| Reconstruction of Berry Playground, South Third Street between Berry Street and Bedford Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2022-12-12 |
| Installation of the New York City Public Observatory, Jerome Park, Goulden Avenue between Bedford Parkway Boulevard West and West 205th Street, Bronx |
Bronx |
DPR |
Landscape architecture |
|
Commented |
2022-12-12 |
| Reconstruction of Rolph Henry Playground, New York Avenue and Clarkson Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
|
Commented |
2022-12-12 |
| Rehabilitation of a comfort station, St. Mary's Park, 450 St. Ann’s Avenue, St. Ann's Avenue at East 145th Street, Bronx |
Bronx |
DPR |
Architecture |
Final |
Commented |
2022-12-12 |
| Reconstruction of Dyckman Marina, Fort Washington Park Greenway and Route 9A at Dyckman Street, Inwood Hill Park, Manhattan |
Manhattan |
DPR |
Landscape architecture |
|
Commented |
2022-12-12 |
| Removal of an interim seating area as part of the construction of a park (Abolitionist Place), Willoughby Street, Duffield Street and Gold Street, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Amended Final |
Approved |
2022-12-12 |
| Conservation of the American Merchant Mariners Memorial (1991) by Marisol, The Battery (formerly Battery Park), Breakwater extension adjacent to Pier A, Manhattan |
Manhattan |
EDC |
Artwork |
Preliminary |
Approved |
2022-12-12 |
| Installation of Emanativ by Eto Otitigbe, Harlem River Greenway as part of the Manhattan Waterfront Greenway, Harlem River Drive between East 125th Street and East 132nd Street, Manhattan |
Manhattan |
EDC |
Artwork |
Preliminary |
Approved |
2022-12-12 |
| Reconstruction of a pier shed and head house for film studios and adjacent site work, Pier 94, 711 12th Avenue between West 52nd Street and West 55th Street, Hudson River, Manhattan |
Manhattan |
EDC |
Architecture |
Final |
Approved with conditions |
2022-12-12 |
| Design of prototypical pipe bollards for installation citywide |
Citywide |
DOT |
Street furniture |
Preliminary and Final |
Approved per delegation |
2022-12-12 |
| Restoration and relocation of The River that Flows Two Ways by Wopo Holup, The Battery, south of State Street and Battery Place, Manhattan |
Manhattan |
EDC |
Artwork |
Preliminary |
Approved |
2022-12-12 |
| Construction of Engine Company 287/Ladder 136/Battalion 46, 86-53 Grand Avenue, Elmhurst, Queens |
Queens |
FDNY |
Architecture |
Final |
Approved |
2022-12-12 |
| Reconstruction of Police Officer Jeff B. Herman Ballfield, McDonald Playground, McDonald Avenue, Avenue S, East 1st Street, and Avenue T, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Approved |
2022-12-12 |
| Reconstruction of the Studio Museum in Harlem, 144 West 125th Street, Manhattan |
Manhattan |
DCLA |
Architecture |
Final |
Commented |
2022-12-12 |
| Reconstruction of Detective Omar Edwards Park, East 124th Street between Second Avenue and Third Avenue, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-12-12 |
| Construction of Box Street Park, including a prototypical comfort station, Commercial Street, Box Street, and Newtown Creek, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Final |
Approved with conditions |
2022-12-12 |
| Installation of louvers, Building 3, 7th Floor, South Street between Seventh Avenue and Eighth Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-12-12 |
| Reconstruction of the 233rd Street Pump Station, Bronx River Parkway southbound on-ramp, south of East 233rd Street, Bronx |
Bronx |
DEP |
Architecture |
Preliminary and Final |
Approved |
2022-12-12 |
| Installation of rooftop mechanical equipment, Engine Company 42, 1781 Monroe Avenue, Bronx |
Bronx |
FDNY |
Building systems & Modifications |
Preliminary and Final |
Commented |
2022-12-12 |
| Construction of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront, Phase III, Kent Avenue between North 9th Street and North 15th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
Commented |
2022-12-12 |
| Installation of an ADA ramp, 150 52nd Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
Approved |
2022-12-12 |
| Construction of a field operations building, adaptive reuse of the former Fluoride Building, and adjacent site work, 601 Midland Avenue, Yonkers |
Upstate |
DEP |
Architecture |
Preliminary |
Approved with conditions |
2022-12-12 |
| Construction of an addition and adjacent site work, Eastern Parkway Library, 1044 Eastern Parkway, Brooklyn |
Brooklyn |
DDC |
Architecture |
Final |
Approved |
2022-12-12 |
| Installation of an electrical box, vent post, and access hatches, Melvin Avenue Pump Station, Melvin Avenue and Wild Avenue, Staten Island |
Staten Island |
DEP |
Architecture |
Preliminary and Final |
Approved |
2022-12-12 |
| Inscription for Gate of the Exonerated, northern perimeter Central Park entrance at 110th Street between Central Park West and Fifth Avenue, Central Park, Manhattan |
Manhattan |
DPR |
Signage |
Preliminary and Final |
Approved |
2022-12-12 |
| Restoration of the landscape, construction of a storage building, and installation of signage and access controls, Gilboa Dam, Schoharie Reservoir, adjacent to Route 990V, Gilboa, Schoharie County |
Upstate |
DEP |
Landscape architecture |
Final |
Approved |
2022-12-12 |
| Relocation of a standpipe, Public Safety Answering Center II (PSAC II), 350 Marconi Street, Bronx |
Bronx |
DCAS |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2022-12-12 |
| Installation of a fire alarm, Flushing Community Library, 41-17 Main Street, Flushing, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2022-12-12 |
| Installation of a rooftop tank, Flushing Community Library, 41-17 Main Street, Flushing, Queens |
Queens |
DDC |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2022-12-12 |
| Construction of an interim park, Pier 42, East River Waterfront between Montgomery Street and Jackson Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary and Final |
Commented |
2022-12-12 |
| Reconstruction of Chief Dennis L. Devlin Park (formerly Olmstead Triangle), Olmstead Avenue, Cross Bronx Service Road, and Ellis Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-12-12 |
| Construction of Biogas Conditioning System and adjacent site work, Newtown Creek Wastewater Treatment Plant, 327 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
Architecture |
|
Commented |
2022-12-12 |
| Design of prototypical pipe bollards for installation citywide |
Citywide |
DOT |
Street furniture |
Amended Final |
|
2022-11-21 |
| Reconstruction of Daniel Boone Playground, West Farms Road, Boone Avenue, and Sheridan Boulevard, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-11-07 |
| Reconstruction of the ballfields, Brigadier General Charles Young Playground, Lenox Avenue, West 145th Street, Harlem River Drive, and West 143rd Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-11-07 |
| Construction of a skate park and adjacent site work, Power Playground, Avenue N, Utica Avenue, Avenue O, and East 49th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
Approved |
2022-11-07 |
| Construction of stairs and a ramp, Bronx Park, Waring Avenue between Bronx River Parkway and Bronx Park East, Bronx |
Bronx |
DPR |
Street furniture |
Preliminary |
Approved |
2022-11-07 |
| Rehabilitation of Gerritsen Beach Branch Library, 2808 Gerritsen Avenue, Brooklyn |
Brooklyn |
DDC |
Architecture |
Preliminary and Final |
Commented |
2022-11-07 |
| Construction of a gate, East River Science Park (Alexandria Center for Life Science), 500 East 30th Street at First Avenue and East 29th Street, Manhattan |
Manhattan |
EDC |
Architecture |
|
Commented |
2022-11-07 |
| Installation of a modular comfort station and adjacent site work, Discovery Playground, Fort Washington Park, Henry Hudson Parkway near West 163rd Street, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary |
Approved |
2022-11-07 |
| Installation of security bollards, Central UTA Satmar School for Boys, 762 Wythe Avenue, Rutledge Street and Penn Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Preliminary and Final |
Approved with conditions |
2022-11-07 |
| Installation of security bollards, Walt Disney Project Galaxy, 310 Hudson Street, Vandam Street, Varick Street, and Spring Street, Manhattan |
Manhattan |
DOT |
Street furniture |
Preliminary and Final |
Approved |
2022-11-07 |
| Construction of a connection chamber as part of the Kensico-Eastview Connection Project, Catskill-Delaware Ultraviolet Treatment Facility, 10 Walker Road, Town of Mount Pleasant, Westchester County |
Upstate |
DEP |
Architecture |
Preliminary |
Approved |
2022-11-07 |
| Removal of a distinctive sidewalk adjacent to Livonia Park, Powell Street, Livonia Avenue, and Junius Street, Brooklyn |
Brooklyn |
DOT |
Distinctive sidewalk |
Preliminary and Final |
Approved |
2022-11-07 |
| Renovation of the Borough Park Library, 1265 43rd Street, Brooklyn |
Brooklyn |
DDC |
Architecture |
Preliminary |
Approved with conditions |
2022-11-07 |
| Completed plaque installation as part of the loan of the Theodore Roosevelt Monument (1940) by James Earle Fraser to the Theodore Roosevelt Presidential Library, Medora, North Dakota |
Manhattan |
DPR |
Artwork |
Final |
Approved |
2022-11-07 |
| Construction of driveway, paths, and adjacent site work, Orchard Beach Maintenance and Operations facility, between Park Drive and the Promenade, Pelham Bay Park, Bronx |
Bronx |
DDC |
Landscape architecture |
Preliminary and Final |
Approved with conditions |
2022-11-07 |
| Construction of a comfort station, Waters Edge Playground, Cross Island Park, Waters Edge Drive and 24th Avenue, Bayside, Queens |
Queens |
DPR |
Architecture |
Preliminary |
Approved |
2022-11-07 |
| Installation of a rooftop mechanical unit, 198 East 161st Street, Bronx |
Bronx |
DCAS |
Building systems & Modifications |
Preliminary and Final |
Approved per delegation |
2022-11-07 |
| Temporary installation of Fearless Girl by Kristen Visbal, Broad Street between Wall Street and Exchange Place, Manhattan |
Manhattan |
DOT |
Artwork |
Preliminary and Final |
Commented |
2022-11-07 |