| Minor modifications to the design of a comfort station for installation citywide |
Citywide |
DPR |
Architecture |
Amended Conceptual |
|
2025-08-05 |
| Construction of an ADA ramp and stairs, 89-30 161st Street, 161st Street, Jamaica, Queens |
Queens |
DOT |
Street furniture |
Preliminary and Final |
|
2025-08-05 |
| Replacement of HVAC equipment, Building 138, 138 General R W Berry Drive, Fort Totten, Bayside, Queens |
Queens |
FDNY |
Building systems & Modifications |
Preliminary and Final |
|
2025-08-05 |
| Minor modifications to the installation of security planters, 10 and 30 Hudson Yards, West 30th Street between 10th Avenue and 11th Avenue and 10th Avenue between West 30th Street and West 33rd Street, Manhattan |
Manhattan |
DOT |
Street furniture |
Amended Final |
|
2025-08-05 |
| Replacement of mechanical and electrical equipment, Berth 8, 9, and 10, Dry Docks 5 and 6, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-08-05 |
| Replacement of a security booth as part of the construction of an academic building, 28th Street between Seventh Avenue and Eighth Avenue, Fashion Institute of Technology, Manhattan |
Manhattan |
DOE |
Building systems & Modifications |
Amended Final |
|
2025-08-05 |
| Reconstruction of a playground, Poe Park, East 192nd Street between Grand Concourse and East Kingsbridge Road, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2025-07-21 |
| Construction of an ADA path and adjacent site work, Givans Creek Woods, Co-op City Boulevard between Baychester Avenue and Dreiser Loop, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2025-07-21 |
| Rehabilitation of the Liberty Avenue War Memorial, Public Place Mall, Eldert Lane between Glenmore Avenue and Liberty Avenue, Brooklyn |
Brooklyn |
DPR |
Artwork |
Final |
|
2025-07-21 |
| Relocation of the bust of Fiorello LaGuardia (1934) by Jo Davidson, Little Flower Playground, Madison Street, Jefferson Street and Cherry Street, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
|
2025-07-21 |
| Rehabilitation of a public restroom building, Mathews-Palmer Playground, West 45th Street between Ninth Avenue and Tenth Avenue, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary |
|
2025-07-21 |
| Modifications to the reconstruction of Rivington Street Playground, Sara D. Roosevelt Park, Forsyth Street, extension of Rivington Street, and Chrystie Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Amended Final |
|
2025-07-21 |
| Reconstruction of Youth Village Playground, Home Street, Boston Road and Jackson Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Rehabilitation of a public restroom building, Colden Playground, Union Street between 31st Drive and 31st Road, Flushing, Queens |
Queens |
DPR |
Architecture |
Preliminary |
|
2025-07-21 |
| Construction of a batting cage for a Minor League Baseball Stadium (Maimonides Stadium), Steeplechase Park, Surf Avenue between West 16th and West 20th Street, Coney Island, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary and Final |
|
2025-07-21 |
| Installation of True North, Every Negro is a Star and Conductors by Kenseth Armstead, Abolitionist Place (formerly Willoughby Square Park), Willoughby Street, Abolitionist Place (Duffield Street) and Gold Street, Brooklyn |
Brooklyn |
DCLA%/EDC |
Artwork |
Preliminary |
|
2025-07-21 |
| Reconstruction of an operations building (Battery Field House), including a ticket office and public restrooms, Battery Park, Battery Place, State Street, Whitehall Place, and the Hudson River, Manhattan |
Manhattan |
DPR/BPC |
Architecture |
Preliminary |
|
2025-07-21 |
| Construction of open space improvements, Kingsbridge Armory, 1 West Kingsbridge Road and Reservoir Avenue, Bronx |
Bronx |
EDC |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of baseball field 1, Clove Lakes Park, Park Drive and Clove Road, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Installation of Water Table by Jerome Haferd, East River Esplanade, 107th Street Pier, and Bobby Wagner Walk, East 94th Street to 107th Street, and East 117th Street to East 124th Street, Manhattan |
Manhattan |
EDC/DPR |
Artwork |
Preliminary |
|
2025-07-21 |
| Reconstruction of Anchorage Plaza for use as a pickleball concession (CityPickle), adjacent to the Brooklyn Bridge, Washington Street, Prospect Street, and Old Fulton Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of Arverne Playground, Arverne Boulevard between Beach 56th and Beach 54th Street, Arverne, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of Colden Playground, adjacent to P.S. 214, Union Street between 31st Drive and 31st Road, Flushing, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of the 79th Street Boat Basin, including the construction of a dockhouse, Riverside Park and the Hudson River between West 80th Street and West 73rd Street, Manhattan |
Manhattan |
EDC/DPR |
Architecture |
Final |
|
2025-07-21 |
| Installation of streetscape improvements, including the removal of distinctive sidewalk pavers at pedestrian ramps and bus stops, Eastern Parkway Malls, Eastern Parkway at Utica Avenue, Rochester Avenue, and Buffalo Avenue, Brooklyn |
Brooklyn |
DOT |
Distinctive sidewalk |
Preliminary and Final |
|
2025-07-21 |
| Reconstruction of a shopping cart area (Fine Fare), 2530 Grand Concourse, Bronx |
Bronx |
DOT |
Landscape architecture |
Preliminary and Final |
|
2025-07-21 |
| Conservation of George Washington at Valley Forge (1906) by Henry Merwin Shrady, Continental Army Plaza (formerly George Washington Monument Park), South 4th Street between South 5th Street and Roebling Street, Brooklyn |
Brooklyn |
DPR |
Artwork |
Preliminary |
|
2025-07-21 |
| Removal of a mosaic by Patrick Clark, Tribute Park, 116th Street and Beach Channel Drive, Far Rockaway, Queens |
Queens |
DPR |
Artwork |
Preliminary |
Commented |
2025-07-21 |
| Modifications to the installation of The Flag (formerly Fabled Ecosystem) by Miguel Braceli, Mary Cali Dalton Recreation Center, 6 Victory Boulevard, adjacent to the Lyons Pool, Hannah Street, Murray Hulbert Avenue, and the Tompkinsville Esplanade, Staten Island |
Staten Island |
DCLA%/DDC/DPR |
Artwork |
Amended Preliminary |
|
2025-07-21 |
| Construction of interim prefabricated trailers, Queens County Farm Museum, 73-60 Little Neck Parkway, Floral Park, Queens |
Queens |
DDC/DPR |
Architecture |
Preliminary and Final |
|
2025-07-21 |
| Minor modifications to the boiler and enclosure as part of the reconstruction of a substation, Building 62, Fifth Street between Morris Avenue and Market Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Amended Final |
|
2025-07-21 |
| Reconstruction of a substation, Building 293, Assembly Road between Gee Avenue and Dry Dock 6, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary and Final |
Commented |
2025-07-21 |
| Installation of photovoltaic panels, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DCAS/DEP |
Architecture |
Final |
|
2025-07-21 |
| Rehabilitation of a dock and ice breakers, North River Wastewater Resource Recovery Facility, 725 West 135th Street, Manhattan |
Manhattan |
DEP |
Landscape architecture |
Preliminary and Final |
|
2025-07-21 |
| Construction of a storefront (Kingbridge) and adjacent site work, 209 Brooklyn Navy Yard (formerly Building 275), 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary |
|
2025-07-21 |
| Construction of a pedestrian bridge, Memorial Sloan-Kettering Hospital and Pavilion, 1275 York Avenue and 1235 York Avenue, above East 67th Street between First Avenue and York Avenue, Manhattan |
Manhattan |
DOT |
Bridge |
Preliminary |
|
2025-07-21 |
| Reconstruction of a portion of Challenge Playground, adjacent to P.S. 811 (Marathon School), 251st Street between 61st Avenue and 63rd Avenue, Little Neck, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Reconstruction of a portion of Harvard Playground, 179th Place between Jamaica Avenue and 90th Avenue, Hollis, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-07-21 |
| Minor modifications to the construction of a utility enclosure for electric vehicle charging equipment, New Dorp Municipal Parking Field, 98 New Dorp Lane, Staten Island |
Staten Island |
DOT |
Architecture |
Amended Final |
|
2025-07-18 |
| Installation of a bulkhead louver (Kubota), Building 77, 141 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-07-18 |
| Installation of louvers at the east façade (Lost + Found Prop Studio), Building 212, Flushing Avenue between Chauncey Avenue and Fourth Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
|
2025-07-18 |
| Minor modifications to the installation of rooftop mechanical equipment, Fort Washington Armory, 216 Fort Washington Avenue, Manhattan |
Manhattan |
DDC/DHS |
Building systems & Modifications |
Amended Final |
|
2025-07-18 |
| Minor modifications to the construction of an off-shore wind operations and maintenance building and adjacent sitework, South Brooklyn Marine Terminal, 2nd Avenue between 32nd Street and 34th Street, Brooklyn |
Brooklyn |
EDC |
Architecture |
Amended Final |
|
2025-07-18 |
| Reconstruction of a fenced-in areaway and stairs, 49 Wyckoff Avenue, Brooklyn |
Brooklyn |
DOT |
Landscape architecture |
Preliminary and Final |
|
2025-07-18 |
| Reconstruction of Wolfe’s Pond Park Playground, including the construction of pickleball courts, Wolfe's Pond Park, near Cornelia Avenue and Chester Avenue, Staten Island |
Staten Island |
DPR |
Landscape architecture |
Preliminary |
|
2025-06-23 |
| Relocation of a plaque, Liotti Ikefugi Playground, Bismark Avenue and Winter Avenue, Staten Island |
Staten Island |
DPR |
Signage |
Preliminary |
|
2025-06-23 |
| Construction of a hospitality building (Player Performance Building), including a parking garage, United States Tennis Association's Billie Jean King National Tennis Center, Flushing Meadows Corona Park, Flushing, Queens |
Queens |
DPR |
Architecture |
Final |
|
2025-06-23 |
| Installation of prototypical pipe bollards, 4302 Fort Hamilton Parkway, between New Utrecht Avenue and 43rd Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
|
2025-06-23 |
| Construction of an open space (The Baseline) under the ramps to the Ed Koch Queensborough Bridge, Dutch Kills Street between Jackson Avenue and the Long Island Rail Road, Long Island City, Queens |
Queens |
DOT |
Landscape architecture |
Final |
|
2025-06-23 |
| Installation of shopping cart area (Foodtown), 5555 Broadway, Bronx |
Bronx |
DOT |
Street furniture |
Preliminary and Final |
|
2025-06-23 |