| Conservation of Lafayette and Washington (1890) by Frederic-Auguste Bartholdi, Lafayette Square, Morningside Avenue, West 114th Street, and Manhattan Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a café kiosk (German Doner Kebab), Columbus Park, Joralemon Street between Court Street and Brooklyn Bridge Boulevard, east of Brooklyn Borough Hall, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a fenced-in area and stairs, 224 West 22nd Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of an ADA ramp, 5502 5th Avenue, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of an air intake totem, Penn Station, 392 Seventh Avenue and 4 Penn Plaza at West 33rd Street between Seventh Avenue and Eighth Avenue, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a parking garage and community facility as part of the Borough-Based Jails Program, Union Turnpike between 126th Street and 132nd Street, Kew Gardens, Queens |
Queens |
DDC |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of a parking lot and adjacent site work, Cary Leeds Tennis Center, Crotona Avenue between Claremont Parkway and Crotona Park North, Crotona Park, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a portion of the Jamaica Bay Greenway (Paerdegat Avenue North Connector), Flatlands Avenue from Ralph Avenue to East 76th Street, Paerdegat Avenue North from Flatlands Avenue to Paerdegat 2nd Street, Paerdegat Avenue North from Paerdegat 14th Street to Seaview Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of a restaurant, parking lot, and adjacent site work, 2 Soundview Avenue, Clason Point Park, Bronx River Avenue, East River, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of dunes, ramps, and accessible pathways, Rockaway Beach between Beach 9th Street and Beach 149th Street, Rockaway Park, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of The Breakneck Bridge over the Metro-North Railroad, Hudson Highlands Fjord Trail, Breakneck Point adjacent to Route 9D, Dutchess County |
Upstate |
DEP |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of two soundstage buildings, a parking structure and lot, and rehabilitation of two industrial buildings (Steiner Studios Sequel) and adjacent site work, Made in NY-South Campus, Bush Terminal, between 43rd Street, 1st Avenue, and 51st Street, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a flagpole, benches, and adjacent site work (9/11 Memorial Grove) Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a marker (NYC Marathon), 67th Street east of West Drive, Central Park, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of an emergency generator hook-up system, Communications Center, Tallman Island Wastewater Resource Recovery Facility, 127-01 Powell's Cove Boulevard, Queens |
Queens |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of gas-line conduit, 472 2nd Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of handrails, Morningside Park, near Morningside Drive and West 113th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of louvers (Suite 601), Building 303 (formerly Building 399), Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of Questions Worth Having Answers To by Kameelah Janan Rasheed, Abolitionist Place (formerly Willoughby Square Park), Willoughby Street, Abolitionist Place (Duffield Street) and Gold Street, Brooklyn |
Brooklyn |
DCLA% |
Conceptual |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of roll-up doors, Brooklyn Districts 1 & 4 Garage, 161 Varick Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of rooftop photovoltaic panels, 201-15 115th Avenue, Roy Wilkins School, Jamaica, Queens |
Queens |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of signage (Shake Shack), High Line Park, 820 Washington Street at Gansevoort Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of sports lighting, Curtis High School, 105 Hamilton Avenue, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of a guardrail, 3960 Broadway, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Detective Keith L. Williams Park (formerly Liberty Park), Liberty Avenue, 173rd Street, and 172nd Street, Jamaica, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Berths 10 and 11 and the Small Boat Basin, between Dry Dock 6 and Pier G, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of Captain Dermody Triangle, 216th Street and 48th Avenue, Oakland Gardens, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of steps and a handrail, Coignet Building, 360 3rd Avenue, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of streetscape, including green infrastructure swales and tree pits, Edgemere Avenue (Shore Front Parkway) between Beach 32nd and Beach 38th, Arverne East, Far Rockaway, Queens |
Queens |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East between Oneida Avenue and Kepler Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Arverne East Nature Preserve, Rockaway Beach between Beach 44th Street and Beach 56th Place, Arverne, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Hammonds Cove Marina, 140 Reynolds Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of Water Offering by William Lamson, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DCLA% |
Conceptual |
|
Public Hearing |
Agenda
Minutes
|
| Reconstruction of the esplanade Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Manhattan |
EDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a boathouse, and adjacent site work, Sherman Creek Park, 3725 Tenth Avenue, Harlem River Drive, Academy Street, and Sherman Creek, Manhattan |
Manhattan |
DPR |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Installation of The Fore by Katrín Sigurdardóttir, Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DCLA% |
Conceptual |
|
Public Hearing |
Agenda
Minutes
|
| Installation of Reflections by Oasa DuVerney, Eastern Parkway Library, 1044 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA% |
Conceptual |
|
Public Hearing |
Agenda
Minutes
|
| Construction of an education building, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Construction of Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Installation of Emanativ by Eto Otitigbe, Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Queens |
EDC |
Conceptual |
|
Public Hearing |
Agenda
Minutes
|
| Conservation of Lafayette and Washington (1890) by Frederic-Auguste Bartholdi, Lafayette Square, Morningside Avenue, West 114th Street, and Manhattan Avenue, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Conservation of Lafayette and Washington (1890) by Frederic-Auguste Bartholdi, Lafayette Square, Morningside Avenue, West 114th Street, and Manhattan Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a boathouse, 79th Street Boat Basin, Riverside Park and the Hudson River between 80th Street and 73rd Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a boathouse, and adjacent site work, Sherman Creek Park, 3725 Tenth Avenue, Harlem River Drive, Academy Street, and Sherman Creek, Manhattan |
Manhattan |
DPR |
|
Tabled |
|
Agenda
Minutes
|
| Construction of a boathouse, and adjacent site work, Sherman Creek Park, 3725 Tenth Avenue, Harlem River Drive, Academy Street, and Sherman Creek, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a café kiosk (German Doner Kebab), Columbus Park, Joralemon Street between Court Street and Brooklyn Bridge Boulevard, east of Brooklyn Borough Hall, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a café kiosk (German Doner Kebab), Columbus Park, Joralemon Street between Court Street and Brooklyn Bridge Boulevard, east of Brooklyn Borough Hall, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a connection chamber as part of the Kensico-Eastview Connection Project, Catskill-Delaware Ultraviolet Treatment Facility, 10 Walker Road, Town of Mount Pleasant, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 9 DeKalb Avenue, Flatbush Avenue, DeKalb Avenue, and Fleet Street, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Construction of a dog run, Riverside Park, Riverside Drive at West 142nd Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a fenced-in area and stairs, 224 West 22nd Street, Manhattan |
Manhattan |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Construction of a fenced-in area and stairs, 224 West 22nd Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a golf clubhouse (Drive Shack) and adjacent site work, Randall's Island Park, Bronx Shore Road between Randall's Island Greenway and Robert F. Kennedy Bridge, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a mixed-use development, Beach 21st Street, Mott Avenue, and Beach 22nd Street, Far Rockaway, Queens |
Queens |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an ADA ramp, 5502 5th Avenue, Brooklyn |
Brooklyn |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Construction of an ADA ramp, 5502 5th Avenue, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of an air intake totem, Penn Station, 392 Seventh Avenue and 4 Penn Plaza at West 33rd Street between Seventh Avenue and Eighth Avenue, Manhattan |
Manhattan |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Construction of an air intake totem, Penn Station, 392 Seventh Avenue and 4 Penn Plaza at West 33rd Street between Seventh Avenue and Eighth Avenue, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of an education building, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an education building, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an interim parking lot and installation of a trailer, 17 Bristol Street, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an office building, boat lift dock, and adjacent site work, World’s Fair Marina, Flushing Bay Promenade and Marina Road, Flushing Meadows Corona Park, Corona Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a parking garage and community facility as part of the Borough-Based Jails Program, Union Turnpike between 126th Street and 132nd Street, Kew Gardens, Queens |
Queens |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a parking garage and community facility as part of the Borough-Based Jails Program, Union Turnpike between 126th Street and 132nd Street, Kew Gardens, Queens |
Queens |
DDC |
Final |
|
|
Agenda
Minutes
|
| Construction of a parking lot and adjacent site work, Cary Leeds Tennis Center, Crotona Avenue between Claremont Parkway and Crotona Park North, Crotona Park, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a parking lot and adjacent site work, Cary Leeds Tennis Center, Crotona Avenue between Claremont Parkway and Crotona Park North, Crotona Park, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a playground and reconstruction of athletic courts, Pulaski Park, Bruckner Boulevard and the Willis Avenue Bridge, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a portion of the Jamaica Bay Greenway (Paerdegat Avenue North Connector), Flatlands Avenue from Ralph Avenue to East 76th Street, Paerdegat Avenue North from Flatlands Avenue to Paerdegat 2nd Street, Paerdegat Avenue North from Paerdegat 14th Street to Seaview Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a portion of the Jamaica Bay Greenway (Paerdegat Avenue North Connector), Flatlands Avenue from Ralph Avenue to East 76th Street, Paerdegat Avenue North from Flatlands Avenue to Paerdegat 2nd Street, Paerdegat Avenue North from Paerdegat 14th Street to Seaview Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a restaurant, parking lot, and adjacent site work, 2 Soundview Avenue, Clason Point Park, Bronx River Avenue, East River, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a restaurant, parking lot, and adjacent site work, 2 Soundview Avenue, Clason Point Park, Bronx River Avenue, East River, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of dunes, ramps, and accessible pathways, Rockaway Beach between Beach 9th Street and Beach 149th Street, Rockaway Park, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of dunes, ramps, and accessible pathways, Rockaway Beach between Beach 9th Street and Beach 149th Street, Rockaway Park, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of flood protection measures as part of the South Battery Park City Resiliency Master Plan, 1st Place between Battery Place and the Hudson River, Pier A Plaza, and The Battery, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of Lower Concourse Park, East 144th Street, East 146th Street and the Harlem River, Bronx |
Bronx |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of streetscape improvements, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of The Breakneck Bridge over the Metro-North Railroad, Hudson Highlands Fjord Trail, Breakneck Point adjacent to Route 9D, Dutchess County |
Upstate |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Construction of The Breakneck Bridge over the Metro-North Railroad, Hudson Highlands Fjord Trail, Breakneck Point adjacent to Route 9D, Dutchess County |
Upstate |
DEP |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of two soundstage buildings, a parking structure and lot, and rehabilitation of two industrial buildings (Steiner Studios Sequel) and adjacent site work, Made in NY-South Campus, Bush Terminal, between 43rd Street, 1st Avenue, and 51st Street, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of two soundstage buildings, a parking structure and lot, and rehabilitation of two industrial buildings (Steiner Studios Sequel) and adjacent site work, Made in NY-South Campus, Bush Terminal, between 43rd Street, 1st Avenue, and 51st Street, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Design of a prototypical streetscape toolkit as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Design of prototypical public communications structures (Link5G) for installation citywide |
Citywide |
DoITT |
|
Commented |
|
Agenda
Minutes
|
| Design of the Downtown Brooklyn and Fulton Mall streetscape master plan (Public Realm Action Plan), Willoughby Street, Adams Street, Boerum Place, Schermerhorn Street, Flatbush Avenue, Atlantic Avenue at the Barclays Center, and University Place, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Design of yard-wide entrances, including reconstruction of gates and adjacent site work, Clymer Street at Kent Street, Flushing Avenue at Clinton Avenue, Flushing Avenue at Cumblerland Street, and Navy Street at Sands Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a flagpole, benches, and adjacent site work (9/11 Memorial Grove) Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a flagpole, benches, and adjacent site work (9/11 Memorial Grove) Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a manhole, overfill alarm, and related tank equipment, Flushing Meadows Garage, 8 Olmstead Drive, Corona, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a marker (NYC Marathon), 67th Street east of West Drive, Central Park, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a marker (NYC Marathon), 67th Street east of West Drive, Central Park, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of an ADA ramp at the comfort station, Sara D. Roosevelt Park, Stanton Street between Chrystie Street and Forsyth Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of an emergency generator hook-up system, Communications Center, Tallman Island Wastewater Resource Recovery Facility, 127-01 Powell's Cove Boulevard, Queens |
Queens |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of an emergency generator hook-up system, Communications Center, Tallman Island Wastewater Resource Recovery Facility, 127-01 Powell's Cove Boulevard, Queens |
Queens |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of an interim guardbooth, sallyport, walkway and swing space, Queens House of Detention, 125-01 Queens Boulevard, Kew Gardens, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of an interim sallyport, Manhattan Detention Complex, 125 White Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a plaque commemorating Spanish casualties of the American Revolution, Fort Greene Park, Myrtle Avenue, Washington Park, Dekalb Avenue and Saint Edward Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of a rooftop condenser unit, 625 Atlantic Avenue, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a rooftop mechanical unit, Alexandria Launch Labs, Columbia University, 3960 Broadway, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of commemorative markers (Harlem Heritage Markers), Hudson River, 125th Street to 162nd Street, and the Bronx River, Manhattan |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of Emanativ by Eto Otitigbe, Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Queens |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of Emanativ by Eto Otitigbe, Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Queens |
EDC |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of gas-line conduit, 472 2nd Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of gas-line conduit, 472 2nd Avenue, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of handrails, Morningside Park, near Morningside Drive and West 113th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of handrails, Morningside Park, near Morningside Drive and West 113th Street, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of louvers (Suite 601), Building 303 (formerly Building 399), Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of louvers (Suite 601), Building 303 (formerly Building 399), Sands Street between Navy Street, Third Street, and Chauncey Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of manholes, FDNY Fire Communications, 1129 East 180th Street, Bronx Park, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of Möbiusky by Eduardo Coimbra, Bronx Animal Care Center, 2050 Bartow Avenue at Co-Op City Boulevard, Bronx |
Bronx |
DCLA% |
|
Commented |
|
Agenda
Minutes
|
| Installation of prototypical pipe bollards, Jerome Avenue, River Avenue, and East 168th Street, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of prototypical pipe bollards, Livonia Avenue between Rockaway Avenue and Watkins Street, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of Questions Worth Having Answers To by Kameelah Janan Rasheed, Abolitionist Place (formerly Willoughby Square Park), Willoughby Street, Abolitionist Place (Duffield Street) and Gold Street, Brooklyn |
Brooklyn |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of Questions Worth Having Answers To by Kameelah Janan Rasheed, Abolitionist Place (formerly Willoughby Square Park), Willoughby Street, Abolitionist Place (Duffield Street) and Gold Street, Brooklyn |
Brooklyn |
DCLA% |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of Reflections by Oasa DuVerney, Eastern Parkway Library, 1044 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA% |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of Reflections by Oasa DuVerney, Eastern Parkway Library, 1044 Eastern Parkway, Brooklyn |
Brooklyn |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of roll-up doors, Brooklyn Districts 1 & 4 Garage, 161 Varick Avenue, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of roll-up doors, Brooklyn Districts 1 & 4 Garage, 161 Varick Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of rooftop photovoltaic panels, 201-15 115th Avenue, Roy Wilkins School, Jamaica, Queens |
Queens |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of rooftop photovoltaic panels, 201-15 115th Avenue, Roy Wilkins School, Jamaica, Queens |
Queens |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop photovoltaic panels and mechanical equipment, Staten Island District 3 Garage, 1000 West Service Road, Staten Island |
Staten Island |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of signage (Shake Shack), High Line Park, 820 Washington Street at Gansevoort Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of signage (Shake Shack), High Line Park, 820 Washington Street at Gansevoort Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of sports lighting, Curtis High School, 105 Hamilton Avenue, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of sports lighting, Curtis High School, 105 Hamilton Avenue, Staten Island |
Staten Island |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of The Feeling is Mutual by Justin Valdes, Arverne Community Library, 312 Beach 54th Street, Arverne, Queens |
Queens |
DCLA% |
|
Commented |
|
Agenda
Minutes
|
| Installation of The Fore by Katrín Sigurdardóttir, Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of The Fore by Katrín Sigurdardóttir, Rego Park Library, 91-41 63rd Drive, Rego Park, Queens |
Queens |
DCLA% |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of Water Offering by William Lamson, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of Water Offering by William Lamson, Queens Botanical Garden, 43-50 Main Street, Elder Avenue between 134th Street and 136th Street, Flushing, Queens |
Queens |
DCLA% |
Conceptual |
|
|
Agenda
Minutes
|
| Minor modifications to the installation of The Phoenix Ladder by Shellyne Rodriguez, Grand Concourse Boulevard, Grand Concourse Service Road, Morris Avenue, and Henwood Place, Bronx |
Bronx |
DCLA% |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction and expansion of Zion Triangle, Legion Street, East New York Avenue and Pitkin Avenue, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a fueling station, 47th Police Precinct, 4111 Laconia Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a guardrail, 3960 Broadway, Manhattan |
Manhattan |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a guardrail, 3960 Broadway, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a mall as part of the Park Avenue Malls master plan (Reimagining Park Avenue), Phase I, Park Avenue between East 47th Street and East 48th Street, Manhattan |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an asphalt plant, including construction of an interim administration building, and adjacent site work, Harper Street Yard, 32-11 Harper Street, Corona, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a portion of Detective Keith L. Williams Park (formerly Liberty Park), Liberty Avenue, 173rd Street, and 172nd Street, Jamaica, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Detective Keith L. Williams Park (formerly Liberty Park), Liberty Avenue, 173rd Street, and 172nd Street, Jamaica, Queens |
Queens |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of a retaining wall and adjacent site work, Jerome Avenue and Parkview Terrace between East 196th Street and Morris Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Berths 10 and 11 and the Small Boat Basin, between Dry Dock 6 and Pier G, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of Berths 10 and 11 and the Small Boat Basin, between Dry Dock 6 and Pier G, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Black Rock Playground, adjacent to P.S. 119, Blackrock Avenue, Virginia Avenue, Watson Avenue, and Pugsley Avenue, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Captain Dermody Triangle, 216th Street and 48th Avenue, Oakland Gardens, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Captain Dermody Triangle, 216th Street and 48th Avenue, Oakland Gardens, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of fuel tank access hatches, 104th Police Precinct, 64-02 Catalpa Avenue, Ridgewood, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Grand Avenue Playground, Grand Avenue and West 181st Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Luis Lopez Playground and adjacent site work, Targee Street, Palma Drive, and Oder Avenue, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Stapleton Playground, adjacent to P.S./I.S. 78, Tompkins Avenue between Broad Street and Hill Street, Stapleton, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of steps and a handrail, Coignet Building, 360 3rd Avenue, Brooklyn |
Brooklyn |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of steps and a handrail, Coignet Building, 360 3rd Avenue, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of streetscape, including green infrastructure swales and tree pits, Edgemere Avenue (Shore Front Parkway) between Beach 32nd and Beach 38th, Arverne East, Far Rockaway, Queens |
Queens |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of streetscape, including green infrastructure swales and tree pits, Edgemere Avenue (Shore Front Parkway) between Beach 32nd and Beach 38th, Arverne East, Far Rockaway, Queens |
Queens |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of the esplanade Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Manhattan |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of the esplanade Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Manhattan |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of the Passerelle bridge and plaza, Flushing Meadows Corona Park, Roosevelt Avenue and Meridian Road, Corona, Queens |
Queens |
DPR |
|
Found Incomplete |
|
Agenda
Minutes
|
| Reconstruction of Walton Playground, East 181st Street and Walton Avenue, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East between Oneida Avenue and Kepler Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East between Oneida Avenue and Kepler Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the Arverne East Nature Preserve, Rockaway Beach between Beach 44th Street and Beach 56th Place, Arverne, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the Arverne East Nature Preserve, Rockaway Beach between Beach 44th Street and Beach 56th Place, Arverne, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the Hammonds Cove Marina, 140 Reynolds Avenue, Bronx |
Bronx |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Rehabilitation of the Hammonds Cove Marina, 140 Reynolds Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of the Upper Effluent Chamber as part of the Kensico-Eastview Connection Project, Kensico Reservoir, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Renovation of and addition to the Stapleton Branch Library, 132 Canal Street, Staten Island |
Staten Island |
DDC |
|
Commented |
|
Agenda
Minutes
|