| Installation of pipe bollards, Shore Parkway at 24th Avenue, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
Approved |
2022-04-11 |
| Construction of planted areas and an entry canopy, 109-117 East 79th Street, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-04-11 |
| Construction of a fence and planted areas, Palace Hall, 770 McDonald Avenue, between Ditmas Avenue and Avenue F, Brooklyn |
Brooklyn |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-04-11 |
| Installation of signage, P.S. 272K (The Curtis Estabrook School), 101-24 Seaview Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-04-11 |
| Installation of signage, P.S. 250K (George H. Lindsay - The Williamsburg Magnet School for Communications and Multimedia Arts), 108 Montrose Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-04-11 |
| Installation of signage, P.S. 099Q (The Kew Gardens School), 82-37 Kew Gardens Road, Kew Gardens, Queens |
Queens |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-04-11 |
| Installation of signage, I.S. 201K (The Madeleine Brennan School), 8010 12th Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-04-11 |
| Stabilization of the West Branch Auxiliary Dam, West Branch Reservoir, US Route 6 and Drewville Road, Town of Carmel, Putnam County |
Upstate |
DEP |
Landscape architecture |
Final |
Approved |
2022-04-11 |
| Reconstruction of a portion of the bulkhead and adjacent site work, Tallman Island Wastewater Resource Recovery Facility, 127th Street and Powell's Cove Boulevard, College Point, Queens |
Queens |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2022-04-11 |
| Installation of lightning protection, Cross River Dam, Croton Aqueduct System, Maple Avenue and Reservoir Road, Katonah, Westchester County |
Upstate |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-04-11 |
| Installation of Flexus by Grimanesa Amorós, Harper Street Yard, 30-01 Harper Street, Corona, Queens |
Queens |
DCLA% |
Artwork |
Preliminary |
Approved |
2022-04-11 |
| Installation of ducts and louvers, Building 5 (Suite 502), 7th Avenue, Paulding Street, 8th Avenue, and Farragut Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-04-11 |
| Restoration of the roof, St. George Branch Library, 5 Central Avenue, Staten Island |
Staten Island |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-04-11 |
| Reconstruction of the esplanade and adjacent site work (Lower Manhattan Coastal Resiliency), The Battery, Battery Place, State Street, Peter Minuit Plaza, and the Upper New York Bay, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary |
Commented |
2022-04-11 |
| Reconstruction of a fueling station, Battalion 32, 347 Bond Street, Brooklyn |
Brooklyn |
DDC |
Building systems & Modifications |
|
Commented |
2022-04-11 |
| Reconstruction of Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Commented |
2022-04-11 |
| Reconstruction of Park Drive East Pump Station, 73-22 Park Drive East, Flushing Meadows-Corona Park, Queens |
Queens |
DEP |
Architecture |
|
Commented |
2022-04-11 |
| Reconstruction of the Mersereau Avenue Pump Station including the construction of a service building, 349 Mersereau Avenue, Staten Island |
Staten Island |
DEP |
Architecture |
|
Commented |
2022-04-11 |
| Rehabilitation of the Richmond Avenue Pump Station, 10 Prol Place, Staten Island |
Staten Island |
DEP |
Architecture |
|
Commented |
2022-04-11 |
| Installation of manhole covers and doors for backflow preventers, 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
|
Commented |
2022-04-11 |
| Rehabilitation of a comfort station and adjacent site work, 24 Sycamores Playground, F.D.R. Drive, East 60th Street, East 61st Street, and York Avenue, Manhattan |
Manhattan |
DPR |
Architecture |
|
Commented |
2022-04-11 |
| Rehabilitation of the Owen F. Dolen Golden Age Recreation Center, Owen F. Dolen Park, 2551 Westchester Avenue, Bronx |
Bronx |
DPR |
Architecture |
|
Commented |
2022-04-11 |
| Installation of a manhole, vent pipe, and safety signage, Alley Pond Nature Building, Douglaston Parkway and Grand Central Parkway, Oakland Gardens, Queens |
Queens |
DDC |
Building systems & Modifications |
|
Commented |
2022-04-11 |
| Construction of Oyster Bay outlook, Sunset Cove Park, Jamaica Bay and Cross Bay Boulevard, Broad Channel, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary and Final |
Commented |
2022-04-11 |
| Construction of the esplanade, Phase V, East River Waterfront between Peck Slip and Catherine Slip, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary |
Commented |
2022-04-11 |
| Construction of a pedestrian bridge over Furman Street between Squibb Park and Brooklyn Bridge Park, Brooklyn |
Brooklyn |
BBP |
Bridge |
Preliminary and Final |
Commented |
2022-04-11 |
| Installation of security bollards, Pier 1, Brooklyn Bridge Park, Furman Street and Old Fulton Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
Commented |
2022-04-11 |
| Installation of rooftop mechanical equipment and windows, Engine Company 82, 1215 Intervale Avenue, Bronx |
Bronx |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-04-11 |
| Installation of a manhole cover, fuel tank access, and ventilation equipment, Engine Company 28, 222 East 2nd Street, Manhattan |
Manhattan |
DDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-03-14 |
| Construction of a flood wall and resiliency infrastructure, including a portion of the Brooklyn Waterfront Greenway (Red Hook Coastal Resiliency), from Summit Street at Hamilton Avenue, to Ferris Street at Coffey Street, to Halleck Street at Columbia Street, Brooklyn |
Brooklyn |
DDC |
Landscape architecture |
|
Commented |
2022-03-14 |
| Installation of an interim fire protection RPZ enclosure, Bush Terminal Industrial Campus (Made in NY), between 41st Street, 1st Avenue, and 44th Street, and the waterfront, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Preliminary and Final |
Approved with conditions |
2022-03-14 |
| Rehabilitation of freight rail tracks, Hunts Point Terminal Produce Market, Row D, 410 Halleck Street, Bronx |
Bronx |
EDC |
Landscape architecture |
Preliminary and Final |
Approved |
2022-03-14 |
| Construction of a prototypical comfort station, Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
Final |
Approved |
2022-03-14 |
| Construction of a maintenance building and comfort station, Michaelis-Bayswater Park, Bay 32nd Street, Beach Channel Drive, Beach 35th Street, and Norton Avenue, Far Rockaway, Queens |
Queens |
DPR |
Architecture |
Final |
Approved |
2022-03-14 |
| Construction of a dog run, Riverside Park, Riverside Drive at West 142nd Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Approved |
2022-03-14 |
| Conservation of Dante Alighieri (1921) by Ettore Ximenes, Dante Park, Columbus Avenue, Broadway, and West 63rd Street, Manhattan |
Manhattan |
DPR |
Artwork |
Final |
Approved |
2022-03-14 |
| Reconstruction of Ruppert Park, East 90th Street, Second Avenue, and East 91st Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-03-14 |
| Installation of security bollards, 50 Hudson Yards, West 34th Street, 10th Avenue, West 33rd Street, and Hudson Boulevard East, Manhattan |
Manhattan |
DOT |
Street furniture |
Preliminary and Final |
Approved |
2022-03-14 |
| Installation of signage, P.S. 81K (Thaddeus Stevens Elementary School), 990 Dekalb Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-03-14 |
| Installation of signage, P.S. 346K (Abe Stark Elementary School), 1400 Pennsylvania Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-03-14 |
| Installation of signage, P.S. 159K (Isaac Pitkin School), 2781 Pitkin Avenue, Brooklyn |
Brooklyn |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-03-14 |
| Installation of signage, P.S. 148Q The (Ruby G. Allen School), 89-02 32nd Avenue, East Elmhurst, Queens |
Queens |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-03-14 |
| Construction a bluebelt as a part of the South Shore Coastal Resiliency Plan, South Beach, Father Capodanno Boulevard between Quintard Street and Sand Lane, Staten Island |
Staten Island |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2022-03-14 |
| Design of prototypical porous concrete green infrastructure panels for installation citywide |
Citywide |
DEP |
Landscape architecture |
Preliminary and Final |
Approved |
2022-03-14 |
| Installation of an access control system, main entry guard booth, Tallman Island Wastewater Resource Recovery Facility, 127-01 Powell’s Cove Boulevard, Queens |
Queens |
DEP |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-03-14 |
| Reconstruction of the 154th Street Pump Station, Powell’s Cove Boulevard between 154th Street and 154th Place, Whitestone, Queens |
Queens |
DEP |
Architecture |
Preliminary |
Approved with conditions |
2022-03-14 |
| Installation of rooftop mechanical equipment, Seaside Library, 116-15 Rockaway Beach Boulevard, Belle Harbor, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-03-14 |
| Construction of a temporary exhibit (Budgie Feeding Experience), Bronx Zoo, 2300 Southern Boulevard, Bronx |
Bronx |
DCLA |
Architecture |
Preliminary and Final |
Approved |
2022-03-14 |
| Installation of Waves by Andrea Belag, Engine Company 268/Ladder Company 137, 116-11 Beach Channel Drive, Rockaway Park, Queens |
Queens |
DCLA% |
Artwork |
Conceptual |
Approved with conditions |
2022-03-14 |
| Reconstruction of Building 74, Chauncey Avenue between 4th Street and 5th Street, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary |
Approved with conditions |
2022-03-14 |