| Conservation of Private Passage (2005)by Malcolm Cochran, Hudson River Park, Clinton Cove, between 12th Avenue and the Hudson River at West 56th Street, Manhattan. |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a distinctive sidewalk, the New York Public Library Stephen A. Schwarzman Building and Bryant Park, West 40th Street and West 42nd Street between Fifth Avenue and Sixth Avenue, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 101st Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 102nd Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 98th Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway between Beach 73rd Street and Beach 74th Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a stormwater detention wetland, Staten Island Bluebelt, Todt Hill Road and Whitlock Avenue, New Creek Watershed, Staten Island |
Staten Island |
DEP |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of an antenna enclosure, Downtown Manhattan Heliport, Pier 6, 20 South Street, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer pitch, P.S. 60, 55 Merrill Avenue, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a storefront, louvers, and rooftop mechanical equipment, Public Safety Answering Center, 11 MetroTech Center, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Cannon Avenue Pump Station, 183 Cannon Avenue, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Commerce Avenue Pump Station, 2500 Ellis Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Co-Op City North Pump Station, Co-Op City North Boulevard and Bellamy Loop, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Sapphire Street Pump Station, 2891 Linden Boulevard, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue at West 8th Street, Brooklyn. |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Central Harlem Health Center, 2238 Fifth Avenue, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Chelsea District Health Center, 303 Ninth Avenue, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Morrisania Health Center, 1309 Fulton Avenue, Bronx |
Bronx |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Riverside Health Center, 106 West 100th Street, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Redwood Upper Playground, Cunningham Park, 193rd Street between Aberdeen Road and Radnor Road, Fresh Meadows, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the Soldiers & Sailors Memorial Arch (1892) by John Hemingway Duncan, Prospect Park, Grand Army Plaza, Flatbush Avenue and Eastern Parkway, Brooklyn. |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a comfort station and adjacent site work, Commodore Barry Park, Flushing Avenue between Navy Street and North Elliott Place, Brooklyn |
Brooklyn |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a comfort station, Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East and Kepler Avenue, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the 108th Street Pump Station, including the installation of an emergency generator and odor control unit, 108-1 Horace Harding Expressway, Queens |
Queens |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Eltingville Pumping Station (formerly Brookfield Landfill), Arthur Kill Road and Brookfield Avenue, Staten Island |
Staten Island |
DEP |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a greenmarket food warehouse and distribution center, Hunts Point Food Distribution Center, Halleck Street and Viele Avenue, Bronx |
Bronx |
EDC |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of flood protection measures as part of the South Battery Park City Resiliency Master Plan, 1st Place between Battery Place and the Hudson River, Pier A Plaza, and The Battery, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Construction of ADA ramps and restoration of the Conservatory Garden, Central Park, Fifth Avenue at East 105th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Construction of an ADA ramp at the Dairy, Central Park, East 65th Street transverse road between Center Drive and East Drive, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Conservation of Private Passage (2005)by Malcolm Cochran, Hudson River Park, Clinton Cove, between 12th Avenue and the Hudson River at West 56th Street, Manhattan. |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Conservation of Private Passage (2005)by Malcolm Cochran, Hudson River Park, Clinton Cove, between 12th Avenue and the Hudson River at West 56th Street, Manhattan. |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a comfort station and adjacent site work, Owl Hollow Fields, Arthur Kill Road, Route 440 and Arden Avenue, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of ADA ramps and restoration of the Conservatory Garden, Central Park, Fifth Avenue at East 105th Street, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of ADA ramps and restoration of the Conservatory Garden, Central Park, Fifth Avenue at East 105th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk, the New York Public Library Stephen A. Schwarzman Building and Bryant Park, West 40th Street and West 42nd Street between Fifth Avenue and Sixth Avenue, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a distinctive sidewalk, the New York Public Library Stephen A. Schwarzman Building and Bryant Park, West 40th Street and West 42nd Street between Fifth Avenue and Sixth Avenue, Manhattan |
Manhattan |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a greenmarket food warehouse and distribution center, Hunts Point Food Distribution Center, Halleck Street and Viele Avenue, Bronx |
Bronx |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a greenmarket food warehouse and distribution center, Hunts Point Food Distribution Center, Halleck Street and Viele Avenue, Bronx |
Bronx |
EDC |
Final |
|
|
Agenda
Minutes
|
| Construction of a maintenance yard, including prefabricated trailers, storage containers, and adjacent site work, DEP Green Infrastructure Satellite Facility, 62 White Street, Brooklyn |
Brooklyn |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a mixed-use development, including a hotel tower and residential tower, 495 11th Avenue, 11th Avenue between 39th Street and 40th Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an ADA ramp at the Dairy, Central Park, East 65th Street transverse road between Center Drive and East Drive, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of an ADA ramp at the Dairy, Central Park, East 65th Street transverse road between Center Drive and East Drive, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 101st Street, Arverne, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 101st Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 102nd Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 102nd Street, Arverne, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 98th Street, Arverne, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway at Beach 98th Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway between Beach 73rd Street and Beach 74th Street, Arverne, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a seating area, Rockaway Beach, Shore Front Parkway between Beach 73rd Street and Beach 74th Street, Arverne, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a skate park, Jerome Playground South, Jerome Avenue, Cross Bronx Expressway, and Townsend Avenue, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a stormwater detention wetland, Staten Island Bluebelt, Todt Hill Road and Whitlock Avenue, New Creek Watershed, Staten Island |
Staten Island |
DEP |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a stormwater detention wetland, Staten Island Bluebelt, Todt Hill Road and Whitlock Avenue, New Creek Watershed, Staten Island |
Staten Island |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Construction of a water quality monitoring station, Shaft 3A, 903 East 233rd Street, Bronx |
Bronx |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of flood protection measures as part of the South Battery Park City Resiliency Master Plan, 1st Place between Battery Place and the Hudson River, Pier A Plaza, and The Battery, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of flood protection measures as part of the South Battery Park City Resiliency Master Plan, 1st Place between Battery Place and the Hudson River, Pier A Plaza, and The Battery, Manhattan |
Manhattan |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Installation of an antenna enclosure, Downtown Manhattan Heliport, Pier 6, 20 South Street, Manhattan |
Manhattan |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of an antenna enclosure, Downtown Manhattan Heliport, Pier 6, 20 South Street, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a reduced pressure zone device (RPZ) and an exhaust vent, Herbert Von King Cultural Arts Center, 670 Lafayette Avenue, Tompkins Park, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer pitch, P.S. 60, 55 Merrill Avenue, Staten Island |
Staten Island |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer pitch, P.S. 60, 55 Merrill Avenue, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a staircase and elevator, and reconstruction of an entrance plaza, including the installation of signage, High Line, West 17th Street, West 18th Street, 10th Avenue, and 11th Avenue, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of a storefront, louvers, and rooftop mechanical equipment, Public Safety Answering Center, 11 MetroTech Center, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a storefront, louvers, and rooftop mechanical equipment, Public Safety Answering Center, 11 MetroTech Center, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
Final |
|
|
Agenda
Minutes
|
| Installation of emergency power back-up equipment and perimeter improvements, Jamaica Wastewater Resource Recovery Facility, 150-20 134th Street, South Ozone Park, Queens |
Queens |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Cannon Avenue Pump Station, 183 Cannon Avenue, Staten Island |
Staten Island |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Cannon Avenue Pump Station, 183 Cannon Avenue, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Commerce Avenue Pump Station, 2500 Ellis Avenue, Bronx |
Bronx |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Commerce Avenue Pump Station, 2500 Ellis Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Co-Op City North Pump Station, Co-Op City North Boulevard and Bellamy Loop, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Co-Op City North Pump Station, Co-Op City North Boulevard and Bellamy Loop, Bronx |
Bronx |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Sapphire Street Pump Station, 2891 Linden Boulevard, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Sapphire Street Pump Station, 2891 Linden Boulevard, Brooklyn |
Brooklyn |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Installation of interim flood protection measures as part of the Battery Park City Resiliency Plan, Battery Park City Ballfields and Community Center, Warren Street, West Street, and Murray Street, Manhattan |
Manhattan |
DOT |
|
Commented |
|
Agenda
Minutes
|
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue at West 8th Street, Brooklyn. |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of K-159 (2010) by Frank Stella, New York Aquarium, 603 Surf Avenue at West 8th Street, Brooklyn. |
Brooklyn |
DPR |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Central Harlem Health Center, 2238 Fifth Avenue, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Central Harlem Health Center, 2238 Fifth Avenue, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Chelsea District Health Center, 303 Ninth Avenue, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Chelsea District Health Center, 303 Ninth Avenue, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Morrisania Health Center, 1309 Fulton Avenue, Bronx |
Bronx |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of mechanical equipment, Morrisania Health Center, 1309 Fulton Avenue, Bronx |
Bronx |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Riverside Health Center, 106 West 100th Street, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Riverside Health Center, 106 West 100th Street, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of security infrastructure, Empire State Building, 350 Fifth Avenue, Fifth Avenue, West 33rd Street, and West 34th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of sports lighting, Ferry Point Park Golf Course, Balcom Avenue, Miles Avenue, the Whitestone Bridge approach, and the East River, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of two generators and switchgear, Hunts Point Cooperative Market, 355 Food Center Drive, Bronx |
Bronx |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of Unity by Hank Willis Thomas, Tillary Street, between Cadman Plaza East and Adams Street, Brooklyn |
Brooklyn |
DCLA% |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a portion of Rainbow Playground, Sixth Avenue between 55th Street and 56th Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of Starr Playground, Onderdonk Avenue and Willoughby Avenue, Ridgewood, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of the bulkhead and adjacent site work, Tallman Island Wastewater Resource Recovery Facility, 127th Street and Powell's Cove Boulevard, College Point, Queens |
Queens |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a portion of the playground, adjacent to P.S. 155 (William Paca School), First Avenue, East 117th Street, Second Avenue, and East 118th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Davidson Playground, Davidson Avenue between West 176th Street and West 177th Street, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Ericsson Playground, adjacent to M.S. 126, Manhattan Avenue and Leonard Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Redwood Upper Playground, Cunningham Park, 193rd Street between Aberdeen Road and Radnor Road, Fresh Meadows, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Redwood Upper Playground, Cunningham Park, 193rd Street between Aberdeen Road and Radnor Road, Fresh Meadows, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of soccer fields 1 & 3 as Phase IV of the reconstruction of the Red Hook Recreation Area, Clinton Street, Bay Street, and Court Street, Brooklyn |
Brooklyn |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of the Soldiers & Sailors Memorial Arch (1892) by John Hemingway Duncan, Prospect Park, Grand Army Plaza, Flatbush Avenue and Eastern Parkway, Brooklyn. |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the Soldiers & Sailors Memorial Arch (1892) by John Hemingway Duncan, Prospect Park, Grand Army Plaza, Flatbush Avenue and Eastern Parkway, Brooklyn. |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of a comfort station and adjacent site work, Commodore Barry Park, Flushing Avenue between Navy Street and North Elliott Place, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a comfort station and adjacent site work, Commodore Barry Park, Flushing Avenue between Navy Street and North Elliott Place, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East and Kepler Avenue, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, Woodlawn Playground, Van Cortlandt Park, Van Cortlandt Park East and Kepler Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of Emergency Medical Services 4 (EMS 4), including the installation of an emergency generator, Pier 36, 270 South Street, Manhattan |
Manhattan |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the 108th Street Pump Station, including the installation of an emergency generator and odor control unit, 108-1 Horace Harding Expressway, Queens |
Queens |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the 108th Street Pump Station, including the installation of an emergency generator and odor control unit, 108-1 Horace Harding Expressway, Queens |
Queens |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the Eltingville Pumping Station (formerly Brookfield Landfill), Arthur Kill Road and Brookfield Avenue, Staten Island |
Staten Island |
DEP |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the Eltingville Pumping Station (formerly Brookfield Landfill), Arthur Kill Road and Brookfield Avenue, Staten Island |
Staten Island |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Replication and conservation of Fame, part of the Louis J. Heintz Memorial (1905) by Pierre Fietu, Joyce Kilmer Park, East 164th Street, Walton Avenue and Grand Concourse, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|