DPR |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the construction of a field house and adjacent site work (Sportime), One Randall's Island, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Minor modifications to the installation of a shade structure and adult fitness equipment, Harmony Playground, Prospect Park West between 9th Street and 11th Street, Prospect Park, Brooklyn |
Brooklyn |
DPR |
|
Approved per delegation |
|
Agenda
Minutes
|
| Minor modifications to the installation of security bollards, Walt Disney Project Galaxy, 310 Hudson Street, Vandam Street, Varick Street, and Spring Street, Manhattan |
Manhattan |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Minor modifications to the installation of security bollards, Walt Disney Project Galaxy, 310 Hudson Street, Vandam Street, Varick Street, and Spring Street, Manhattan |
Manhattan |
DOT |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the reconstruction of the Arthur Ross Nursery Headhouse, Van Cortlandt Park, Van Cortlandt Park East, Major Deegan Expressway and East 242nd Street, Bronx |
Bronx |
DPR |
|
Approved per delegation |
|
Agenda
Minutes
|
| Minor modification to the construction of a comfort station and garage, Starlight Park, East 174th Street, the Sheridan Expressway and the Bronx River, Bronx |
Bronx |
DDC |
|
Approved per delegation |
|
Agenda
Minutes
|
| Minor modification to the construction of an entry vestibule, Astoria Branch Library, 14-01 Astoria Boulevard, Astoria, Queens |
Queens |
DDC |
|
Approved per delegation |
|
Agenda
Minutes
|
| Minor modification to the installation of retail signage (JD Sports) and storefront paneling, 159-02 Jamaica Avenue, Jamaica, Queens |
Queens |
EDC |
|
Approved per delegation |
|
Agenda
Minutes
|
| Reconstruction of a fueling station, Brooklyn Botanical Garden, 1008 Washington Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a portion of a park, Bush Terminal Piers, west of 1st Avenue between 43rd Street and 51st Street, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of a portion of a park, Bush Terminal Piers, west of 1st Avenue between 43rd Street and 51st Street, Brooklyn |
Brooklyn |
EDC |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Equity Playground, adjacent to P.S. 60, 88th Avenue, 90th Street, and 89th Avenue, Woodhaven, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Equity Playground, adjacent to P.S. 60, 88th Avenue, 90th Street, and 89th Avenue, Woodhaven, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Lawrence Virgilio Playground, 39th Drive, 39th Road, and Woodside Avenue, Woodside, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a portion of Naples Playground, adjacent to P.S. 9, Naples Street between Targee Street and Stanwich Street, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Boerum Park, adjacent to P.S. 373, west of Hoyt Street between Warren Street and Baltic Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of D'Emic Playground, adjacent to Sunset Park High School, 3rd Avenue between 34th Street and 35th Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of four bridges over the Shore Belt Parkway at Sheepshead Bay Road, Ocean Avenue, Bedford Avenue, and Nostrand Avenue, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Lily Brown Playground, Fort Washington Park, east of Riverside Drive, between West 162nd Street and West 163rd Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Lily Brown Playground, Fort Washington Park, east of Riverside Drive, between West 162nd Street and West 163rd Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of New Lots Branch Library and library plaza, adjacent to Sankofa Park, 655 New Lots Avenue, Brooklyn |
Brooklyn |
BPL |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Penn South Playground, West 26th Street, Eighth Avenue, West 25th Street, and Ninth Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Penn South Playground, West 26th Street, Eighth Avenue, West 25th Street, and Ninth Avenue, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of Playground 278, adjacent to P.S. 278, Marine Park, Stuart Street, Fillmore Avenue, and Madison Place, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Playground 278, adjacent to P.S. 278, Marine Park, Stuart Street, Fillmore Avenue, and Madison Place, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of St. Michael's Playground, adjacent to the Brooklyn-Queens Expressway between 30th Avenue and 31st Avenue, Astoria, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the East Flatbush Library, 9612 Church Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the playground and dog run, Maria Hernandez Park (formerly Bushwick Park), Knickerbocker Avenue, Irving Avenue, Starr Street, and Suydam Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the Upper Vale, including construction of the Northeast Pavilion, Prospect Park, Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the esplanade, Harlem River Greenway, as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 135th Street and East 145th Street, Manhattan |
Manhattan |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Rehabilitation of the esplanade, Harlem River Greenway, as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 135th Street and East 145th Street, Manhattan |
Manhattan |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of the Pulitzer Fountain and conservation of Pomona by Karl Bitter (1916), Central Park, Grand Army Plaza, West 59th Street, Fifth Avenue, and West 59th Street, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Rehabilitation of the Pulitzer Fountain and conservation of Pomona by Karl Bitter (1916), Central Park, Grand Army Plaza, West 59th Street, Fifth Avenue, and West 59th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|