| Reconstruction of a synthetic turf field, adjacent to P.S. 181 (The Brookfield School), 230th Street, 149th Avenue, and 230th Place, Idlewild Park, Springfield Gardens, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2025-08-18 |
| Construction of a screen chamber, downtake shaft vent building, and police booth and reconstruction of the landscape as part of the Kensico-Eastview Connection Project, 19 Westlake Drive, Mount Pleasant, Westchester County |
Upstate |
DEP |
Architecture |
Final |
|
2025-08-18 |
| Conservation of the Bronx Victory Memorial (1930), Pelham Bay Park, south side of Shore Road, Bronx |
Bronx |
DPR |
Artwork |
Preliminary |
|
2025-08-18 |
| Construction of Bridge Park South, including an extension of the Harlem River Greenway, Exterior Street, the High Bridge, the East River, and the Alexander Hamilton Bridge, Bronx |
Bronx |
|
Landscape architecture |
Final |
|
2025-08-18 |
| Reconstruction of the entrance stairs and adjacent site work, Morningside Park, West 114th Street and Morningside Drive, West 116th Street and Morningside Drive, and Wets 122nd Street and Morningside Drive, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
|
2025-08-18 |
| Construction of a public restroom building, Gwen Ifill Park, 129th Avenue, 176th Street, and 133rd Avenue, Jamaica, Queens |
Queens |
DPR |
Architecture |
Final |
|
2025-08-18 |
| Reconstruction of a playground, Corlears Hook Park, Cherry Street, Jackson Street, and FDR Drive, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
|
2025-08-18 |
| Replacement of HVAC equipment, Building 138, 138 General R W Berry Drive, Fort Totten, Bayside, Queens |
Queens |
FDNY |
Building systems & Modifications |
Preliminary and Final |
|
2025-08-05 |
| Replacement of mechanical and electrical equipment, Berth 8, 9, and 10, Dry Docks 5 and 6, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-08-05 |
| Minor modifications to the design of a comfort station for installation citywide |
Citywide |
DPR |
Architecture |
Amended Conceptual |
|
2025-08-05 |
| Replacement of a security booth as part of the construction of an academic building, 28th Street between Seventh Avenue and Eighth Avenue, Fashion Institute of Technology, Manhattan |
Manhattan |
DOE |
Building systems & Modifications |
Amended Final |
|
2025-08-05 |
| Minor modifications to the installation of security planters, 10 and 30 Hudson Yards, West 30th Street between 10th Avenue and 11th Avenue and 10th Avenue between West 30th Street and West 33rd Street, Manhattan |
Manhattan |
DOT |
Street furniture |
Amended Final |
|
2025-08-05 |
| Construction of an ADA ramp and stairs, 89-30 161st Street, 161st Street, Jamaica, Queens |
Queens |
DOT |
Street furniture |
Preliminary and Final |
|
2025-08-05 |
| Minor modifications to the rehabilitation of a track and turf field, Baisley Pond Park, Baisley Boulevard South, North Conduit Avenue, and 150th Street, Jamaica, Queens |
Queens |
DPR |
Landscape architecture |
Amended Final |
|
2025-08-05 |
| Installation of an interim roof, Bryn Mawr North Siphon Chamber, Lower Catskill Aqueduct, 56 Heights Drive, Yonkers, Westchester County |
Upstate |
DEP |
Building systems & Modifications |
Preliminary and Final |
|
2025-08-05 |
| Minor modifications to the construction of the Soundview Park Recreation Center, Soundview Park, Lafayette Avenue between Morrison Avenue and Metcalf Avenue, Bronx |
Bronx |
DDC/DPR |
Architecture |
Amended Final |
|
2025-08-05 |
| Installation of photovoltaic panels, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DCAS/DEP |
Architecture |
Final |
|
2025-07-21 |
| Modifications to the installation of The Flag (formerly Fabled Ecosystem) by Miguel Braceli, Mary Cali Dalton Recreation Center, 6 Victory Boulevard, adjacent to the Lyons Pool, Hannah Street, Murray Hulbert Avenue, and the Tompkinsville Esplanade, Staten Island |
Staten Island |
DCLA%/DDC/DPR |
Artwork |
Amended Preliminary |
|
2025-07-21 |
| Reconstruction of an operations building (Battery Field House), including a ticket office and public restrooms, Battery Park, Battery Place, State Street, Whitehall Place, and the Hudson River, Manhattan |
Manhattan |
DPR/BPC |
Architecture |
Preliminary |
|
2025-07-21 |
| Construction of interim prefabricated trailers, Queens County Farm Museum, 73-60 Little Neck Parkway, Floral Park, Queens |
Queens |
DDC/DPR |
Architecture |
Preliminary and Final |
|
2025-07-21 |
| Installation of True North, Every Negro is a Star and Conductors by Kenseth Armstead, Abolitionist Place (formerly Willoughby Square Park), Willoughby Street, Abolitionist Place (Duffield Street) and Gold Street, Brooklyn |
Brooklyn |
DCLA%/EDC |
Artwork |
Preliminary |
|
2025-07-21 |
| Construction of a batting cage for a Minor League Baseball Stadium (Maimonides Stadium), Steeplechase Park, Surf Avenue between West 16th and West 20th Street, Coney Island, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary and Final |
|
2025-07-21 |
| Construction of open space improvements, Kingsbridge Armory, 1 West Kingsbridge Road and Reservoir Avenue, Bronx |
Bronx |
EDC |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Minor modifications to the boiler and enclosure as part of the reconstruction of a substation, Building 62, Fifth Street between Morris Avenue and Market Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Amended Final |
|
2025-07-21 |
| Installation of Water Table by Jerome Haferd, East River Esplanade, 107th Street Pier, and Bobby Wagner Walk, East 94th Street to 107th Street, and East 117th Street to East 124th Street, Manhattan |
Manhattan |
EDC/DPR |
Artwork |
Preliminary |
|
2025-07-21 |
| Rehabilitation of the Liberty Avenue War Memorial, Public Place Mall, Eldert Lane between Glenmore Avenue and Liberty Avenue, Brooklyn |
Brooklyn |
DPR |
Artwork |
Final |
|
2025-07-21 |
| Modifications to the reconstruction of Rivington Street Playground, Sara D. Roosevelt Park, Forsyth Street, extension of Rivington Street, and Chrystie Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Amended Final |
|
2025-07-21 |
| Rehabilitation of a public restroom building, Colden Playground, Union Street between 31st Drive and 31st Road, Flushing, Queens |
Queens |
DPR |
Architecture |
Preliminary |
|
2025-07-21 |
| Rehabilitation of a public restroom building, Mathews-Palmer Playground, West 45th Street between Ninth Avenue and Tenth Avenue, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of Youth Village Playground, Home Street, Boston Road and Jackson Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Relocation of the bust of Fiorello LaGuardia (1934) by Jo Davidson, Little Flower Playground, Madison Street, Jefferson Street and Cherry Street, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
|
2025-07-21 |
| Reconstruction of Anchorage Plaza for use as a pickleball concession (CityPickle), adjacent to the Brooklyn Bridge, Washington Street, Prospect Street, and Old Fulton Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of Arverne Playground, Arverne Boulevard between Beach 56th and Beach 54th Street, Arverne, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of baseball field 1, Clove Lakes Park, Park Drive and Clove Road, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of a portion of Challenge Playground, adjacent to P.S. 811 (Marathon School), 251st Street between 61st Avenue and 63rd Avenue, Little Neck, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Construction of an ADA path and adjacent site work, Givans Creek Woods, Co-op City Boulevard between Baychester Avenue and Dreiser Loop, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2025-07-21 |
| Reconstruction of a portion of Harvard Playground, 179th Place between Jamaica Avenue and 90th Avenue, Hollis, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of Colden Playground, adjacent to P.S. 214, Union Street between 31st Drive and 31st Road, Flushing, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of a playground, Poe Park, East 192nd Street between Grand Concourse and East Kingsbridge Road, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2025-07-21 |
| Installation of streetscape improvements, including the removal of distinctive sidewalk pavers at pedestrian ramps and bus stops, Eastern Parkway Malls, Eastern Parkway at Utica Avenue, Rochester Avenue, and Buffalo Avenue, Brooklyn |
Brooklyn |
DOT |
Distinctive sidewalk |
Preliminary and Final |
|
2025-07-21 |
| Reconstruction of a shopping cart area (Fine Fare), 2530 Grand Concourse, Bronx |
Bronx |
DOT |
Landscape architecture |
Preliminary and Final |
|
2025-07-21 |
| Reconstruction of the 79th Street Boat Basin, including the construction of a dockhouse, Riverside Park and the Hudson River between West 80th Street and West 73rd Street, Manhattan |
Manhattan |
EDC/DPR |
Architecture |
Final |
|
2025-07-21 |
| Construction of a pedestrian bridge, Memorial Sloan-Kettering Hospital and Pavilion, 1275 York Avenue and 1235 York Avenue, above East 67th Street between First Avenue and York Avenue, Manhattan |
Manhattan |
DOT |
Bridge |
Preliminary |
|
2025-07-21 |
| Rehabilitation of a dock and ice breakers, North River Wastewater Resource Recovery Facility, 725 West 135th Street, Manhattan |
Manhattan |
DEP |
Landscape architecture |
Preliminary and Final |
|
2025-07-21 |
| Conservation of George Washington at Valley Forge (1906) by Henry Merwin Shrady, Continental Army Plaza (formerly George Washington Monument Park), South 4th Street between South 5th Street and Roebling Street, Brooklyn |
Brooklyn |
DPR |
Artwork |
Preliminary |
|
2025-07-21 |
| Reconstruction of a substation, Building 293, Assembly Road between Gee Avenue and Dry Dock 6, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary and Final |
Commented |
2025-07-21 |
| Construction of a storefront (Kingbridge) and adjacent site work, 209 Brooklyn Navy Yard (formerly Building 275), 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary |
|
2025-07-21 |
| Removal of a mosaic by Patrick Clark, Tribute Park, 116th Street and Beach Channel Drive, Far Rockaway, Queens |
Queens |
DPR |
Artwork |
Preliminary |
Commented |
2025-07-21 |
| Installation of louvers at the east façade (Lost + Found Prop Studio), Building 212, Flushing Avenue between Chauncey Avenue and Fourth Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-07-18 |
| Minor modifications to the installation of rooftop mechanical equipment, Fort Washington Armory, 216 Fort Washington Avenue, Manhattan |
Manhattan |
DDC/DHS |
Building systems & Modifications |
Amended Final |
|
2025-07-18 |