| Construction of a plaza and railing, Beach Channel Drive, Beach 108th Street, Jamaica Bay, and Rockaway Freeway, Far Rockaway, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a prototypical comfort station, Harlem River Park, Harlem River Drive, East 128th Street, and the Third Avenue Bridge, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, St. George Ferry Terminal, Wall Street between Richmond Terrace and the Anchorage Channel, Staten Island |
Staten Island |
EDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a concrete pad (Adventures Family Entertainment Center), 1824 Shore Parkway, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of Along Woodhaven Boulevard by Priscila de Carvalho, Woodhaven Boulevard at the intersection of 101st Avenue and Rockaway Boulevard, Ozone Park, Queens |
Queens |
DCLA% |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of a mobile telecommunications equipment pole and antennas, 15-15 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a rooftop generator, Aeration and Final Settling Tank Building, Port Richmond Wastewater Resource Recovery Facility, 1800 Richmond Terrace, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a storefront system and signage (Starbucks), 625 Atlantic Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of louvers, Building 5, 7th Avenue, Paulding Street, 8th Avenue, and Farragut Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Installation of rooftop mechanical units, Gateway Center (formerly Bronx Terminal Market), 700 Exterior Street, Bronx |
Bronx |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of security infrastructure and adjacent site work, Adams Street between Tillary Street and Red Cross Place, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of temporary signage, Seneca Village Site, Central Park, between Central Park West, West 87th Street, and West 81st Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of Woodhaven in Motion by Robert Hickman, Woodhaven Boulevard at the intersection of Jamaica Avenue and 91st Street, Woodhaven, Queens |
Queens |
DCLA% |
Final |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of a ramp, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Pershing Square East Plaza, Park Avenue between East 41st Street and East 42nd Street, Manhattan |
Manhattan |
DDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
Presentation
|
| Reconstruction of the 10th Avenue Square, High Line Park (formerly elevated rail), 10th Avenue and West 17th Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the 210th Street Playground, Cunningham Park, 210th Street, 73rd Avenue, and the Clearview Expressway, Oakland Gardens, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a comfort station, Kelly Park Playground, adjacent to P.S. 255, East 17th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, Schaefer Landing, South 10th Street between Kent Avenue and the East River, Brooklyn |
Brooklyn |
EDC |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Installation of a barge, gangway, storage shed, and adjacent site work to accommodate citywide ferry service, including a parking lot and pathway, Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
EDC |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Design of prototypical shrouds for 4G and 5G mobile telecommunications equipment for installation on light poles citywide |
Citywide |
DoITT |
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a chlorine contact tank enclosure and a final effluent enclosure, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a dog run, Parade Ground, Prospect Park, Caton Avenue and Coney Island Avenue, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a plaza and railing, Beach Channel Drive, Beach 108th Street, Jamaica Bay, and Rockaway Freeway, Far Rockaway, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a plaza and railing, Beach Channel Drive, Beach 108th Street, Jamaica Bay, and Rockaway Freeway, Far Rockaway, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, Harlem River Park, Harlem River Drive, East 128th Street, and the Third Avenue Bridge, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, Harlem River Park, Harlem River Drive, East 128th Street, and the Third Avenue Bridge, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, Luther Gulick Playground, Delancey Street between Bialystoker Place and Columbia Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, Ten Eyck Playground, adjacent to P.S. 196, Scholes Street and Meserole Street between Bushwick Avenue and Waterbury Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a public health laboratory, Harlem Hospital Center, Lenox Avenue, West 137th Street, Fifth Avenue, and West 136th Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a screen chamber, downtake shaft vent building, electrical building and police booth and reconstruction of the landscape as part of the Kensico-Eastview Connection Project, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Design of an interpretive sign, Newtown Creek Wastewater Resource Recovery Facility, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Design of a signage system for East Side Coastal Resiliency, East River Park and the East River between Montgomery Street and East 25th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Design of prototypical ferry service landings and canopies for installation citywide |
Citywide |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Design of prototypical shrouds for 4G and 5G mobile telecommunications equipment for installation on light poles citywide |
Citywide |
DoITT |
|
Approved with conditions |
|
Agenda
Minutes
|
| Design of prototypical shrouds for 4G and 5G mobile telecommunications equipment for installation on light poles citywide |
Citywide |
DoITT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Design of yard-wide entrances, including reconstruction of gates and adjacent site work, Clymer Street at Kent Street, Flushing Avenue at Clinton Avenue, Flushing Avenue at Cumblerland Street, and Navy Street at Sands Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, Schaefer Landing, South 10th Street between Kent Avenue and the East River, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, Schaefer Landing, South 10th Street between Kent Avenue and the East River, Brooklyn |
Brooklyn |
EDC |
Final |
|
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, St. George Ferry Terminal, Wall Street between Richmond Terrace and the Anchorage Channel, Staten Island |
Staten Island |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a barge and gangway to accommodate citywide ferry service, St. George Ferry Terminal, Wall Street between Richmond Terrace and the Anchorage Channel, Staten Island |
Staten Island |
EDC |
Final |
|
|
Agenda
Minutes
|
| Installation of a barge, gangway, storage shed, and adjacent site work to accommodate citywide ferry service, including a parking lot and pathway, Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a barge, gangway, storage shed, and adjacent site work to accommodate citywide ferry service, including a parking lot and pathway, Ferry Point Park west of the Whitestone Bridge, between the Hutchinson River Parkway and the East River, Bronx |
Bronx |
EDC |
|
Tabled |
|
Agenda
Minutes
|
| Installation of a canopy and mechanical piping systems, Disinfection Building, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Installation of a concrete pad (Adventures Family Entertainment Center), 1824 Shore Parkway, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a concrete pad (Adventures Family Entertainment Center), 1824 Shore Parkway, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of Along Woodhaven Boulevard by Priscila de Carvalho, Woodhaven Boulevard at the intersection of 101st Avenue and Rockaway Boulevard, Ozone Park, Queens |
Queens |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of Along Woodhaven Boulevard by Priscila de Carvalho, Woodhaven Boulevard at the intersection of 101st Avenue and Rockaway Boulevard, Ozone Park, Queens |
Queens |
DCLA% |
Final |
|
|
Agenda
Minutes
|
| Installation of a mobile telecommunications equipment pole and antennas, 15-15 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a mobile telecommunications equipment pole and antennas, 15-15 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a pilot modular comfort station and adjacent site work, Luis Lopez Playground, Targee Street, Palma Drive, and Oder Avenue, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of a rooftop generator, Aeration and Final Settling Tank Building, Port Richmond Wastewater Resource Recovery Facility, 1800 Richmond Terrace, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a rooftop generator, Aeration and Final Settling Tank Building, Port Richmond Wastewater Resource Recovery Facility, 1800 Richmond Terrace, Staten Island |
Staten Island |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of a storefront system and signage (Starbucks), 625 Atlantic Avenue, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of a storefront system and signage (Starbucks), 625 Atlantic Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Installation of louvers, Building 5, 7th Avenue, Paulding Street, 8th Avenue, and Farragut Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of louvers, Building 5, 7th Avenue, Paulding Street, 8th Avenue, and Farragut Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Corona Health Center, 34-33 Junction Boulevard, Jackson Heights, Queens |
Queens |
DOHMH |
|
Commented |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Crown Heights Health Center, 1218 Prospect Place, Brooklyn |
Brooklyn |
DOHMH |
|
Commented |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Fort Greene Health Center, 295 Flatbush Avenue Extension, Brooklyn |
Brooklyn |
DOHMH |
|
Commented |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Jamaica Health Center, 90-37 Parsons Boulevard, Jamaica, Queens |
Queens |
DOHMH |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop louvers and electrical cabinet, 3 UN Plaza, East 44th Street between 1st Avenue and 2nd Avenue, Manhattan |
Manhattan |
HPD |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment and a screen, Baisley Park Community Library, 117-11 Sutphin Boulevard, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop mechanical units, Gateway Center (formerly Bronx Terminal Market), 700 Exterior Street, Bronx |
Bronx |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop mechanical units, Gateway Center (formerly Bronx Terminal Market), 700 Exterior Street, Bronx |
Bronx |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of security infrastructure and adjacent site work, Adams Street between Tillary Street and Red Cross Place, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of security infrastructure and adjacent site work, Adams Street between Tillary Street and Red Cross Place, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of temporary signage, Seneca Village Site, Central Park, between Central Park West, West 87th Street, and West 81st Street, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of temporary signage, Seneca Village Site, Central Park, between Central Park West, West 87th Street, and West 81st Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of Woodhaven in Motion by Robert Hickman, Woodhaven Boulevard at the intersection of Jamaica Avenue and 91st Street, Woodhaven, Queens |
Queens |
DCLA% |
Final |
|
|
Agenda
Minutes
|
| Installation of Woodhaven in Motion by Robert Hickman, Woodhaven Boulevard at the intersection of Jamaica Avenue and 91st Street, Woodhaven, Queens |
Queens |
DCLA% |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of a ramp, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a ramp, Ranaqua, Bronx Park, Bronx River Parkway and Birchall Avenue, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a step street, West Tremont Avenue between Cedar Avenue and Sedgwick Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of ballfields, a dog run, and promenade as Phase I of the reconstruction of St. Mary's Park, Jackson Avenue and East 143rd Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Fordham Plaza, including the construction of a café, a market building and four prototypical food kiosks, East Fordham Road, Third Avenue, Park Avenue and 189th Street, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Pershing Square East Plaza, Park Avenue between East 41st Street and East 42nd Street, Manhattan |
Manhattan |
DDC |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Pershing Square East Plaza, Park Avenue between East 41st Street and East 42nd Street, Manhattan |
Manhattan |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Reconstruction of Spuyten Duyvil Playground, Douglas Avenue between West 236th Street and West 235th Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the 10th Avenue Square, High Line Park (formerly elevated rail), 10th Avenue and West 17th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the 10th Avenue Square, High Line Park (formerly elevated rail), 10th Avenue and West 17th Street, Manhattan |
Manhattan |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of the 210th Street Playground, Cunningham Park, 210th Street, 73rd Avenue, and the Clearview Expressway, Oakland Gardens, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of the 210th Street Playground, Cunningham Park, 210th Street, 73rd Avenue, and the Clearview Expressway, Oakland Gardens, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the Bronx-Pelham Parkway westbound lanes and Pelham Parkway North, including the installation of Davit poles, from Boston Road to Stillwell Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, Kelly Park Playground, adjacent to P.S. 255, East 17th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, Kelly Park Playground, adjacent to P.S. 255, East 17th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of the east facade, including the installation of signage, West Farms Branch Library, 2085 Honeywell Avenue, Bronx |
Bronx |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the rooftop penthouse and installation rooftop mechanical equipment, 67th Street Library, 328 East 67th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|