Projects (8,439)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Construction of Buildings 2A and 2B and a central plaza as Phase II of the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx Bronx EDC Architecture Final Approved 2022-04-11
Construction of a mixed-use development, including a hotel tower and residential tower, 495 11th Avenue, 11th Avenue between 39th Street and 40th Street, Manhattan Manhattan EDC Architecture Final Approved 2022-04-11
Installation of rooftop mechanical equipment (Stop & Shop), 625 Atlantic Avenue, Brooklyn Brooklyn EDC Building systems & Modifications Preliminary and Final Approved 2022-04-11
Installation of louvers and rooftop mechanical equipment (Nike), 625 Atlantic Avenue, Brooklyn Brooklyn EDC Building systems & Modifications Preliminary and Final Approved 2022-04-11
Rehabilitation of Queens District 8, 10 and 12 Garage and construction of a prefabricated swing space, 130-23 150th Avenue, South Ozone Park, Queens Queens DSNY Architecture Preliminary and Final Approved 2022-04-11
Relocation of the Peter Caesar Alberti Memorial (1958/1985) by unknown, 75 feet northeast within the Battery perimeter, as part of the South Battery Park City Resiliency master plan, The Battery, Battery Place between Washington Street and Little West 12th Street, Manhattan Manhattan DPR Artwork Preliminary Approved 2022-04-11
Construction of flood protection measures as part of the South Battery Park City Resiliency master plan, Battery Place between 1st Place and Little West Street, Pier A Plaza, and The Battery, Manhattan Manhattan DPR Landscape architecture Final Approved 2022-04-11
Installation of rooftop photovoltaic panels, Brownsville Recreation Center, 1555 Linden Boulevard, Brooklyn Brooklyn DPR Building systems & Modifications Preliminary and Final Approved 2022-04-11
Reconstruction of the Kinderberg, restoration of the Chess and Checkers House, and adjacent site work, East 65th Street transverse road between Center Drive and East Drive, Central Park, Manhattan Manhattan DPR Landscape architecture Final Approved 2022-04-11
Reconstruction of Dongan Playground, adjacent to P.S. 52, Dongan Hills Avenue, Mason Avenue, and Buel Avenue, Staten Island Staten Island DPR Landscape architecture Final Approved 2022-04-11
Reconstruction of Cuyler Gore Park, Green Avenue, Carlton Street, and Fulton Street, Brooklyn Brooklyn DPR Landscape architecture Final Approved 2022-04-11
Reconstruction of Police Officer Jeff B. Herman Ballfield, McDonald Playground, McDonald Avenue, Avenue S, East 1st Street, and Avenue T, Brooklyn Brooklyn DPR Landscape architecture Preliminary Approved 2022-04-11
Installation of pipe bollards, Shore Parkway at 24th Avenue, Brooklyn Brooklyn DOT Street furniture Preliminary and Final Approved 2022-04-11
Construction of planted areas and an entry canopy, 109-117 East 79th Street, Manhattan Manhattan DOT Landscape architecture Preliminary and Final Approved 2022-04-11
Construction of a fence and planted areas, Palace Hall, 770 McDonald Avenue, between Ditmas Avenue and Avenue F, Brooklyn Brooklyn DOT Landscape architecture Preliminary and Final Approved 2022-04-11
Installation of signage, P.S. 272K (The Curtis Estabrook School), 101-24 Seaview Avenue, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2022-04-11
Installation of signage, P.S. 250K (George H. Lindsay - The Williamsburg Magnet School for Communications and Multimedia Arts), 108 Montrose Avenue, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2022-04-11
Installation of signage, P.S. 099Q (The Kew Gardens School), 82-37 Kew Gardens Road, Kew Gardens, Queens Queens DOE Signage Preliminary and Final Approved 2022-04-11
Installation of signage, I.S. 201K (The Madeleine Brennan School), 8010 12th Avenue, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2022-04-11
Stabilization of the West Branch Auxiliary Dam, West Branch Reservoir, US Route 6 and Drewville Road, Town of Carmel, Putnam County Upstate DEP Landscape architecture Final Approved 2022-04-11
Reconstruction of a portion of the bulkhead and adjacent site work, Tallman Island Wastewater Resource Recovery Facility, 127th Street and Powell's Cove Boulevard, College Point, Queens Queens DEP Landscape architecture Preliminary and Final Approved 2022-04-11
Installation of lightning protection, Cross River Dam, Croton Aqueduct System, Maple Avenue and Reservoir Road, Katonah, Westchester County Upstate DEP Building systems & Modifications Preliminary and Final Approved 2022-04-11
Installation of Flexus by Grimanesa Amorós, Harper Street Yard, 30-01 Harper Street, Corona, Queens Queens DCLA% Artwork Preliminary Approved 2022-04-11
Installation of ducts and louvers, Building 5 (Suite 502), 7th Avenue, Paulding Street, 8th Avenue, and Farragut Street, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Building systems & Modifications Preliminary and Final Approved 2022-04-11
Reconstruction of Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx Bronx DPR Landscape architecture Commented 2022-04-11
Restoration of the roof, St. George Branch Library, 5 Central Avenue, Staten Island Staten Island DDC Building systems & Modifications Preliminary and Final Commented 2022-04-11
Reconstruction of the esplanade and adjacent site work (Lower Manhattan Coastal Resiliency), The Battery, Battery Place, State Street, Peter Minuit Plaza, and the Upper New York Bay, Manhattan Manhattan EDC Landscape architecture Preliminary Commented 2022-04-11
Construction of Oyster Bay outlook, Sunset Cove Park, Jamaica Bay and Cross Bay Boulevard, Broad Channel, Queens Queens DPR Landscape architecture Preliminary and Final Commented 2022-04-11
Reconstruction of the Mersereau Avenue Pump Station including the construction of a service building, 349 Mersereau Avenue, Staten Island Staten Island DEP Architecture Commented 2022-04-11
Installation of a manhole, vent pipe, and safety signage, Alley Pond Nature Building, Douglaston Parkway and Grand Central Parkway, Oakland Gardens, Queens Queens DDC Building systems & Modifications Commented 2022-04-11
Rehabilitation of a comfort station and adjacent site work, 24 Sycamores Playground, F.D.R. Drive, East 60th Street, East 61st Street, and York Avenue, Manhattan Manhattan DPR Architecture Commented 2022-04-11
Rehabilitation of the Richmond Avenue Pump Station, 10 Prol Place, Staten Island Staten Island DEP Architecture Commented 2022-04-11
Construction of the esplanade, Phase V, East River Waterfront between Peck Slip and Catherine Slip, Manhattan Manhattan EDC Landscape architecture Preliminary Commented 2022-04-11
Construction of a pedestrian bridge over Furman Street between Squibb Park and Brooklyn Bridge Park, Brooklyn Brooklyn BBP Bridge Preliminary and Final Commented 2022-04-11
Installation of security bollards, Pier 1, Brooklyn Bridge Park, Furman Street and Old Fulton Street, Brooklyn Brooklyn DOT Street furniture Preliminary and Final Commented 2022-04-11
Installation of manhole covers and doors for backflow preventers, 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Building systems & Modifications Commented 2022-04-11
Installation of rooftop mechanical equipment and windows, Engine Company 82, 1215 Intervale Avenue, Bronx Bronx FDNY Building systems & Modifications Preliminary and Final Commented 2022-04-11
Reconstruction of Park Drive East Pump Station, 73-22 Park Drive East, Flushing Meadows-Corona Park, Queens Queens DEP Architecture Commented 2022-04-11
Installation of rooftop HVAC equipment, Eastchester Branch Library, 138 East Gun Hill Road, Bronx Bronx DDC Building systems & Modifications Commented 2022-03-14
Installation of an ADA ramp, Brooklyn War Memorial, Cadman Plaza, Tillary Street, Fulton Street, Prospect Street, and Washington Street, Brooklyn Brooklyn DPR Architecture Commented 2022-03-14
Installation of a manhole cover, fuel tank access, and ventilation equipment, Engine Company 28, 222 East 2nd Street, Manhattan Manhattan DDC Building systems & Modifications Preliminary and Final Commented 2022-03-14
Installation of an interim fire protection RPZ enclosure, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn Brooklyn EDC Landscape architecture Preliminary and Final Approved with conditions 2022-03-14
Rehabilitation of freight rail tracks, Hunts Point Terminal Produce Market, Row D, 410 Halleck Street, Bronx Bronx EDC Landscape architecture Preliminary and Final Approved 2022-03-14
Construction of a prototypical comfort station, Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens Queens DPR Architecture Final Approved 2022-03-14
Construction of a maintenance building and comfort station, Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens Queens DPR Architecture Final Approved 2022-03-14
Construction of a dog run, Riverside Park, Riverside Drive at West 142nd Street, Manhattan Manhattan DPR Landscape architecture Final Approved 2022-03-14
Conservation of Dante Alighieri (1921) by Ettore Ximenes, Dante Park, Columbus Avenue, Broadway, and West 63rd Street, Manhattan Manhattan DPR Artwork Final Approved 2022-03-14
Reconstruction of Ruppert Park, East 90th Street, Second Avenue, and East 91st Street, Manhattan Manhattan DPR Landscape architecture Preliminary Approved 2022-03-14
Installation of security bollards, 50 Hudson Yards, West 34th Street, 10th Avenue, West 33rd Street, and Hudson Boulevard East, Manhattan Manhattan DOT Street furniture Preliminary and Final Approved 2022-03-14
Installation of signage, P.S. 81K (Thaddeus Stevens Elementary School), 990 Dekalb Avenue, Brooklyn Brooklyn DOE Signage Preliminary and Final Approved 2022-03-14