| Conservation and expansion of 7000 Eichen (7000 Oaks) by Joseph Beuys, 11th Avenue, West 22nd Street and 10th Avenue, Manhattan. |
Manhattan |
DOT |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a dog run, Shore Road Park, Shore Parkway, Fourth Avenue, and Shore Road, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an ADA-ramp and stair and adjacent site work, Benjamin Ward Visitor Center and Samuel L. Perry Center, Rikers Island, Bronx |
Bronx |
DOC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an animal care center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DDC |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of a skate park, Jerome Playground South, Jerome Avenue, Cross Bronx Expressway, and Townsend Avenue, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a storage and maintenance building, Madison Square Park, Madison Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a Waterfowl Management Program Building, Kensico Reservoir, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Construction of basketball courts, Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island |
Staten Island |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Design of an interpretive sign, Newtown Creek Wastewater Resource Recovery Facility, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of interim steel bracing, Queens District 1 Garage, 34-28 21st Street, Astoria, Queens |
Queens |
DSNY |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of lighting at anaerobic digester tanks, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of a playground, James A. Bland Playground, 40th Road and Prince Street, Flushing, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Gorman Playground, 84th Street, 25th Avenue, 85th Street, and 30th Avenue, East Elmhurst, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Kelly Park Playground, East 14th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Rainbow Playground, Sixth Avenue, between 55th Street and 56th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a barge, gangway, storage shed, and adjacent site work to accommodate citywide ferry service, including a parking lot and pathway, Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
EDC |
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of flood protection measures (Brooklyn Bridge Montgomery Coastal Resiliency) and reconstruction of the East River Waterfront, Phases III, IV, and V, Brooklyn Bridge, South Street, Montgomery Street, and the East River, Manhattan |
Manhattan |
EDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 11 Hoyt Street, Hoyt Street, Livingston Street, and Elm Street, Brooklyn |
Brooklyn |
DOT |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Conservation and expansion of 7000 Eichen (7000 Oaks) by Joseph Beuys, 11th Avenue, West 22nd Street and 10th Avenue, Manhattan. |
Manhattan |
DOT |
Preliminary |
|
|
Agenda
Minutes
|
| Conservation and expansion of 7000 Eichen (7000 Oaks) by Joseph Beuys, 11th Avenue, West 22nd Street and 10th Avenue, Manhattan. |
Manhattan |
DOT |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a comfort station and garage as a part of Phase II of the reconstruction of Calvert Vaux Park (formerly Dreier Offerman Park), Shore Belt Parkway between Bay 44th Street and Bay 49th Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 11 Hoyt Street, Hoyt Street, Livingston Street, and Elm Street, Brooklyn |
Brooklyn |
DOT |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk as part of the Downtown Brooklyn and Fulton Mall streetscape master plan, 11 Hoyt Street, Hoyt Street, Livingston Street, and Elm Street, Brooklyn |
Brooklyn |
DOT |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a dog run, Shore Road Park, Shore Parkway, Fourth Avenue, and Shore Road, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a dog run, Shore Road Park, Shore Parkway, Fourth Avenue, and Shore Road, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of an ADA-ramp and stair and adjacent site work, Benjamin Ward Visitor Center and Samuel L. Perry Center, Rikers Island, Bronx |
Bronx |
DOC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an ADA-ramp and stair and adjacent site work, Benjamin Ward Visitor Center and Samuel L. Perry Center, Rikers Island, Bronx |
Bronx |
DOC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of an animal care center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DDC |
Final |
|
|
Agenda
Minutes
|
| Construction of an animal care center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of an open space, Tenth Avenue between West 48th Street and West 49th Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a prefabricated locker building, Visit House, and dormitory; installation of building systems mechanical equipment; and adjacent site work, North Infirmary Command, 15-00 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a public health laboratory, Harlem Hospital Center, Lenox Avenue, West 137th Street, Fifth Avenue, and West 136th Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a screen chamber, downtake shaft vent building, electrical building and police booth and reconstruction of the landscape as part of the Kensico-Eastview Connection Project, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a skate park, Jerome Playground South, Jerome Avenue, Cross Bronx Expressway, and Townsend Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a skate park, Jerome Playground South, Jerome Avenue, Cross Bronx Expressway, and Townsend Avenue, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a storage and maintenance building, Madison Square Park, Madison Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a storage and maintenance building, Madison Square Park, Madison Avenue at East 23rd Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a Waterfowl Management Program Building, Kensico Reservoir, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
Final |
|
|
Agenda
Minutes
|
| Construction of a Waterfowl Management Program Building, Kensico Reservoir, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Construction of basketball courts, Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island |
Staten Island |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of basketball courts, Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island |
Staten Island |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of Buildings 2A and 2B and a central plaza as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx |
Bronx |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of flood protection measures (Brooklyn Bridge Montgomery Coastal Resiliency) and reconstruction of the East River Waterfront, Phases III, IV, and V, Brooklyn Bridge, South Street, Montgomery Street, and the East River, Manhattan |
Manhattan |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of flood protection measures (Brooklyn Bridge Montgomery Coastal Resiliency) and reconstruction of the East River Waterfront, Phases III, IV, and V, Brooklyn Bridge, South Street, Montgomery Street, and the East River, Manhattan |
Manhattan |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of streetscape improvements, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Design of an interpretive sign, Newtown Creek Wastewater Resource Recovery Facility, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Design of an interpretive sign, Newtown Creek Wastewater Resource Recovery Facility, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
|
Approved with conditions |
|
Agenda
Minutes
|
| Design of the Downtown Brooklyn and Fulton Mall streetscape master plan (Public Realm Action Plan), Willoughby Street, Adams Street, Boerum Place, Schermerhorn Street, Flatbush Avenue, Atlantic Avenue at the Barclays Center, and University Place, Brooklyn |
Brooklyn |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Design of yard-wide entrances, including reconstruction of gates and adjacent site work, Clymer Street at Kent Street, Flushing Avenue at Clinton Avenue, Flushing Avenue at Cumblerland Street, and Navy Street at Sands Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a barge, gangway, storage shed, and adjacent site work to accommodate citywide ferry service, including a parking lot and pathway, Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a barge, gangway, storage shed, and adjacent site work to accommodate citywide ferry service, including a parking lot and pathway, Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of an emergency generator, EMS Station 35, 166 N 7th St, Brooklyn |
Brooklyn |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Installation of an emergency generator, Engine Company 151, 7219 Amboy Road, Staten Island |
Staten Island |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Installation of an emergency generator, Engine Company 275, 111-36 Merrick Boulevard, Jamaica, Queens |
Queens |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 2 Cooper Square, northwest corner of East 4th Street and Cooper Square, Manhattan |
Manhattan |
DCA |
|
Commented |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 787 7th Avenue, southeast corner of West 52nd Street and 7th Avenue, Manhattan |
Manhattan |
DCA |
|
Commented |
|
Agenda
Minutes
|
| Installation of Colorful Companions by Olalekan Jeyifous, Brooklyn Animal Care Center, 832 Shepherd Avenue, Brooklyn |
Brooklyn |
DCLA% |
|
Commented |
|
Agenda
Minutes
|
| Installation of exhaust equipment, Engine Company 162, 256 Nelson Avenue, Staten Island |
Staten Island |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Installation of interim steel bracing, Queens District 1 Garage, 34-28 21st Street, Astoria, Queens |
Queens |
DSNY |
|
Approved |
|
Agenda
Minutes
|
| Installation of interim steel bracing, Queens District 1 Garage, 34-28 21st Street, Astoria, Queens |
Queens |
DSNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of lighting at anaerobic digester tanks, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx |
Bronx |
DEP |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of lighting at anaerobic digester tanks, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop equipment, 18-18 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
|
Commented |
|
Agenda
Minutes
|
| Installation of security bollards, St. Patrick’s Cathedral, 14 East 51st Street, Fifth Avenue between East 50th Street and East 51st Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of security infrastructure, Empire State Building, 350 Fifth Avenue, Fifth Avenue, West 33rd Street, and West 34th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of security infrastructure, including bollards and planters, Rockefeller Center, Fifth Avenue between West 48th Street and West 51st Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an open space, Court Square Park, Court Square West, Jackson Avenue, and Court Square East, Long Island City, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a playground and athletic courts, Wakefield Playground, adjacent to P.S. 16, East 239th Street, Matilda Avenue, East 240th Street, and Carpenter Avenue, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a playground, James A. Bland Playground, 40th Road and Prince Street, Flushing, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a playground, James A. Bland Playground, 40th Road and Prince Street, Flushing, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Gorman Playground, 84th Street, 25th Avenue, 85th Street, and 30th Avenue, East Elmhurst, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Gorman Playground, 84th Street, 25th Avenue, 85th Street, and 30th Avenue, East Elmhurst, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Grant Park, East 169th Street, Morris Avenue, and East 170th Street, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Kelly Park Playground, East 14th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Kelly Park Playground, East 14th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Rainbow Playground, Sixth Avenue, between 55th Street and 56th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Rainbow Playground, Sixth Avenue, between 55th Street and 56th Street, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a roof, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of athletic courts, City Line Park, adjacent to Transit Tech Career and Technical High School, Conduit Boulevard, Fountain Avenue, and Wells Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Chappetto Square, 24th Drive, 23rd Street, Hoyt Avenue North, and 21st Street, Astoria, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of DeMatti Playground, Tompkins Avenue between Chestnut Avenue and Shaughnessy Lane, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Pershing Square East Plaza, Park Avenue between East 41st Street and East 42nd Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Rainey Park, Vernon Boulevard, 33rd Road, 34th Avenue, and the East River, Astoria, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the playground, St. Vartan Park, First Avenue, East 36th Street, Second Avenue, and East 35th Street, Manhattan |
Manhattan |
DPR |
|
Withdrawn |
|
Agenda
Minutes
|
| Reconstruction of three plazas, Flatbush Avenue at Sixth Avenue, Seventh Avenue and Carlton Avenue, Brooklyn |
Brooklyn |
DCA |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Victory Boulevard Pump Station, 4435 Victory Boulevard, Staten Island |
Staten Island |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Waring Playground, Bronx Park East between Waring Avenue and Thwaites Place, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, DeMatti Playground, Tompkins Avenue between Chestnut Avenue and Shaughnessy Lane, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann's Avenue at East 145th Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of comfort station, McDonald Playground, Forest Avenue and Myrtle Avenue between Broadway and North Burgher Avenue, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of Engine Company 276, 1635 East 14th Street, Brooklyn |
Brooklyn |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of steel structures, Concrete Plant Park, Bronx River Greenway, Westchester Avenue, the Bronx River, Bruckner Boulevard, and the Amtrak railroad, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the Arverne East Nature Preserve, Rockaway Beach between Beach 44th Street and Beach 56th Place, Arverne, Queens |
Queens |
DPR |
|
Withdrawn |
|
Agenda
Minutes
|
| Rehabilitation of the east facade, including the installation of signage, West Farms Branch Library, 2085 Honeywell Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|