| Rehabilitation of a facade and installation of guardrails, Bellevue Men’s Shelter, 400 East 30th Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
|
Commented |
2019-02-19 |
| Design of electric vehicle charging stations for installation citywide |
Citywide |
DOT |
Street furniture |
Preliminary |
Commented |
2019-02-19 |
| Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary |
Commented |
2019-02-19 |
| Installation of signage, East Flatbush Library, 9612 Church Avenue, Brooklyn |
Brooklyn |
BPL |
Signage |
|
Commented |
2019-02-19 |
| Construction of the Tilden Community Center and adjacent site work, Tilden Playground, 4802 Tilden Avenue at East 48th Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
|
Commented |
2019-02-19 |
| Reconstruction of Harper Street Yard, including the construction of a diesel monitoring booth, diesel pump station, and electrical building and the relocation of a gatehouse, 30-01 and 32-11 Harper Street, Queens |
Queens |
DDC |
Architecture |
|
Commented |
2019-02-19 |
| Installation of signage, Hunter’s Point South Waterfront Park, Center Boulevard and the East River, between 50th Avenue and 57th Avenue, Long Island City, Queens |
Queens |
EDC |
Signage |
|
Withdrawn |
2019-02-19 |
| Reconstruction of the Rugby Branch of the Brooklyn Public Library, 100 Utica Avenue, Brooklyn |
Brooklyn |
DDC |
Architecture |
|
Commented |
2019-02-19 |
| Reconstruction of a portion of Brookville Park, Brookville Boulevard, 147th Avenue, 232nd Street and the Belt Parkway, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2019-02-19 |
| Reconstruction of Sumner Playground, adjacent to P.S. 59, Throop Avenue between Park Avenue and Myrtle Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2019-02-19 |
| Staten Island Bluebelt Program |
Staten Island |
DEP |
Landscape architecture |
|
Commented |
2019-02-19 |
| Design of shade structures, Rockaway Beach, Beach 59th Street Playground, Beach 98th Street Playground, and Shore Front Parkway between Beach 77th Street and Beach 81st Street and between Beach 101st Street and Beach 102nd Street, Arverne and Rockaway Park, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2019-02-19 |
| Installation of courtyard lighting, Museum of the Moving Image, North 35th Avenue at 36th Street, Astoria, Queens |
Queens |
DCLA |
Landscape architecture |
|
Commented |
2019-02-19 |
| Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2019-02-19 |
| Installation of interim flood protection measures, Astoria Houses, 4-21 Astoria Boulevard, Astoria, Queens |
Queens |
DPR |
Street furniture |
|
Commented |
2019-02-19 |
| Installation of distinctive lighting, World's Fair lightpoles, Phase I, Jamaica Avenue from Forest Parkway to 98th Street, Jamaica, Queens |
Queens |
DOT |
Distinctive lighting |
|
Commented |
2019-02-19 |
| Reconstruction of the Gilboa Dam and adjacent site work, Schoharie Reservoir, adjacent to Route 990V, Gilboa, Schoharie County |
Upstate |
DEP |
Signage |
|
Commented |
2019-02-19 |
| Construction of a freight rail platform, Hunts Point Terminal Produce Market, 101 Food Center Drive, Bronx |
Bronx |
EDC |
Architecture |
Final |
Commented |
2019-02-19 |
| Renovation of Buildings A and C (Made in NY-North), Bush Terminal Industrial Campus, 13 42nd Street and One 43rd Street, Brooklyn |
Brooklyn |
EDC |
Architecture |
Preliminary |
Approved with conditions |
2019-02-19 |
| Installation of rooftop guardrails, Bronx Districts 7 and 8 Garage, 423 West 215th Street, Manhattan |
Manhattan |
DSNY |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-02-19 |
| Restoration of landscape, including tree plantings, Shore Belt Parkway over Mill Basin, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-02-19 |
| Construction of a section of Hudson Park and Boulevard, Phase IIA, 10th Avenue and 11th Avenue from 36th Street to 37th Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Installation of Prism Arbor by Xenobia Bailey, Parachute Way Plaza between Surf Avenue and the Riegelmann Boardwalk, Brooklyn |
Brooklyn |
DCLA% |
Artwork |
Preliminary |
Approved |
2019-01-22 |
| Construction of Parachute Way Plaza, including the installation of an artwork by Xenobia Bailey and the relocation of the Jackie Robinson and Pee Wee Reese Memorial (2005) by William Behrends, between Surf Avenue and the boardwalk, as part of the Coney Island Infrastructure Project, Brooklyn |
Brooklyn |
DCLA% |
Landscape architecture |
Final |
Approved with conditions |
2019-01-22 |
| Construction of Site B as part of reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn |
Brooklyn |
EDC |
Architecture |
Preliminary |
Approved |
2019-01-22 |
| Reconstruction of baseball fields 2 and 3 and adjacent site work, the Long Meadow and the Upper Pool, Prospect Park West and Prospect Park Southwest, Prospect Park, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-01-22 |
| Reconstruction of a pedestrian path and ADA improvements, Carl Schurz Park, East End Avenue between East 84th Street and East 86th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2019-01-22 |
| Construction of an ADA ramp, East 82nd Street and John Finley Walk, Manhattan |
Manhattan |
DPR |
Building systems & Modifications |
Preliminary |
Approved |
2019-01-22 |
| Reconstruction of column foundations (Summer Stage) Rumsey Playfield, 72nd Street and East Drive, Central Park, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Reconstruction of track 1, soccer fields 3, 4 & 5, and ballfields 1-4 as Phase III of the reconstruction of the Red Hook Recreation Area, Columbia Street and Bay Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Reconstruction of Ravenswood Playground, 35th Avenue, 21st Street, and 34th Avenue, Astoria, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Reconstruction of Harlem Lane Park and Frederick Johnson Park, Adam Clayton Powell Jr. Boulevard, West 150th Street, and Harlem River Drive, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Construction of a dog run, Devoe Park, Sedgwick Avenue and West Fordham Road, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Conservation of the Dover Patrol Monument, John Paul Jones Park, Fourth Avenue and 101st Street, Brooklyn |
Brooklyn |
DPR |
Artwork |
Final |
Approved |
2019-01-22 |
| Conservation and Relocation of the Highbridge Doughboy (1923) from the triangle park between Boscobel Place, Ogden, and Boscobel Avenues to Macombs Dam Park, Jerome Avenue and 161st Street, Bronx |
Bronx |
DPR |
Artwork |
Final |
Approved |
2019-01-22 |
| Rehabilitation of a comfort station, Prall Playground, Elizabeth Street, Forest Avenue, Clove Lake Place, and Broadway, Staten Island |
Staten Island |
DPR |
Architecture |
Preliminary |
Approved |
2019-01-22 |
| Reconstruction of the playground, White Park, Lyman Avenue, Summer Street, High Street, and Bay Street, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-01-22 |
| Construction of athletic courts and an adult fitness area, Hallets Cove Playground, Vernon Boulevard between Welling Court and 30th Road, Astoria, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-01-22 |
| Construction of an ADA ramp and stairs, 37 West 93rd Street, Manhattan |
Manhattan |
DOT |
Building systems & Modifications |
Final |
Approved |
2019-01-22 |
| Construction of anaerobic digester tanks, a pumping station, and adjacent site work, Hunts Point Water Pollution Control Plant, Viele Avenue, Manida Street, Ryawa Avenue, and Barretto Street, Bronx |
Bronx |
DEP |
Architecture |
Preliminary |
Approved with conditions |
2019-01-22 |
| Installation of streetscape improvements, Beach 108th Street between Beach Channel Drive and Shore Front Parkway, Rockaway Park, Queens |
Queens |
DDC |
Landscape architecture |
Preliminary |
Approved |
2019-01-22 |
| Reconstruction of a plaza and adjacent site work, Queens Borough Hall, 120-55 Queens Boulevard, Kew Gardens, Queens |
Queens |
DDC |
Landscape architecture |
Final |
Approved |
2019-01-22 |
| Rehabilitation of the pier over John Finley Walk, Brearley School, 610 East 83rd Street, Manhattan |
Manhattan |
DCAS |
Building systems & Modifications |
Preliminary |
Approved with conditions |
2019-01-22 |
| Installation of a prototypical newsstand, 303 East 83rd Street, northeast corner of Second Avenue and East 83rd Street, Manhattan |
Manhattan |
DCA |
Newsstand |
Preliminary and Final |
Approved |
2019-01-22 |
| Design of a tenant signage system, Admiral's Row Plaza, Navy Street, Flushing Avenue, Fourth Street, and Gate Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Signage |
Preliminary and Final |
Approved |
2019-01-22 |
| Installation of a roof, Richmondtown Library, 200 Clarke Avenue, Staten Island |
Staten Island |
DDC |
Building systems & Modifications |
|
Commented |
2019-01-22 |
| Installation of a prototypical newsstand, 423 9th Avenue, southwest corner of West 34th Street and 9th Avenue, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2019-01-22 |
| Installation of a prototypical newsstand, 2802 Jackson Avenue, southeast corner of Jackson Avenue and Orchard Street, Long Island City, Queens |
Queens |
DCA |
Newsstand |
|
Withdrawn |
2019-01-22 |
| Installation of a Hollis neighborhood identification sign, Gladys Warren Triangle, Hollis Avenue, 104th Avenue, and 194th Street, St. Albans, Queens |
Queens |
DPR |
Signage |
|
Commented |
2019-01-22 |
| Reconstruction of steps and construction of an ADA ramp, Our Lady of Lourdes Church, 128 Cedar Grove Avenue, Great Kills Park, Staten Island |
Staten Island |
DDC |
Landscape architecture |
|
Commented |
2019-01-22 |