| Conservation and reinstallation of Horse and Steer (1936) by Alan Saalburg, Split Rock Golf Course Club House, Pelham Bay Park, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a fenced-in planted area, including steps, 59 East 80th Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a garden entrance and adjacent site work, Dag Hammarskjold Plaza, East 47th between 1st Avenue and 2nd Avenue, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a guard booth and reconstruction of athletic courts and adjacent site work at the Christopher School Facility as part of the construction of the Edenwald YMCA, 1250 East 229th Street at Schieffelin Place, Bronx |
Bronx |
EDC |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an adult fitness area and adjacent site work, Riverside Park and West 76th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a prototypical comfort station, as Phase II of the reconstruction of Highbridge Park, Edgecombe Avenue, West 163rd to West 168th Street, and West 175th Street to West 176th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a prototypical planted raised median, Phase I, 4th Avenue from 8th Street to 64th Street, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of retaining walls and adjacent site work, 346 43rd Street, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of two residential buildings (Buildings 2 and 3) as part of the rehabilitation of the Bedford Union Armory, 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Design of a prototypical gate to accommodate citywide ferry service at existing barge and gangway locations for installation citywide |
Citywide |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Design of prototypical building identification signage for installation citywide |
Citywide |
DOHMH |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a distinctive sidewalk, Chanel, 15 East 57th Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a door and transom, British International School, 20 Waterside Plaza, Manhattan |
Manhattan |
HPD |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a mural, Building 72, Market Street between Dry Docks 2 and 3, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
Brooklyn |
BNYDC |
Conceptual |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, M.S. 45 Thomas C. Giordano School, 2502 Lorillard Place, Bronx |
Bronx |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S./I.S. 384 Frances E. Carter School, 242 Cooper Street, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a soccer sealcoat field, Playground 62, adjacent to P.S. 220, 62nd Road and 108th Street, Corona, Queens |
Queens |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of doors, Department of Sanitation garage, Manhattan 3, 270 South Street, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of doors, Department of Sanitation garage, Queens 7 Annex, 120-15 31st Avenue, Flushing, Queens |
Queens |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of interim trailers, Horizon Juvenile Center, 560 Brook Avenue, Bronx |
Bronx |
DDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of planters, Flatbush Avenue between Pacific Street and St. Johns Place, Brooklyn |
Brooklyn |
DOT |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, Brownsville Health Center, 259 Bristol Street, Brooklyn |
Brooklyn |
DOHMH |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, East Harlem Health Center, 158 East 115th Street, Manhattan |
Manhattan |
DOHMH |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, Tremont Health Center, 1826 Arthur Avenue, Bronx |
Bronx |
DOHMH |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Engine Company 24, 227 Sixth Avenue, Manhattan |
Manhattan |
FDNY |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Repairs and Transportation (R & T) Building, 48-34 35th Street, Long Island City, Queens |
Queens |
FDNY |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of rooftop photovoltaic panels, electrical cabinets, and adjacent site work, 1150 Commerce Avenue, Bronx |
Bronx |
DCAS |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage (New Balance), Citi Field, 120-01 Roosevelt Avenue, Corona, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage, Verizon Executive Education Center and Graduate Hotel, as part of Phase I of the construction of Cornell University/Cornell Tech campus, Roosevelt Island, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of two sealcoat soccer fields, I.S. 72 Police Officer Rocco Laurie School, 33 Ferndale Avenue, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of windows, louvers, and mechanical equipment, Emergency Medical Station 20 (EMS 20), 1400 Pelham Parkway South, Bronx |
Bronx |
FDNY |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of Writings at Helin Temple by Xu Bing, Forsyth Plaza, Canal Street, Forsyth Street, and the Manhattan Bridge approach ramp, Manhattan |
Manhattan |
DCLA% |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of an addition, Engine Company 292 and Rescue Company 4, 64-18 Queens Boulevard, Woodside, Queens |
Queens |
FDNY |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of an athletic field, construction of an entry plaza, and adjacent site work, Frank Golden Park, 132nd Street between 14th Avenue and 20th Avenue, College Point, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Bartlett Playground, Bartlett Street, Throop Avenue, Whipple Street, and Flushing Avenue, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Bill Bojangles Robinson Playground, West 150th Street and Seventh Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Chappetto Square, 24th Drive, 23rd Street, Hoyt Avenue North, and 21st Street, Astoria, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Kossuth Playground, Mosholu Parkway North, Jerome Avenue, and Van Cortlandt Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Mariners Harbor Playground, Harbor Road between Richmond Terrace and Leyden Avenue, Staten Island |
Staten Island |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Mauro Playground, Park Drive East and 73rd Terrace, Flushing, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of stairs and paths, Joan of Arc Island, Riverside Park, between West 91st Street and West 95th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the Children's Playground, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the East 96th Street Playground, Central Park, Fifth Avenue and East 96th Street, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the tot lot, Travers Park, 34th Avenue between 77th Street and 78th Street, Jackson Heights, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of two Route 28A bridges over Esopus Creek and the former Ulster and Delaware Railroad corridor, Olive, Ulster County |
Upstate |
DEP |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann's Avenue at East 145th Street, Bronx |
Bronx |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the Bedford Union Armory (Building 1), 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of the East New York Industrial Building, 191-201 Powell Street, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Renovation of a playground (Safari Playground), Central Park between West 91st Street, West 92nd Street, Park Drive, and Central Park West, Manhattan |
Manhattan |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Rehabilitation of a building and construction of an addition, Melrose Branch Library, New York Public Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Installation of a prototypical newsstand, 1879 Broadway, southwest corner of Broadway and West 62nd Street, Manhattan |
Manhattan |
DCA |
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|
| Broadway Bedford Plaza |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Conservation and reinstallation of Horse and Steer (1936) by Alan Saalburg, Split Rock Golf Course Club House, Pelham Bay Park, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Conservation and reinstallation of Horse and Steer (1936) by Alan Saalburg, Split Rock Golf Course Club House, Pelham Bay Park, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a commercial and light-industrial building, Building 72, between Dry Docks 2 and 3, 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a dog run, Soundview Park, Lafayette Avenue between Colgate Avenue and Bolton Avenue, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a fenced-in planted area, including steps, 59 East 80th Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a fenced-in planted area, including steps, 59 East 80th Street, Manhattan |
Manhattan |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Construction of a garden entrance and adjacent site work, Dag Hammarskjold Plaza, East 47th between 1st Avenue and 2nd Avenue, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a garden entrance and adjacent site work, Dag Hammarskjold Plaza, East 47th between 1st Avenue and 2nd Avenue, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a grandstand stadium, reconstruction of the southern tennis courts and adjacent site work as part of the United States Tennis Association's Billie Jean King National Tennis Center strategic vision plan, Flushing Meadows Corona Park, Queens |
Queens |
DPR |
|
Found incomplete |
|
Agenda
Minutes
|
| Construction of a greenmarket food warehouse and distribution center, Hunts Point Food Distribution Center, Halleck Street and Viele Avenue, Bronx |
Bronx |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a guard booth and reconstruction of athletic courts and adjacent site work at the Christopher School Facility as part of the construction of the Edenwald YMCA, 1250 East 229th Street at Schieffelin Place, Bronx |
Bronx |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a guard booth and reconstruction of athletic courts and adjacent site work at the Christopher School Facility as part of the construction of the Edenwald YMCA, 1250 East 229th Street at Schieffelin Place, Bronx |
Bronx |
EDC |
Final |
|
|
Agenda
Minutes
|
| Construction of an administration building and guard booth as Phase II of the construction of an NYPD vehicle impound facility, Rockaway Boulevard, Guy Brewer Boulevard, Farmers Boulevard, JFK International Airport, Queens |
Queens |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an adult fitness area and adjacent site work, Riverside Park and West 76th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of an adult fitness area and adjacent site work, Riverside Park and West 76th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of anaerobic digester tanks and adjacent site work, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue and Barretto Street, Bronx |
Bronx |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of an educational compost facility and adjacent site work, Queens Botanical Garden, 43-50 Main Street, Flushing, Queens |
Queens |
DCLA |
|
Withdrawn |
|
Agenda
Minutes
|
| Construction of an interim parking lot and installation of a trailer, 17 Bristol Street, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of an upland park, including a playground and a prototypical comfort station, as Phase 1B of the reconstruction of Pier 42, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a parking lot, Building 72, Market Street between Dry Docks 2 and 3, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a parking lot, perimeter wall and fencing and adjacent site work as Phase I of the of the construction of an NYPD vehicle impound facility, Rockaway Boulevard, Guy Brewer Boulevard, Farmers Boulevard, JFK International Airport, Queens |
Queens |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a playground and a prototypical comfort station as Phase 1B of the reconstruction of Pier 42, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a playground, Battery Park, State Street, Minuit Plaza, and South Street, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a prototypical comfort station as Phase II of the reconstruction of Fox Playground, Fox Street, 156th Street and Southern Boulevard, Bronx |
Bronx |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, as Phase II of the reconstruction of Highbridge Park, Edgecombe Avenue, West 163rd to West 168th Street, and West 175th Street to West 176th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Construction of a prototypical comfort station, as Phase II of the reconstruction of Highbridge Park, Edgecombe Avenue, West 163rd to West 168th Street, and West 175th Street to West 176th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Construction of a prototypical planted raised median, Phase I, 4th Avenue from 8th Street to 64th Street, Brooklyn |
Brooklyn |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a prototypical planted raised median, Phase I, 4th Avenue from 8th Street to 64th Street, Brooklyn |
Brooklyn |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Construction of a reading garden, Mapleton Branch Library, 1702 60th Street, Brooklyn |
Brooklyn |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of a water quality monitoring station, Shaft 3A, 903 East 233rd Street, Bronx |
Bronx |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of a water quality monitoring station, Shaft 7, Sedgwick Avenue, and West 167th Street, Bronx |
Bronx |
DEP |
|
Commented |
|
Agenda
Minutes
|
| Construction of Building 1A and 1B, as Phase I of a master plan for the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work as part of The Peninsula, Tiffany Street, Spofford Avenue, and Manida Street, Bronx |
Bronx |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of Cary Leeds Tennis Center, including a clubhouse, Crotona Park, Crotona Park South, Crotona Park East, Crotona Park North and Fulton Avenue, Bronx |
Bronx |
DPR |
|
Withdrawn |
|
Agenda
Minutes
|
| Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of retaining walls and adjacent site work, 346 43rd Street, Brooklyn |
Brooklyn |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Construction of retaining walls and adjacent site work, 346 43rd Street, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of service area, including an alternative fueling station, a retail facility and a truck maintenance building, Hunts Point, Food Centre Drive and Halleck Street, Bronx |
Bronx |
EDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of the 116th Police Precinct, North Conduit Avenue and 244th Street, Rosedale, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of the NYPD training facility, Phase I, College Point Boulevard, 28th Avenue, Ulmer Street, College Point Corporate Park, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of two plazas, 37th Road, 73rd Street and Broadway, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Construction of two residential buildings (Buildings 2 and 3) as part of the rehabilitation of the Bedford Union Armory, 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Construction of two residential buildings (Buildings 2 and 3) as part of the rehabilitation of the Bedford Union Armory, 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Design of a prototypical comfort station for use citywide as part of the Community Parks Initiative |
Citywide |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Design of a prototypical gate to accommodate citywide ferry service at existing barge and gangway locations for installation citywide |
Citywide |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Design of a prototypical gate to accommodate citywide ferry service at existing barge and gangway locations for installation citywide |
Citywide |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Design of prototypical building identification signage for installation citywide |
Citywide |
DOHMH |
|
Approved with conditions |
|
Agenda
Minutes
|
| Design of prototypical building identification signage for installation citywide |
Citywide |
DOHMH |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of a distinctive sidewalk, Chanel, 15 East 57th Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a distinctive sidewalk, Chanel, 15 East 57th Street, Manhattan |
Manhattan |
DOT |
|
Approved |
|
Agenda
Minutes
|
| Installation of a door and transom, British International School, 20 Waterside Plaza, Manhattan |
Manhattan |
HPD |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a door and transom, British International School, 20 Waterside Plaza, Manhattan |
Manhattan |
HPD |
|
Approved |
|
Agenda
Minutes
|
| Installation of a mural, Building 72, Market Street between Dry Docks 2 and 3, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
Brooklyn |
BNYDC |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of a mural, Building 72, Market Street between Dry Docks 2 and 3, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
Brooklyn |
BNYDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of a pavilion and adjacent site work, Queens Botanical Garden, 43-50 Main Street, Flushing, Queens |
Queens |
DCLA |
|
Withdrawn |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 1879 Broadway, southwest corner of Broadway and West 62nd Street, Manhattan |
Manhattan |
DCA |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 1879 Broadway, southwest corner of Broadway and West 62nd Street, Manhattan |
Manhattan |
DCA |
|
Rejected |
|
Agenda
Minutes
|
| Installation of a prototypical newsstand, 230 Varick Street, southeast corner of Varick Street and Carmine Street, Manhattan |
Manhattan |
DCA |
|
Commented |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, M.S. 45 Thomas C. Giordano School, 2502 Lorillard Place, Bronx |
Bronx |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, M.S. 45 Thomas C. Giordano School, 2502 Lorillard Place, Bronx |
Bronx |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S./I.S. 384 Frances E. Carter School, 242 Cooper Street, Brooklyn |
Brooklyn |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of a sealcoat soccer field, P.S./I.S. 384 Frances E. Carter School, 242 Cooper Street, Brooklyn |
Brooklyn |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sidewalk and access hatches, Manhattan Center for Science and Mathematics, 260 Pleasant Avenue, Manhattan |
Manhattan |
DOE |
|
Commented |
|
Agenda
Minutes
|
| Installation of a soccer sealcoat field, Playground 62, adjacent to P.S. 220, 62nd Road and 108th Street, Corona, Queens |
Queens |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a soccer sealcoat field, Playground 62, adjacent to P.S. 220, 62nd Road and 108th Street, Corona, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of a stair and condenser unit, Queens Borough Hall, 120-55 Queens Boulevard, Queens |
Queens |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of doors, Department of Sanitation garage, Manhattan 3, 270 South Street, Manhattan |
Manhattan |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of doors, Department of Sanitation garage, Manhattan 3, 270 South Street, Manhattan |
Manhattan |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of doors, Department of Sanitation garage, Queens 7 Annex, 120-15 31st Avenue, Flushing, Queens |
Queens |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of doors, Department of Sanitation garage, Queens 7 Annex, 120-15 31st Avenue, Flushing, Queens |
Queens |
DDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of interim trailers, Horizon Juvenile Center, 560 Brook Avenue, Bronx |
Bronx |
DDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of interim trailers, Horizon Juvenile Center, 560 Brook Avenue, Bronx |
Bronx |
DDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of planters, Flatbush Avenue between Pacific Street and St. Johns Place, Brooklyn |
Brooklyn |
DOT |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of planters, Flatbush Avenue between Pacific Street and St. Johns Place, Brooklyn |
Brooklyn |
DOT |
Final |
|
|
Agenda
Minutes
|
| Installation of prototypical signage, Brownsville Health Center, 259 Bristol Street, Brooklyn |
Brooklyn |
DOHMH |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of prototypical signage, Brownsville Health Center, 259 Bristol Street, Brooklyn |
Brooklyn |
DOHMH |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of prototypical signage, East Harlem Health Center, 158 East 115th Street, Manhattan |
Manhattan |
DOHMH |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of prototypical signage, East Harlem Health Center, 158 East 115th Street, Manhattan |
Manhattan |
DOHMH |
|
Approved with conditions |
|
Agenda
Minutes
|
| Installation of prototypical signage, Tremont Health Center, 1826 Arthur Avenue, Bronx |
Bronx |
DOHMH |
|
Approved |
|
Agenda
Minutes
|
| Installation of prototypical signage, Tremont Health Center, 1826 Arthur Avenue, Bronx |
Bronx |
DOHMH |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of rooftop equipment, Engine Company 329, 402 Beach 169th Street, Queens |
Queens |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop HVAC equipment, 3 United Nations Plaza, East 44th Street and First Avenue, Manhattan |
Manhattan |
HPD |
|
Withdrawn |
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment and louvers, Reptile Wing, Staten Island Zoo, 614 Broadway, Staten Island |
Staten Island |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Engine Company 24, 227 Sixth Avenue, Manhattan |
Manhattan |
FDNY |
|
Approved |
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Engine Company 24, 227 Sixth Avenue, Manhattan |
Manhattan |
FDNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Repairs and Transportation (R & T) Building, 48-34 35th Street, Long Island City, Queens |
Queens |
FDNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Repairs and Transportation (R & T) Building, 48-34 35th Street, Long Island City, Queens |
Queens |
FDNY |
|
Approved |
|
Agenda
Minutes
|
| Installation of rooftop photovoltaic panels, electrical cabinets, and adjacent site work, 1150 Commerce Avenue, Bronx |
Bronx |
DCAS |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop photovoltaic panels, electrical cabinets, and adjacent site work, 1150 Commerce Avenue, Bronx |
Bronx |
DCAS |
|
Approved |
|
Agenda
Minutes
|
| Installation of signage and doors (McDonald’s), 395 Flatbush Avenue Extension between Fulton Street and Dekalb Avenue, Brooklyn |
Brooklyn |
HPD |
|
Found incomplete |
|
Agenda
Minutes
|
| Installation of signage and wayfinding, Building 72, Market Street between Dry Docks 2 and 3, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
|
Commented |
|
Agenda
Minutes
|
| Installation of signage (New Balance), Citi Field, 120-01 Roosevelt Avenue, Corona, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Installation of signage (New Balance), Citi Field, 120-01 Roosevelt Avenue, Corona, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Installation of signage, Verizon Executive Education Center and Graduate Hotel, as part of Phase I of the construction of Cornell University/Cornell Tech campus, Roosevelt Island, Manhattan |
Manhattan |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Installation of signage, Verizon Executive Education Center and Graduate Hotel, as part of Phase I of the construction of Cornell University/Cornell Tech campus, Roosevelt Island, Manhattan |
Manhattan |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of two distance markers, Astoria Park, Astoria, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Installation of two sealcoat soccer fields, I.S. 72 Police Officer Rocco Laurie School, 33 Ferndale Avenue, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of two sealcoat soccer fields, I.S. 72 Police Officer Rocco Laurie School, 33 Ferndale Avenue, Staten Island |
Staten Island |
DOE |
|
Approved |
|
Agenda
Minutes
|
| Installation of windows, louvers, and mechanical equipment, Emergency Medical Station 20 (EMS 20), 1400 Pelham Parkway South, Bronx |
Bronx |
FDNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of windows, louvers, and mechanical equipment, Emergency Medical Station 20 (EMS 20), 1400 Pelham Parkway South, Bronx |
Bronx |
FDNY |
|
Approved |
|
Agenda
Minutes
|
| Installation of Writings at Helin Temple by Xu Bing, Forsyth Plaza, Canal Street, Forsyth Street, and the Manhattan Bridge approach ramp, Manhattan |
Manhattan |
DCLA% |
Final |
|
|
Agenda
Minutes
|
| Installation of Writings at Helin Temple by Xu Bing, Forsyth Plaza, Canal Street, Forsyth Street, and the Manhattan Bridge approach ramp, Manhattan |
Manhattan |
DCLA% |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of a DOT municipal parking garage, 105-113 Essex Street and 112-120 Ludlow Street between Delancey Street and Rivington Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of a marine transfer station, East 91st Street Station, FDR Drive and East 91st Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of an addition, Engine Company 292 and Rescue Company 4, 64-18 Queens Boulevard, Woodside, Queens |
Queens |
FDNY |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of an addition, Engine Company 292 and Rescue Company 4, 64-18 Queens Boulevard, Woodside, Queens |
Queens |
FDNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of an athletic field, construction of an entry plaza, and adjacent site work, Frank Golden Park, 132nd Street between 14th Avenue and 20th Avenue, College Point, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of an athletic field, construction of an entry plaza, and adjacent site work, Frank Golden Park, 132nd Street between 14th Avenue and 20th Avenue, College Point, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Bartlett Playground, Bartlett Street, Throop Avenue, Whipple Street, and Flushing Avenue, Brooklyn |
Brooklyn |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Bartlett Playground, Bartlett Street, Throop Avenue, Whipple Street, and Flushing Avenue, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Bill Bojangles Robinson Playground, West 150th Street and Seventh Avenue, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Bill Bojangles Robinson Playground, West 150th Street and Seventh Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Chappetto Square, 24th Drive, 23rd Street, Hoyt Avenue North, and 21st Street, Astoria, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Chappetto Square, 24th Drive, 23rd Street, Hoyt Avenue North, and 21st Street, Astoria, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Joseph Sauer Park, 12th Street between Avenue A and Avenue B, Manhattan |
Manhattan |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Kossuth Playground, Mosholu Parkway North, Jerome Avenue, and Van Cortlandt Avenue, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Kossuth Playground, Mosholu Parkway North, Jerome Avenue, and Van Cortlandt Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Louis Simeone Park, Radcliff Avenue, Strong Avenue and Lewis Avenue, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of Mariners Harbor Playground, Harbor Road between Richmond Terrace and Leyden Avenue, Staten Island |
Staten Island |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Mariners Harbor Playground, Harbor Road between Richmond Terrace and Leyden Avenue, Staten Island |
Staten Island |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Mauro Playground, Park Drive East and 73rd Terrace, Flushing, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of Mauro Playground, Park Drive East and 73rd Terrace, Flushing, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Prescott Playground, adjacent to I.S. 7, Edith Avenue and Irvington Street, Staten Island |
Staten Island |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of stairs and paths, Joan of Arc Island, Riverside Park, between West 91st Street and West 95th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of stairs and paths, Joan of Arc Island, Riverside Park, between West 91st Street and West 95th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the Children's Playground, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the Children's Playground, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the East 96th Street Playground, Central Park, Fifth Avenue and East 96th Street, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the East 96th Street Playground, Central Park, Fifth Avenue and East 96th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the tot lot, Travers Park, 34th Avenue between 77th Street and 78th Street, Jackson Heights, Queens |
Queens |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of the tot lot, Travers Park, 34th Avenue between 77th Street and 78th Street, Jackson Heights, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the World's Fair Marina, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
|
Commented |
|
Agenda
Minutes
|
| Reconstruction of two Route 28A bridges over Esopus Creek and the former Ulster and Delaware Railroad corridor, Olive, Ulster County |
Upstate |
DEP |
|
Approved |
|
Agenda
Minutes
|
| Reconstruction of two Route 28A bridges over Esopus Creek and the former Ulster and Delaware Railroad corridor, Olive, Ulster County |
Upstate |
DEP |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of 518 West 161st Street, Manhattan |
Manhattan |
HPD |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of 544 West 163rd Street, Manhattan |
Manhattan |
HPD |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of 9 Fort Washington Avenue, Manhattan |
Manhattan |
HPD |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of a building and construction of an addition, Melrose Branch Library, New York Public Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of a building and construction of an addition, Melrose Branch Library, New York Public Library, 910 Morris Avenue, Bronx |
Bronx |
NYPL |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann's Avenue at East 145th Street, Bronx |
Bronx |
DPR |
Final |
|
|
Agenda
Minutes
|
| Rehabilitation of a comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann's Avenue at East 145th Street, Bronx |
Bronx |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of Emergency Medical Services 4 (EMS 4), including the installation of an emergency generator, 270 South Street, Pier 36, Manhattan |
Manhattan |
FDNY |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the Bedford Union Armory (Building 1), 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
|
Approved with conditions |
|
Agenda
Minutes
|
| Rehabilitation of the Bedford Union Armory (Building 1), 1555 Bedford Avenue, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Rehabilitation of the East New York Industrial Building, 191-201 Powell Street, Brooklyn |
Brooklyn |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of the East New York Industrial Building, 191-201 Powell Street, Brooklyn |
Brooklyn |
EDC |
|
Approved |
|
Agenda
Minutes
|
| Rehabilitation of the façade and reconstruction of an entrance, Epiphany Branch Library, 228 East 23rd Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Rehabilitation of the rooftop penthouse and installation rooftop mechanical equipment, 67th Street Library, 328 East 67th Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Relocation of six bas reliefs from 280 Cadman Plaza West to Walt Whitman Library, 93 St. Edwards Street, Brooklyn |
Brooklyn |
BPL |
|
Found incomplete |
|
Agenda
Minutes
|
| Renovation of a playground (Safari Playground), Central Park between West 91st Street, West 92nd Street, Park Drive, and Central Park West, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Renovation of a playground (Safari Playground), Central Park between West 91st Street, West 92nd Street, Park Drive, and Central Park West, Manhattan |
Manhattan |
DPR |
|
Approved |
|
Agenda
Minutes
|
| Renovation of Hamilton Fish Park Branch Library, 415 East Houston Street, Manhattan |
Manhattan |
DDC |
|
Commented |
|
Agenda
Minutes
|
| Under the El - Lighting/Neighborhood Tech Innovation Lab |
Citywide |
DOT |
|
Commented |
|
Agenda
Minutes
|