| Installation of Dr. Sun Yat-sen (2011) by Lu Chun-Hsiung, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
Approved with conditions |
2019-04-15 |
| Construction of an addition, Bronx High School of Science, 75 West 205th Street, Bronx |
Bronx |
DOE |
Architecture |
Preliminary and Final |
Approved |
2019-04-15 |
| Reconstruction of a distinctive sidewalk, MetLife Building (PanAm Building), 200 Park Avenue, Manhattan |
Manhattan |
DOT |
Distinctive sidewalk |
|
Commented |
2019-04-15 |
| Reconstruction of a pedestal, William Henry Seward (1876) by Randolph Rogers, Madison Square Park, Fifth Avenue and East 23rd Street, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
Approved with conditions |
2019-04-15 |
| Reconstruction of the Hannah Street Pumping Station, including the construction of an electrical building and a Con Edison meter building, 10 Murray Hulbert Avenue, Staten Island |
Staten Island |
DEP |
Architecture |
|
Commented |
2019-04-15 |
| Installation of a prototypical newsstand, 460 Park Avenue, northwest corner of East 57th Street and Park Avenue, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2019-04-15 |
| Reconstruction of a portion of Bellevue South Park, Mount Carmel Place between East 26th Street and East 28th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-04-15 |
| Installation of a prototypical newsstand, 655 Fifth Avenue, northeast corner of Fifth Avenue and East 52nd Street, Manhattan |
Manhattan |
DCA |
Newsstand |
|
Commented |
2019-04-15 |
| Reconstruction of Lion's Pride Playground, Riverdale Avenue between Snediker Avenue and Van Sinderen Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-04-15 |
| Installation of an interim prefabricated classroom and office trailer for the Alley Pond Environmental Center, 76th Avenue between 226th Street and Springfield Boulevard, Alley Pond Park, Oakland Gardens, Queens |
Queens |
DPR |
Architecture |
|
Found Incomplete |
2019-04-15 |
| Rehabilitation of a comfort station, Havemeyer Playground, Watson Avenue, Havemeyer Avenue, and East 177th Street, Bronx |
Bronx |
DPR |
Architecture |
Preliminary |
Approved |
2019-04-15 |
| Installation of benches, Manhattan West, 401 Ninth Avenue, 33rd Street and Ninth Avenue, Manhattan |
Manhattan |
DOT |
Street Furniture |
Preliminary and Final |
Commented |
2019-04-15 |
| Rehabilitation of a comfort station, Marlboro Playground, West 11th Street and Avenue W, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary |
Approved |
2019-04-15 |
| Construction of an ADA ramp, M.S. 72, 133-25 Guy R Brewer Boulevard, Jamaica, Queens |
Queens |
DOE |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-04-15 |
| Installation of rooftop photovoltaic panels, Newcomers High School, 28-01 41st Avenue, Queens |
Queens |
DCAS |
Building systems & Modifications |
|
Commented |
2019-04-15 |
| Removal of a distinctive sidewalk, southwest corner of Third Avenue and 40th Street and northwest corner of Third Avenue and 39th Street, 600 Third Avenue, Manhattan |
Manhattan |
DOT |
Distinctive sidewalk |
|
Withdrawn |
2019-04-15 |
| Construction of a dechlorination facility, Owl's Head Water Pollution Control Plant, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
Architecture |
Preliminary and Final |
Approved |
2019-04-15 |
| Rehabilitation of a comfort station, Quisqueya Playground, Highbridge Park, Amsterdam Avenue and West 180th Street, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary and Final |
Approved |
2019-04-15 |
| Installation of rooftop photovoltaic panels, Peter G. Van Alst School, P.S. 171, 14-14 29th Avenue, Queens |
Queens |
DCAS |
Building systems & Modifications |
|
Commented |
2019-04-15 |
| Installation of signage, P.S. 177, 346 Avenue P, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2019-04-15 |
| Removal of a distinctive sidewalk, southwest corner of Fifth Avenue and 43rd Street, 510 Fifth Avenue, Manhattan |
Manhattan |
DOT |
Distinctive sidewalk |
|
Withdrawn |
2019-04-15 |
| Construction of a mixed-use development, Beach 21st Street, Mott Avenue, and Beach 22nd Street, Far Rockaway, Queens |
Queens |
EDC |
Architecture |
Preliminary |
Commented |
2019-04-15 |
| Installation of a shade pavilion with rooftop photovoltaic panels, La Plaza Cultural de Armando Perez Community Garden, 143 Avenue C, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary and Final |
Approved |
2019-04-15 |
| Construction of a dechlorination facility, Oakwood Beach Water Pollution Control Plant, 751 Mill Road, Staten Island |
Staten Island |
DEP |
Architecture |
Preliminary and Final |
Approved |
2019-04-15 |
| Installation of Urban Poet by Alexandre Arrechea, Atlantic Avenue median between Conduit Boulevard and Fountain Avenue, Brooklyn |
Brooklyn |
DCLA% |
Artwork |
Conceptual |
Approved |
2019-03-18 |
| Reconstruction of the Crossroads and Rail Track Walk, High Line Park (formerly elevated rail line), West 30th Street between 10th Avenue and 11th Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Commented |
2019-03-18 |
| Construction of a field house and adjacent site work (Sportime), One Randall's Island, Manhattan |
Manhattan |
DPR |
Architecture |
|
Commented |
2019-03-18 |
| Installation of the Rebecca Salome Foster Memorial by Karl Bitter, 60 Centre Street, Manhattan |
Manhattan |
DCAS |
Artwork |
Preliminary |
Approved with conditions |
2019-03-18 |
| Installation of an ADA lift, 2416 Lorillard Place, Bronx |
Bronx |
DOT |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of a prototypical neighborhood wayfinding (WalkNYC) sign, Riverside Park, West 97th Street, and Riverside Drive, Manhattan |
Manhattan |
DOT |
Signage |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of a prototypical newsstand, 2220 Broadway, northeast corner of West 79th Street and Broadway, Manhattan |
Manhattan |
DCA |
Newsstand |
Preliminary and Final |
Commented |
2019-03-18 |
| Reconstruction of a portion of Lincoln Terrace Park, East New York Avenue between Rochester Avenue and Buffalo Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-03-18 |
| Construction of the Charleston Branch Library of the New York Public Library and adjacent site work, Tyrellan Avenue and Bricktown Way, Staten Island |
Staten Island |
EDC |
Architecture |
Preliminary |
Commented |
2019-03-18 |
| Construction of an entrance pavilion, elevators, and an observation deck, 1475 Broadway (One Times Square), Manhattan |
Manhattan |
DOT |
Architecture |
|
Commented |
2019-03-18 |
| Installation of a prototypical neighborhood wayfinding (WalkNYC) sign, Riverside Park, Riverside Drive between West 94th Street and West 95th Street, Manhattan |
Manhattan |
DOT |
Signage |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of windows, a door, and mechanical equipment, Owen F. Dolen Golden Age Recreation Center, Owen F. Dolen Park, 2551 Westchester Avenue, Bronx |
Bronx |
DPR |
Building systems & Modifications |
Final |
Approved |
2019-03-18 |
| Installation of signage, P.S. 152, 725 East 23rd Street, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of signage, Brooklyn Science and Engineering Academy, 5404 Tilden Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2019-03-18 |
| Conversion of Building 20 into a light-industrial building, Morris Avenue, Third Street, Dock Avenue, and Fourth Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary |
Commented |
2019-03-18 |
| Construction of plant upgrades, Tallman Island Water Pollution Control Plant, 127th Street and Powell's Cove Boulevard, College Point, Queens |
Queens |
DEP |
Architecture |
|
Commented |
2019-03-18 |
| Installation of a soccer sealcoat field, P.S. 142, Amalia Castro School and Manhattan Charter School, 100 Attorney Street, Manhattan |
Manhattan |
DOE |
Landscape architecture |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of two prefabricated trailers and adjacent site work, Rodman’s Neck, Pelham Bay Park, Bronx |
Bronx |
DOC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of streetscape improvements, Phase I, Diamond District, West 47th Street between Fifth Avenue and Sixth Avenue, Manhattan |
Manhattan |
DOT |
Landscape architecture |
|
Commented |
2019-03-18 |
| Installation of rooftop guardrails, North Infirmary Command Annex, 15-00 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-03-18 |
| Downtown Jamaica Streetscape Vision Plan |
Queens |
DOT |
Landscape architecture |
|
Commented |
2019-03-18 |
| Reconstruction of a memorial, Olde Towne of Flushing Burial Ground (formerly Martins Field), 45th Avenue, 46th Avenue, 164th Street and 166th Street, Queens. |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2019-03-18 |
| Construction of a pavilion café, Blockhouse, East River Waterfront south of John Street under the FDR Drive |
Manhattan |
DPR |
Architecture |
|
Withdrawn |
2019-03-18 |
| Installation of rooftop guardrails, George Motchan Detention Center, 15-15 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-03-18 |
| Installation of rooftop guardrails, Eric M. Taylor Center, 10-10 Hazen Street, Rikers Island, Bronx |
Bronx |
DOC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2019-03-18 |
| Reconstruction of a portion of Anne Loftus Playground, Fort Tryon Park, Dyckman Street and Broadway, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2019-03-18 |