PDC Meeting — 2019-01-22

Agenda PDF · Minutes & Certificates · 139 items

Agenda Items

ProjectBoroughAgencyStageResultSectionDocuments
Conservation and Relocation of the Highbridge Doughboy (1923) from the triangle park between Boscobel Place, Ogden, and Boscobel Avenues to Macombs Dam Park, Jerome Avenue and 161st Street, Bronx Bronx DPR Final Consent Items Agenda
Minutes
Conservation of the Dover Patrol Monument, John Paul Jones Park, Fourth Avenue and 101st Street, Brooklyn Brooklyn DPR Final Consent Items Agenda
Minutes
Construction of a dog run, Devoe Park, Sedgwick Avenue and West Fordham Road, Bronx Bronx DPR Final Consent Items Agenda
Minutes
Construction of a kayak launch, installation of a storage container, and reconstruction of the shoreline, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens Queens EDC Final Consent Items Agenda
Minutes
Construction of an ADA ramp and stairs, 37 West 93rd Street, Manhattan Manhattan DOT Final Consent Items Agenda
Minutes
Construction of an ADA ramp, East 82nd Street and John Finley Walk, Manhattan Manhattan DPR Preliminary Consent Items Agenda
Minutes
Construction of anaerobic digester tanks, a pumping station, and adjacent site work, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx Bronx DEP Preliminary Consent Items Agenda
Minutes
Construction of athletic courts and an adult fitness area, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn Brooklyn DCLA% Final Consent Items Agenda
Minutes
Construction of Site B as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Preliminary Consent Items Agenda
Minutes
Construction of Site D as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Final Consent Items Agenda
Minutes
Design of a tenant signage system, Admiral's Row Plaza, Navy Street, Flushing Avenue, Fourth Street, and Gate Street, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Preliminary and Final Consent Items Agenda
Minutes
Installation of a fuel tank access hatch and ventilation equipment, Engine Company 209/Ladder Company 102, 850 Bedford Avenue, Brooklyn Brooklyn DDC Preliminary and Final Consent Items Agenda
Minutes
Installation of a prototypical newsstand, 303 East 83rd Street, northeast corner of Second Avenue and East 83rd Street, Manhattan Manhattan DCA Preliminary and Final Consent Items Agenda
Minutes
Installation of commemorative plaques and a flagpole, 239th Street median at Hillside Avenue, Bellerose, Queens Queens DOT Preliminary Consent Items Agenda
Minutes
Installation of Prism Arbor by Xenobia Bailey, Parachute Way Plaza between Surf Avenue and the Riegelmann Boardwalk, Brooklyn Brooklyn DCLA% Preliminary Consent Items Agenda
Minutes
Installation of rooftop mechanical equipment, Museum of Modern Art PS1, 22-25 Jackson Avenue (P.S. 1 Contemporary Art Center, 46-01 21st Street), Long Island City, Queens Queens DDC Preliminary and Final Consent Items Agenda
Minutes
Installation of security infrastructure, including bollards and planters, Rockefeller Center, Fifth Avenue between West 48th Street and West 51st Street, Manhattan Manhattan DDC Final Consent Items Agenda
Minutes
Installation of sewer access hatches, 114th Police Precinct, 34-16 Astoria Boulevard, Long Island City, Queens Queens DDC Preliminary and Final Consent Items Agenda
Minutes
Installation of signage, West Thames Pedestrian Bridge over Route 9A, West Street between West Thames Street and Joseph P. Ward Street, Manhattan Manhattan EDC Preliminary and Final Consent Items Agenda
Minutes
Installation of streetscape improvements, Beach 108th Street between Beach Channel Drive and Shore Front Parkway, Rockaway Park, Queens Queens DDC Preliminary Consent Items Agenda
Minutes
Reconstruction of a pedestrian path and ADA improvements, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan Manhattan DPR Preliminary and Final Consent Items Agenda
Minutes
Reconstruction of a plaza and adjacent site work, Queens Borough Hall, 120-55 Queens Boulevard, Kew Gardens, Queens Queens DDC Final Consent Items Agenda
Minutes
Reconstruction of baseball fields 2 and 3 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn Brooklyn DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of column foundations (Summer Stage) Rumsey Playfield, 72nd Street and East Drive, Central Park, Manhattan Manhattan DPR Final Consent Items Agenda
Minutes
Reconstruction of Harlem Lane Park and Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, and Harlem River Drive, Manhattan Manhattan DPR Final Consent Items Agenda
Minutes
Reconstruction of Ravenswood Playground, 35th Avenue, 21st Street, and 34th Avenue, Astoria, Queens Queens DPR Final Consent Items Agenda
Minutes
Reconstruction of the playground, White Park, Lyman Avenue, Summer Street, High Street, and Bay Street, Staten Island Staten Island DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of the World's Fair Marina, Flushing Bay Promenade, Flushing Meadows Corona Park, Corona, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of track 1, soccer fields 3, 4 & 5, and ballfields 1-4 as Phase III of the reconstruction of the Red Hook Recreation Area, Columbia Street and Bay Street, Brooklyn Brooklyn DPR Final Consent Items Agenda
Minutes
Rehabilitation of a comfort station, Grove Hill Playground, adjacent to P.S. 157, East 158th Street between Eagle Avenue and Cauldwell Avenue, Bronx Bronx DPR Final Consent Items Agenda
Minutes
Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island Staten Island DPR Preliminary Consent Items Agenda
Minutes
Rehabilitation of the pier over John Finley Walk, Brearley School, 610 East 83rd Street, Manhattan Manhattan DCAS Preliminary Consent Items Agenda
Minutes
Construction of a section of Hudson Park and Boulevard, Phase IIA, 10th Avenue and 11th Avenue from 36th Street to 37th Street, Manhattan Manhattan EDC Final Public Hearing Agenda
Minutes
Conservation and Relocation of the Highbridge Doughboy (1923) from the triangle park between Boscobel Place, Ogden, and Boscobel Avenues to Macombs Dam Park, Jerome Avenue and 161st Street, Bronx Bronx DPR Approved Agenda
Minutes
Conservation and Relocation of the Highbridge Doughboy (1923) from the triangle park between Boscobel Place, Ogden, and Boscobel Avenues to Macombs Dam Park, Jerome Avenue and 161st Street, Bronx Bronx DPR Final Agenda
Minutes
Conservation of the Dover Patrol Monument, John Paul Jones Park, Fourth Avenue and 101st Street, Brooklyn Brooklyn DPR Approved Agenda
Minutes
Conservation of the Dover Patrol Monument, John Paul Jones Park, Fourth Avenue and 101st Street, Brooklyn Brooklyn DPR Final Agenda
Minutes
Construction of a dog run, Devoe Park, Sedgwick Avenue and West Fordham Road, Bronx Bronx DPR Approved Agenda
Minutes
Construction of a dog run, Devoe Park, Sedgwick Avenue and West Fordham Road, Bronx Bronx DPR Final Agenda
Minutes
Construction of a field house and adjacent site work (Sportime), One Randall's Island, Manhattan Manhattan DPR Commented Agenda
Minutes
Construction of a kayak launch, installation of a storage container, and reconstruction of the shoreline, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens Queens EDC Final Agenda
Minutes
Construction of a kayak launch, installation of a storage container, and reconstruction of the shoreline, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens Queens EDC Approved Agenda
Minutes
Construction of an ADA ramp and stairs, 37 West 93rd Street, Manhattan Manhattan DOT Final Agenda
Minutes
Construction of an ADA ramp and stairs, 37 West 93rd Street, Manhattan Manhattan DOT Approved Agenda
Minutes
Construction of an ADA ramp, East 82nd Street and John Finley Walk, Manhattan Manhattan DPR Approved Agenda
Minutes
Construction of an ADA ramp, East 82nd Street and John Finley Walk, Manhattan Manhattan DPR Preliminary Agenda
Minutes
Construction of anaerobic digester tanks, a pumping station, and adjacent site work, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx Bronx DEP Approved with conditions Agenda
Minutes
Construction of anaerobic digester tanks, a pumping station, and adjacent site work, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx Bronx DEP Preliminary Agenda
Minutes
Construction of an enclosure, Fred P. Pomerantz Art and Design Center, 300 Seventh Avenue, Fashion Institute of Technology, Manhattan Manhattan DOE Commented Agenda
Minutes
Construction of an entrance, including installation of an ADA ramp, Queens Borough Hall, 120-55 Queens Boulevard, Queens Queens DDC Commented Agenda
Minutes
Construction of a prototypical comfort station, Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, the Harlem River Drive, and West 151st Street, Manhattan Manhattan DPR Commented Agenda
Minutes
Construction of a section of Hudson Park and Boulevard, Phase IIA, 10th Avenue and 11th Avenue from 36th Street to 37th Street, Manhattan Manhattan EDC Final Agenda
Minutes
Construction of a section of Hudson Park and Boulevard, Phase IIA, 10th Avenue and 11th Avenue from 36th Street to 37th Street, Manhattan Manhattan EDC Approved Agenda
Minutes
Construction of athletic courts and an adult fitness area, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens Queens DPR Approved Agenda
Minutes
Construction of athletic courts and an adult fitness area, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens Queens DPR Preliminary Agenda
Minutes
Construction of a truck weigh station, compost structures, and adjacent site work, 450 West Service Road, Staten Island Staten Island DSNY Commented Agenda
Minutes
Construction of bridges over West 203rd Street connecting two Con Edison buildings, 3775 Ninth Avenue and 3795 Ninth Avenue, Manhattan Manhattan DOT Commented Agenda
Minutes
Construction of Gateway Park and installation of streetscape improvements, Van Wyck service road, 94th Avenue, 95th Avenue, 150th Street, Jamaica, Queens Queens EDC Commented Agenda
Minutes
Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn Brooklyn DCLA% Final Agenda
Minutes
Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn Brooklyn DCLA% Approved with conditions Agenda
Minutes
Construction of Site B as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Approved Agenda
Minutes
Construction of Site B as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Preliminary Agenda
Minutes
Construction of Site D as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Approved Agenda
Minutes
Construction of Site D as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Final Agenda
Minutes
Construction of streetscape improvements, including reconstruction of an entrance at Our Lady of Lourdes Church and Corporal Allan F. Kivlehan Park, between Milton Avenue, New Dorp Lane, Cedar Grove Avenue, Ebbits Street, and Hetts Avenue, Staten Island Staten Island DDC Found Incomplete Agenda
Minutes
Design of a prototypical station for select bus service for installation citywide Citywide DOT Commented Agenda
Minutes
Design of a tenant signage system, Admiral's Row Plaza, Navy Street, Flushing Avenue, Fourth Street, and Gate Street, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Preliminary and Final Agenda
Minutes
Design of a tenant signage system, Admiral's Row Plaza, Navy Street, Flushing Avenue, Fourth Street, and Gate Street, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Approved Agenda
Minutes
Design of shade structures, Rockaway Beach, Beach 59th Street Playground, Beach 98th Street Playground, and Shore Front Parkway between Beach 77th Street and Beach 81st Street and between Beach 101st Street and Beach 102nd Street, Arverne and Rockaway Park, Queens Queens DPR Commented Agenda
Minutes
Installation of aeration tank mixer platforms, piping, conduit, louvers and lighting as part of a Level 1 Biological Nutrient Removal Upgrade, Coney Island Wastewater Treatment Plant, 2591 Knapp Street, Brooklyn Brooklyn DEP Commented Agenda
Minutes
Installation of a fuel tank access hatch and ventilation equipment, Engine Company 209/Ladder Company 102, 850 Bedford Avenue, Brooklyn Brooklyn DDC Preliminary and Final Agenda
Minutes
Installation of a fuel tank access hatch and ventilation equipment, Engine Company 209/Ladder Company 102, 850 Bedford Avenue, Brooklyn Brooklyn DDC Approved Agenda
Minutes
Installation of a Hollis neighborhood identification sign, Gladys Warren Triangle, Hollis Avenue, 104th Avenue, and 194th Street, St. Albans, Queens Queens DPR Commented Agenda
Minutes
Installation of a long range charging mast and two electrical equipment enclosures as a pilot of an electric bus program (“All Electric Bus”), Williamsburg Bridge Plaza, Havemeyer Street, Broadway, and Roebling Street, Brooklyn Brooklyn DOT Commented Agenda
Minutes
Installation of a prototypical newsstand, 1180 2nd Avenue, northeast corner of 2nd Avenue and East 62nd Street, Manhattan Manhattan DCA Withdrawn Agenda
Minutes
Installation of a prototypical newsstand, 1335 6th Avenue, southwest corner of 6th Avenue and West 54th Street, Manhattan Manhattan DCA Commented Agenda
Minutes
Installation of a prototypical newsstand, 2802 Jackson Avenue, southeast corner of Jackson Avenue and Orchard Street, Long Island City, Queens Queens DCA Withdrawn Agenda
Minutes
Installation of a prototypical newsstand, 303 East 83rd Street, northeast corner of Second Avenue and East 83rd Street, Manhattan Manhattan DCA Approved Agenda
Minutes
Installation of a prototypical newsstand, 303 East 83rd Street, northeast corner of Second Avenue and East 83rd Street, Manhattan Manhattan DCA Preliminary and Final Agenda
Minutes
Installation of a prototypical newsstand, 423 9th Avenue, southwest corner of West 34th Street and 9th Avenue, Manhattan Manhattan DCA Commented Agenda
Minutes
Installation of a roof, Richmondtown Library, 200 Clarke Avenue, Staten Island Staten Island DDC Commented Agenda
Minutes
Installation of a storage shed, The Pier Pavilion, Hunter’s Point South Waterfront Park (Phase I), Borden Avenue, Center Boulevard, 54th Avenue, and the East River, Long Island City, Queens Queens DPR Commented Agenda
Minutes
Installation of commemorative plaques and a flagpole, 239th Street median at Hillside Avenue, Bellerose, Queens Queens DOT Preliminary Agenda
Minutes
Installation of commemorative plaques and a flagpole, 239th Street median at Hillside Avenue, Bellerose, Queens Queens DOT Approved Agenda
Minutes
Installation of Dr. Sun Yat-sen (2011) by Lu Chun-Hsiung, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan Manhattan DPR Commented Agenda
Minutes
Installation of garage doors, Brooklyn 11 District Garage, 1824 Shore Parkway, Brooklyn Brooklyn DDC Commented Agenda
Minutes
Installation of garage doors, Queens West Central Repair Shop, 52-35 58th Street, Queens Queens DDC Commented Agenda
Minutes
Installation of garage doors, Staten Island 1 District Garage, 600 West Service Road, Staten Island Staten Island DDC Commented Agenda
Minutes
Installation of Prism Arbor by Xenobia Bailey, Parachute Way Plaza between Surf Avenue and the Riegelmann Boardwalk, Brooklyn Brooklyn DCLA% Approved Agenda
Minutes
Installation of Prism Arbor by Xenobia Bailey, Parachute Way Plaza between Surf Avenue and the Riegelmann Boardwalk, Brooklyn Brooklyn DCLA% Preliminary Agenda
Minutes
Installation of prototypical signage, Brownsville Health Center, 259 Bristol Street, Brooklyn Brooklyn DOH Commented Agenda
Minutes
Installation of prototypical signage, East Harlem Health Center, 158 East 115th Street, Manhattan Manhattan DOHMH Commented Agenda
Minutes
Installation of rooftop mechanical equipment, Museum of Modern Art PS1, 22-25 Jackson Avenue (P.S. 1 Contemporary Art Center, 46-01 21st Street), Long Island City, Queens Queens DDC Approved Agenda
Minutes
Installation of rooftop mechanical equipment, Museum of Modern Art PS1, 22-25 Jackson Avenue (P.S. 1 Contemporary Art Center, 46-01 21st Street), Long Island City, Queens Queens DDC Preliminary and Final Agenda
Minutes
Installation of security infrastructure, including bollards and planters, Rockefeller Center, Fifth Avenue between West 48th Street and West 51st Street, Manhattan Manhattan DDC Approved Agenda
Minutes
Installation of security infrastructure, including bollards and planters, Rockefeller Center, Fifth Avenue between West 48th Street and West 51st Street, Manhattan Manhattan DDC Final Agenda
Minutes
Installation of sewer access hatches, 114th Police Precinct, 34-16 Astoria Boulevard, Long Island City, Queens Queens DDC Approved Agenda
Minutes
Installation of sewer access hatches, 114th Police Precinct, 34-16 Astoria Boulevard, Long Island City, Queens Queens DDC Preliminary and Final Agenda
Minutes
Installation of signage, High Line Park (formerly elevated rail line), Phase IV, West 30th Street between 10th Avenue and 11th Avenue, Manhattan Manhattan DPR Commented Agenda
Minutes
Installation of signage, West Thames Pedestrian Bridge over Route 9A, West Street between West Thames Street and Joseph P. Ward Street, Manhattan Manhattan EDC Approved Agenda
Minutes
Installation of signage, West Thames Pedestrian Bridge over Route 9A, West Street between West Thames Street and Joseph P. Ward Street, Manhattan Manhattan EDC Preliminary and Final Agenda
Minutes
Installation of streetscape improvements, Beach 108th Street between Beach Channel Drive and Shore Front Parkway, Rockaway Park, Queens Queens DDC Preliminary Agenda
Minutes
Installation of streetscape improvements, Beach 108th Street between Beach Channel Drive and Shore Front Parkway, Rockaway Park, Queens Queens DDC Approved Agenda
Minutes
Installation of the Elizabeth Cady Stanton and Susan B. Anthony Monument by Meredith Bergmann, Literary Walk, The Mall, Central Park, Manhattan Manhattan DPR Commented Agenda
Minutes
Installation of two HVAC units and a louver, New York City Center for Aerospace and Applied Mathematics, 220 Henry Street, Manhattan Manhattan DOE Commented Agenda
Minutes
Reconstruction of a clubhouse (Gaelic Park Sports Centre), 205 West 240th Street, Bronx Bronx NYCT Commented Agenda
Minutes
Reconstruction of a pedestrian path and ADA improvements, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan Manhattan DPR Approved Agenda
Minutes
Reconstruction of a pedestrian path and ADA improvements, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan Manhattan DPR Preliminary and Final Agenda
Minutes
Reconstruction of a plaza and adjacent site work, Queens Borough Hall, 120-55 Queens Boulevard, Kew Gardens, Queens Queens DDC Final Agenda
Minutes
Reconstruction of a plaza and adjacent site work, Queens Borough Hall, 120-55 Queens Boulevard, Kew Gardens, Queens Queens DDC Approved Agenda
Minutes
Reconstruction of a portion of Bellevue South Park, Mount Carmel Place between East 26th Street and East 28th Street, Manhattan Manhattan DPR Withdrawn Agenda
Minutes
Reconstruction of baseball fields 2 and 3 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn Brooklyn DPR Preliminary Agenda
Minutes
Reconstruction of baseball fields 2 and 3 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn Brooklyn DPR Approved Agenda
Minutes
Reconstruction of column foundations (Summer Stage) Rumsey Playfield, 72nd Street and East Drive, Central Park, Manhattan Manhattan DPR Approved Agenda
Minutes
Reconstruction of column foundations (Summer Stage) Rumsey Playfield, 72nd Street and East Drive, Central Park, Manhattan Manhattan DPR Final Agenda
Minutes
Reconstruction of Harlem Lane Park and Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, and Harlem River Drive, Manhattan Manhattan DPR Approved Agenda
Minutes
Reconstruction of Harlem Lane Park and Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, and Harlem River Drive, Manhattan Manhattan DPR Final Agenda
Minutes
Reconstruction of Ravenswood Playground, 35th Avenue, 21st Street, and 34th Avenue, Astoria, Queens Queens DPR Approved Agenda
Minutes
Reconstruction of Ravenswood Playground, 35th Avenue, 21st Street, and 34th Avenue, Astoria, Queens Queens DPR Final Agenda
Minutes
Reconstruction of Sergeant William Dougherty Playground, including construction of a skate park and comfort station, Anthony Street, Vandervoort Avenue, Cherry Street and Porter Avenue, Brooklyn Brooklyn DPR Commented Agenda
Minutes
Reconstruction of steps and construction of an ADA ramp, Our Lady of Lourdes Church, 128 Cedar Grove Avenue, Great Kills Park, Staten Island Staten Island DDC Commented Agenda
Minutes
Reconstruction of the coastline (East Side Coastal Resiliency) and East River Park, East River between Montgomery Street and East 25th Street, Manhattan Manhattan DDC Commented Agenda
Minutes
Reconstruction of the playground, White Park, Lyman Avenue, Summer Street, High Street, and Bay Street, Staten Island Staten Island DPR Approved Agenda
Minutes
Reconstruction of the playground, White Park, Lyman Avenue, Summer Street, High Street, and Bay Street, Staten Island Staten Island DPR Preliminary Agenda
Minutes
Reconstruction of the World's Fair Marina, Flushing Bay Promenade, Flushing Meadows Corona Park, Corona, Queens Queens DPR Approved Agenda
Minutes
Reconstruction of the World's Fair Marina, Flushing Bay Promenade, Flushing Meadows Corona Park, Corona, Queens Queens DPR Preliminary Agenda
Minutes
Reconstruction of track 1, soccer fields 3, 4 & 5, and ballfields 1-4 as Phase III of the reconstruction of the Red Hook Recreation Area, Columbia Street and Bay Street, Brooklyn Brooklyn DPR Final Agenda
Minutes
Reconstruction of track 1, soccer fields 3, 4 & 5, and ballfields 1-4 as Phase III of the reconstruction of the Red Hook Recreation Area, Columbia Street and Bay Street, Brooklyn Brooklyn DPR Approved Agenda
Minutes
Rehabilitation of a comfort station, Grove Hill Playground, adjacent to P.S. 157, East 158th Street between Eagle Avenue and Cauldwell Avenue, Bronx Bronx DPR Approved Agenda
Minutes
Rehabilitation of a comfort station, Grove Hill Playground, adjacent to P.S. 157, East 158th Street between Eagle Avenue and Cauldwell Avenue, Bronx Bronx DPR Final Agenda
Minutes
Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island Staten Island DPR Approved Agenda
Minutes
Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island Staten Island DPR Preliminary Agenda
Minutes
Rehabilitation of the Leonard Covello Senior Center, 312 East 109th Street, Manhattan Manhattan DDC Commented Agenda
Minutes
Rehabilitation of the New Administration Building, 104 B Road, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan Manhattan DEP Commented Agenda
Minutes
Rehabilitation of the pier over John Finley Walk, Brearley School, 610 East 83rd Street, Manhattan Manhattan DCAS Approved with conditions Agenda
Minutes
Rehabilitation of the pier over John Finley Walk, Brearley School, 610 East 83rd Street, Manhattan Manhattan DCAS Preliminary Agenda
Minutes
Rehabilitation of the Schomburg Center for Research in Black Culture, including the construction of an addition and installation of a distinctive sidewalk, 515 Malcolm X Boulevard between West 135th Street and West 136th Street, Manhattan Manhattan DDC Commented Agenda
Minutes
Renovation of Buildings A and C (Made in NY-North), Bush Terminal Industrial Campus, 13 42nd Street and One 43rd Street, Brooklyn Brooklyn EDC Commented Agenda
Minutes