| Reconstruction of a ballfield (Ballfield 3) and related site work, McCarren Park, Bedford Avenue, Lorimer Avenue, Driggs Avenue, and North 12th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-03-18 |
| Construction of the northern portion of Success Garden, Livonia Avenue between Alabama Street and Williams Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-03-18 |
| Installation of a prototypical newsstand, 1439 Metropolitan Avenue between Wood Avenue and Yankee Mall, Bronx |
Bronx |
DCA |
Newsstand |
|
Commented |
2019-03-18 |
| Installation of interim flood protection measures, Rockaway Water Pollution Control Plant, Beach Channel Drive between Beach 104th Street and Beach 108th Street, Rockaway Park, Queens |
Queens |
EM |
Landscape architecture |
|
Commented |
2019-03-18 |
| Construction of an adult fitness area, St. John's Park, Troy Avenue, Prospect Place, Schenectady Avenue and Bergen Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2019-03-18 |
| Rehabilitation of the Eltingville Pumping Station (formerly Brookfield Landfill), Arthur Kill Road and Brookfield Avenue, Staten Island |
Staten Island |
DEP |
Architecture |
Preliminary |
Approved with conditions |
2019-03-18 |
| Installation of a prototypical newsstand, 1335 6th Avenue, southwest corner of 6th Avenue and West 54th Street, Manhattan |
Manhattan |
DCA |
Newsstand |
Preliminary and Final |
Commented |
2019-03-18 |
| Installation of flood protection measures as part of the DEP Wastewater Resiliency Program, Bowery Bay Wastewater Treatment Plant, 43-01 Berrain Boulevard, Queens |
Queens |
DEP |
Landscape architecture |
Preliminary and Final |
Approved with conditions |
2019-03-18 |
| Rehabilitation of a comfort station, Captain George H. Tilly Memorial Park Playground, 85th Avenue between 165th Street and Chapin Parkway, Jamaica, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved with conditions |
2019-03-18 |
| Reconstruction of the coastline (East Side Coastal Resiliency) and East River Park, East River between Montgomery Street and East 25th Street, Manhattan |
Manhattan |
DDC |
Landscape architecture |
|
Commented |
2019-03-18 |
| Construction of Myrtle Wyckoff Plaza, Wyckoff Avenue between Gates Avenue and Myrtle Avenue, Brooklyn and Queens |
Brooklyn/Queens |
DDC |
Landscape architecture |
Preliminary and Final |
Approved with conditions |
2019-03-18 |
| Installation of interpretive signage for an educational compost facility, Queens Botanical Garden, 43-50 Main Street, Flushing, Queens |
Queens |
DCLA |
Signage |
Preliminary and Final |
Approved |
2019-03-18 |
| Construction of streetscape improvements, Parsons Boulevard between Jamaica Avenue and Archer Avenue, Jamaica Queens |
Queens |
DDC |
Landscape architecture |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of coping and a rooftop fence, Clason's Point Branch Library, 1215 Morrison Avenue, Bronx |
Bronx |
DDC |
Building systems & Modifications |
|
Commented |
2019-03-18 |
| Reconstruction of Bridge Playground, Undercliff Avenue, Boscobel Place, and University Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
Approved |
2019-03-18 |
| Installation of a prototypical newsstand, 1396 Second Avenue, northeast corner of Second Avenue and East 72nd Street, Manhattan |
Manhattan |
DCA |
Newsstand |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of an artwork by Stacy Levy, East Midtown Greenway, East River between East 53rd Street and East 61st Street, Manhattan |
Manhattan |
EDC |
Artwork |
Conceptual |
Approved |
2019-03-18 |
| Installation of a prototypical newsstand, 1180 2nd Avenue, northeast corner of 2nd Avenue and East 62nd Street, Manhattan |
Manhattan |
DCA |
Newsstand |
Preliminary and Final |
Commented |
2019-03-18 |
| Installation of a prototypical newsstand, 3100 47th Avenue, southeast corner of 47th Avenue and 31st Street, Long Island City, Queens |
Queens |
DCA |
Newsstand |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of a prototypical newsstand, 660 Columbus Avenue, northwest corner of Columbus Avenue and West 92nd Street, Manhattan |
Manhattan |
DCA |
Newsstand |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of interim flood protection measures, Reed Street between Conover Street and Van Brunt Street, Beard Street between Van Brunt Street and Dwight Street, Brooklyn |
Brooklyn |
EM |
Landscape architecture |
|
Commented |
2019-03-18 |
| Installation of prefabricated locker room trailers, 16-24 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Architecture |
Preliminary and Final |
Approved |
2019-02-19 |
| Installation of rooftop guardrails, Bronx Districts 7 and 8 Garage, 423 West 215th Street, Manhattan |
Manhattan |
DSNY |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-02-19 |
| Installation of two HVAC units and a louver, New York City Center for Aerospace and Applied Mathematics, 220 Henry Street, Manhattan |
Manhattan |
DOE |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-02-19 |
| Installation of interim flood protection measures, Astoria Houses, 4-21 Astoria Boulevard, Astoria, Queens |
Queens |
DPR |
Street furniture |
|
Commented |
2019-02-19 |
| Design of electric vehicle charging stations for installation citywide |
Citywide |
DOT |
Street furniture |
Preliminary |
Commented |
2019-02-19 |
| Reconstruction of Queens Boulevard from Roosevelt Avenue to 73rd Street, as Phase I of the reconstruction of Queens Boulevard from Roosevelt Avenue to Union Turnpike, Queens |
Queens |
DDC |
Landscape architecture |
Preliminary |
Commented |
2019-02-19 |
| Construction of a freight rail platform, Hunts Point Terminal Produce Market, 101 Food Center Drive, Bronx |
Bronx |
EDC |
Architecture |
Final |
Commented |
2019-02-19 |
| Reconstruction of athletic courts and installation of an artificial turf field, Space Time Playground, adjacent to I.S. 131 Albert Einstein Jr. High School, Lafayette Avenue between Underhill Avenue and Bolton Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-02-19 |
| Renovation of Buildings A and C (Made in NY-North), Bush Terminal Industrial Campus, 13 42nd Street and One 43rd Street, Brooklyn |
Brooklyn |
EDC |
Architecture |
Preliminary |
Approved with conditions |
2019-02-19 |
| Installation of distinctive lighting, World's Fair lightpoles, Phase I, Jamaica Avenue from Forest Parkway to 98th Street, Jamaica, Queens |
Queens |
DOT |
Distinctive lighting |
|
Commented |
2019-02-19 |
| Installation of Dr. Sun Yat-sen (2011) by Lu Chun-Hsiung, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Artwork |
Conceptual |
Approved with conditions |
2019-02-19 |
| Installation of World's Fair light poles, Phase IB, Jamaica Avenue from 98th Street to 108th Street, Jamaica, Queens |
Queens |
DOT |
Distinctive lighting |
Preliminary and Final |
Approved with conditions |
2019-02-19 |
| Installation of exhaust equipment, North Infirmary Center, 15-00 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-02-19 |
| Construction of the Tilden Community Center and adjacent site work, Tilden Playground, 4802 Tilden Avenue at East 48th Street, Brooklyn |
Brooklyn |
DPR |
Architecture |
|
Commented |
2019-02-19 |
| Staten Island Bluebelt Program |
Staten Island |
DEP |
Landscape architecture |
|
Commented |
2019-02-19 |
| Reconstruction of Sumner Playground, adjacent to P.S. 59, Throop Avenue between Park Avenue and Myrtle Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2019-02-19 |
| Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary |
Commented |
2019-02-19 |
| Reconstruction of a portion of Brookville Park, Brookville Boulevard, 147th Avenue, 232nd Street and the Belt Parkway, Queens |
Queens |
DPR |
Landscape architecture |
|
Commented |
2019-02-19 |
| Installation of signage, Hunter’s Point South Waterfront Park, Center Boulevard and the East River, between 50th Avenue and 57th Avenue, Long Island City, Queens |
Queens |
EDC |
Signage |
|
Withdrawn |
2019-02-19 |
| Reconstruction of Harper Street Yard, including the construction of a diesel monitoring booth, diesel pump station, and electrical building and the relocation of a gatehouse, 30-01 and 32-11 Harper Street, Queens |
Queens |
DDC |
Architecture |
|
Commented |
2019-02-19 |
| Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2019-02-19 |
| Reconstruction of the Rugby Branch of the Brooklyn Public Library, 100 Utica Avenue, Brooklyn |
Brooklyn |
DDC |
Architecture |
|
Commented |
2019-02-19 |
| Reconstruction of the Gilboa Dam and adjacent site work, Schoharie Reservoir, adjacent to Route 990V, Gilboa, Schoharie County |
Upstate |
DEP |
Signage |
|
Commented |
2019-02-19 |
| Installation of courtyard lighting, Museum of the Moving Image, North 35th Avenue at 36th Street, Astoria, Queens |
Queens |
DCLA |
Landscape architecture |
|
Commented |
2019-02-19 |
| Design of shade structures, Rockaway Beach, Beach 59th Street Playground, Beach 98th Street Playground, and Shore Front Parkway between Beach 77th Street and Beach 81st Street and between Beach 101st Street and Beach 102nd Street, Arverne and Rockaway Park, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2019-02-19 |
| Installation of prefabricated office trailers, George Motchan Detention Center Sites A, B, and C, 10 West 4th Street, 680 Mandincini Road, and 2 West 5th Street, Rikers Island, Bronx |
Bronx |
DOC |
Architecture |
Preliminary and Final |
Approved |
2019-02-19 |
| Installation of signage, East Flatbush Library, 9612 Church Avenue, Brooklyn |
Brooklyn |
BPL |
Signage |
|
Commented |
2019-02-19 |
| Rehabilitation of a facade and installation of guardrails, Bellevue Men’s Shelter, 400 East 30th Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
|
Commented |
2019-02-19 |
| Rehabilitation of the Bushwick Health Center, 335 Central Avenue, Brooklyn |
Brooklyn |
DDC |
Architecture |
Final |
Approved |
2019-02-19 |