| Construction of a plaza, Queensbridge Baby Park, Vernon Boulevard and Queensbridge Park Greenway, adjacent to the Queensboro Bridge, Long Island City, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-08-08 |
| Installation of an ADA ramp, 1310 West Farms Road, Bronx |
Bronx |
DOT |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-08-08 |
| Construction of a fenced-in area, 234 North 9th Street, Brooklyn |
Brooklyn |
DOT |
Landscape architecture |
Preliminary and Final |
Approved |
2022-08-08 |
| Installation of vent hoods and construction of an outfall connection as part of the Ashokan Century Program, Lower Gate Chamber, Ashokan Reservoir, Ulster County |
Upstate |
DEP |
Building systems & Modifications |
Preliminary |
Approved |
2022-08-08 |
| Installation of rooftop mechanical equipment, windows, and doors, Hollis Branch Public Library, 202-05 Hillside Avenue, Queensborough, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-08-08 |
| Installation of three paintings by Jessica Alazraki, Bronx Animal Care Center, 2050 Bartow Avenue at Co-Op City Boulevard, Bronx |
Bronx |
DCLA% |
Artwork |
Conceptual and Preliminary |
Approved |
2022-08-08 |
| Installation of doors and louvers, Building 50, Fifth Street, Ordinance Avenue, and Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-08-08 |
| Reconstruction of a salt shed and interim compost facility as part of the Gowanus Canal combined sewer overflow facility, 2nd Avenue and 6th Street, Brooklyn |
Brooklyn |
DEP |
Architecture |
Preliminary and Final |
Approved |
2022-08-08 |
| Design of electric vehicle charging stations for installation citywide |
Citywide |
DOT |
Street furniture |
Final |
Commented |
2022-08-08 |
| Reconstruction of a portion of Osborn Playground, Osborn Street between Hegeman Avenue and Linden Boulevard, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Commented |
2022-08-08 |
| Reconstruction of Babi Yar Triangle, Corbin Place, Ocean View Avenue, and Brighton 14th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Commented |
2022-08-08 |
| Installation of rooftop photovoltaic panels, Special Operations Command, 750 Main Street, Roosevelt Island, Manhattan |
Manhattan |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-08-08 |
| Installation of Emanativ by Eto Otitigbe, Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Queens |
EDC |
Artwork |
Conceptual |
Commented |
2022-08-08 |
| Installation of windows, louvers, and mechanical equipment, Emergency Medical Station 20 (EMS 20), 1400 Pelham Parkway South, Bronx |
Bronx |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-08-08 |
| Installation of rooftop mechanical equipment, Engine Company 24, 227 Sixth Avenue, Manhattan |
Manhattan |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-08-08 |
| Conservation of the Alice and Friends mural series |
Citywide |
HHC |
Artwork |
|
Commented |
2022-08-08 |
| Reconstruction of eight electrical vault buildings, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2022-08-08 |
| Construction of a prototypical comfort station, Flushing Meadows Corona Park, Corona, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2022-08-08 |
| Rehabilitation of the Olmsted Center, including adjacent site work, Flushing Meadows Corona Park, Queens |
Queens |
DPR |
Architecture |
|
Commented |
2022-08-08 |
| Construction of an environmental learning center (Solar 2) and adjacent site work, 24-20 FDR Drive at Peter Cooper Road, Manhattan |
Manhattan |
EDC |
Architecture |
|
Commented |
2022-08-08 |
| Construction of the Mary Cali Dalton Recreation Center, 6 Victory Boulevard, adjacent to at the Lyons Pool, Hannah Street, Murray Hulbert Avenue, and the Tompkinsville Esplanade, Staten Island |
Staten Island |
DDC |
Architecture |
|
Commented |
2022-08-08 |
| Construction of a garden entrance and adjacent site work, Dag Hammarskjold Plaza, East 47th between 1st Avenue and 2nd Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
Commented |
2022-08-08 |
| Reconstruction of Bloomingdale Playground, Amsterdam Avenue between West 104th Street and West 105th Street, Manhattan |
Manhattan |
DPR |
Landscape Architecture |
|
Commented |
2022-08-08 |
| Installation of rooftop photovoltaic panels, Emergency Medical Station 45 (EMS 45), 58-65 52nd Road, Woodside, Queens |
Queens |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-08-08 |
| Construction of a carport and installation of photovoltaic panels, Engine Company 332, 165 Bradford Street, Brooklyn |
Brooklyn |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-08-08 |
| Demolition of Design Team Project (1994) by Scott Burton, as part of the reconstruction of Sheepshead Bay Piers, Emmons Avenue between 21st Street and 27th Street, Brooklyn |
Brooklyn |
DPR |
Artwork |
Preliminary and Final |
Commented |
2022-07-11 |
| Reconstruction of Nautilus Playground, Roy Wilkins Park, Merrick Boulevard and Baisley Boulevard, Jamaica, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary and Final |
Commented |
2022-07-11 |
| Reconstruction of a landscape, North Meadow Recreation Center, West Drive and 97th Street Transverse Road, Central Park, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-07-11 |
| Installation of rooftop antennas (Verizon), 25 Waterside Plaza, Manhattan |
Manhattan |
HPD |
Building systems & Modifications |
Preliminary and Final |
Approved |
2022-07-11 |
| Construction of a waterfront park and streetscape improvements, Phase II and Phase III, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Landscape architecture |
Final |
Approved |
2022-07-11 |
| Construction of a maintenance building, a comfort station, and adjacent site work, as Phase II and Phase III of the construction of a waterfront park and streetscape improvements, Thompson Street, Wave Street and Bay Street, Stapleton, Staten Island |
Staten Island |
EDC |
Architecture |
Final |
Approved |
2022-07-11 |
| Construction of a horse riding facility, Prospect Park, north of the Prospect Park Zoo, between Flatbush Avenue and East Drive, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary |
Approved |
2022-07-11 |
| Construction of streetscape improvements as part of the Safe Routes to School program, Broadway Malls and Columbia University Medical Center, Broadway between West 131st Street and West 169th Street, St. Nicholas Avenue between West 129th Street and West 135th Street, Lenox Avenue at West 135th Street, First Avenue at East 106th Street, and Second Avenue at East 109th Street, Manhattan |
Manhattan |
DDC |
Landscape architecture |
Preliminary and Final |
Approved |
2022-07-11 |
| Reconstruction of the playground, Captain Mario Fajardo Park, Kissena Boulevard and Booth Memorial Avenue, Flushing, Queens |
Queens |
DPR |
Landscape architecture |
Final |
Approved |
2022-07-11 |
| Reconstruction of Chester Playground, adjacent to P.S. 327, Bristol Street and Chester Street between Sutter Avenue and Pitkin Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2022-07-11 |
| Installation of a plaque commemorating Spanish casualties of the American Revolution, Fort Greene Park, Myrtle Avenue, Washington Park, Dekalb Avenue and Saint Edward Street, Brooklyn |
Brooklyn |
DPR |
Artwork |
Final |
Approved |
2022-07-11 |
| Reconstruction of Goble Playground, Macombs Road, Goble Place, and Inwood Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary and Final |
Approved |
2022-07-11 |
| Design of an identity and branding system for use citywide |
Citywide |
DPR |
Signage |
Preliminary and Final |
Approved |
2022-07-11 |
| Reconstruction of William F. Moore Park, 108th Street, Corona Avenue, and 51st Avenue, Corona, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-07-11 |
| Reconstruction of Horseshoe Playground, Hall Place and Rogers Place, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-07-11 |
| Reconstruction of Benninger Playground, Madison Street between Fresh Pond Road and 60th Place, Ridgewood, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2022-07-11 |
| Installation of a flagpole and adjacent site work, Blissville Triangle, Review Avenue, Van Dam Street, and Greenpoint Avenue, Long Island City, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-07-11 |
| Construction of Waters Edge Playground, Cross Island Park, Waters Edge Drive and 24th Avenue, Bayside, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2022-07-11 |
| Construction of a path, Sunken Garden, Randall’s Island, between Harlem River Parkway and Garden Connector Path, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved with conditions |
2022-07-11 |
| Installation of commemorative markers (Harlem Heritage Markers), Hudson River, 125th Street to 162nd Street, and the Bronx River, Manhattan |
Manhattan |
DOT |
Signage |
Preliminary and Final |
Approved |
2022-07-11 |
| Installation of a marquee, RiseNY Building, 160 West 45th Street, Manhattan |
Manhattan |
DOT |
Signage |
Preliminary and Final |
Approved |
2022-07-11 |
| Installation of security bollards and a distinctive sidewalk, 270 Park Avenue, Park Avenue, East 47th Street, Madison Avenue, and East 48th Street, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary |
Approved |
2022-07-11 |
| Installation of signage, P.S. 19M (East Village Community School), 185 First Avenue, Manhattan |
Manhattan |
DOE |
Signage |
Preliminary and Final |
Approved |
2022-07-11 |
| Reconstruction of power centers 4 and 7 and installation of transformers, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Architecture |
Final |
Approved |
2022-07-11 |
| Installation of louvers, Pamoja House, 357 Marcus Garvey Boulevard, Brooklyn |
Brooklyn |
DDC |
Architecture |
Preliminary and Final |
Approved |
2022-07-11 |