| Reconstruction of a portion of Bensonhurst Park, 21st Avenue, 21st Drive, Belt Parkway, Bay Parkway, and Cropsey Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
|
2025-11-17 |
| Minor modifications to the pavers for the design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Building systems & Modifications |
Amended Final |
|
2025-11-17 |
| Installation of a carport (Haddads), Kent Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Landscape architecture |
Preliminary and Final |
|
2025-11-17 |
| Construction of an African burial ground memorial landscape, Flatbush African Burial Ground Park, Church Avenue and Bedford Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-11-17 |
| Construction of the Bronx Detention Complex, 745 East 141st Street, Bronx |
Bronx |
DDC/DOC |
Architecture |
Preliminary |
|
2025-11-17 |
| Reconstruction of the Queens Detention Complex, 126-02 82nd Avenue, Kew Gardens, Queens |
Queens |
DDC/DOC |
Architecture |
Preliminary |
|
2025-11-17 |
| Reconstruction of New Lots Branch Library plaza and site work, adjacent to Sankofa Park, 655 New Lots Avenue, Brooklyn |
Brooklyn |
BPL |
Landscape architecture |
Final |
|
2025-11-17 |
| Reconstruction of a playground, Kaiser Park, Neptune Avenue between West 29th Street and West 28th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2025-11-17 |
| Reconstruction of a pedestrian bridge and restoration of the landscape, Willow Lake Preserve, south of Willow Lake between the Grand Central Parkway and Van Wyck Expressway, Flushing Meadows-Corona Park, Flushing, Queens |
Queens |
DEP/DPR/DOT |
Landscape architecture |
Final |
|
2025-11-17 |
| Reconstruction of the sidewalk including the removal of distinctive sidewalks, Grand Army Plaza, Prospect Park, east side of Vanderbilt Avenue between Plaza Street East to The Bend, and west side of Plaza Street East between Eastern Parkway to Vanderbilt Avenue, Brooklyn |
Brooklyn |
DOT |
Landscape architecture |
Preliminary and Final |
|
2025-11-17 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Rockaway Park Municipal Parking Field, 248 Beach 116th Street, Far Rockaway, Queens |
Queens |
DOT |
Street furniture |
Amended Final |
|
2025-11-03 |
| Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Brighton Beach Municipal Parking Field, 3162 Brighton 4th Street, Brooklyn |
Brooklyn |
DOT |
Street furniture |
Amended Final |
|
2025-11-03 |
| Installation of mechanical equipment, Office of the Chief Medical Examiner, 599 Winthrop Street, Brooklyn |
Brooklyn |
DCAS |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Replacement of a retaining wall and fence, 959 Home Street, Bronx |
Bronx |
HPD |
Architecture |
Preliminary and Final |
|
2025-11-03 |
| Installation of mechanical equipment, Engine Company 40, 131 Amsterdam Avenue, Manhattan |
Manhattan |
FDNY |
Architecture |
Preliminary and Final |
|
2025-11-03 |
| Installation of mechanical equipment, Chlorine Contact Tanks, Oakwood Beach Wastewater Resource Recovery Facility, 751 Mill Road, Staten Island |
Staten Island |
DEP |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Replacement of exterior signage (Vertiports), East 34th Street Heliport, 499 East 34th Street at the East River, Manhattan |
Manhattan |
EDC |
Signage |
Preliminary and Final |
|
2025-11-03 |
| Replacement of windows, Hunts Point Food Distribution Center, 600 Food Center Drive, Bronx |
Bronx |
EDC |
Architecture |
Preliminary and Final |
|
2025-11-03 |
| Installation of mechanical equipment, 198 East 161st Street, Bronx |
Bronx |
DCAS |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Installation of a fenced-in planted area, 114 East 198th Street, Bronx |
Bronx |
DOT |
Landscape architecture |
Preliminary and Final |
|
2025-11-03 |
| Installation of mechanical equipment, Office of the Chief Medical Examiner, 160-15 82nd Drive, Jamaica, Queens |
Queens |
DCAS |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Rehabilitation of the roof, Shaft 18, Kensico Reservoir, Westlake Drive, Valhalla, Mount Pleasant, Westchester County |
Upstate |
DEP |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Installation of mechanical equipment, Maspeth Town Hall, 53-37 72nd Street, Maspeth, Queens |
Queens |
DDC/DCAS |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Replacement of garage doors, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 Twelfth Avenue, Manhattan |
Manhattan |
DSNY |
Building systems & Modifications |
Preliminary and Final |
|
2025-11-03 |
| Minor modifications to the installation of streetscape improvements, Water Street between Whitehall Street and Hanover Square, Manhattan |
Manhattan |
DOT/EDC/DPR |
Landscape architecture |
Amended Final |
|
2025-10-21 |
| Construction of a public restroom building, Fort Independence Playground, West 238th Street and Sedgwick Avenue, Bronx |
Bronx |
DPR |
Architecture |
Preliminary |
|
2025-10-21 |
| Reconstruction of Eae J. Mitchell Park, East 174th Street and Longfellow Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
|
2025-10-21 |
| Installation of an interpretive sign between Randall's Island Field #51 and Wards Island Wastewater Resource Recovery Facility, Hell Gate Circle between C Road and 2nd Drive, Randall’s Island, Manhattan |
Manhattan |
DEP/DPR |
Signage |
Preliminary and Final |
|
2025-10-21 |
| Installation of lighting, Grand Army Plaza, Central Park, West 59th Street, Fifth Avenue, and West 59th Street, Manhattan |
Manhattan |
DPR/CPC |
Distinctive lighting |
Preliminary and Final |
|
2025-10-21 |
| Reconstruction of Caserta Playground and installation of a subsurface detention system as a part of the Cloudburst Management Program for the Parkchester and Morris Park Cloudburst Hub, Odell Street, St. Raymond Avenue, and Purdy Street, Bronx |
Bronx |
DEP/DPR |
Landscape architecture |
Final |
|
2025-10-21 |
| Reconstruction of Fort Independence Playground, West 238th Street and Sedgwick Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Preliminary |
|
2025-10-21 |
| Installation of interpretive signage as part of the construction of a bioretention median, Beach 67th Street and Thursby Avenue, Arverne, Queens |
Queens |
DEP/DOT |
Signage |
Preliminary and Final |
|
2025-10-21 |
| Installation of interpretive signage as part of the construction of a bioretention median, Hillside Avenue and Manor Road, Queens Village, Queens |
Queens |
DEP/DOT |
Signage |
Preliminary and Final |
|
2025-10-21 |
| Construction of an addition to the Return and Waste Sludge Building and rehabilitation of the Final Settling Tanks, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
Architecture |
Preliminary and Final |
|
2025-10-21 |
| Modifications to the construction of operations facility buildings, control chamber, and adjacent site work as part of upgrade of Hillview Reservoir, 100 Central Park Avenue, Yonkers, Westchester County |
Upstate |
DEP |
Building systems & Modifications |
Amended Final |
|
2025-10-21 |
| Reconstruction of Peter Minuit Playground, adjacent to P.S. 108, Park Avenue between East 108th Street and East 109th Street, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Preliminary |
|
2025-10-21 |
| Installation of interpretive signage as part of the construction of two bioretention triangles, Winchester Boulevard at 234th Street and Hillside Avenue and at 236th Street and Seward Avenue, Queens Village, Queens |
Queens |
DEP/DOT |
Signage |
Preliminary and Final |
|
2025-10-21 |
| Installation of rooftop mechanical equipment, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 Twelfth Avenue, Manhattan |
Manhattan |
DSNY |
Building systems & Modifications |
Preliminary and Final |
|
2025-10-21 |
| Installation of pipe bollards and a raised crosswalk, Broadway and Bennett Avenue, Manhattan |
Manhattan |
DDC/DOT |
Landscape architecture |
Preliminary and Final |
|
2025-10-21 |
| Reconstruction of a boiler building, Building 41A, Washington Avenue and 4th Street Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Preliminary |
|
2025-10-21 |
| Modifications to the installation of Un(Common) Grounds (previously Un(Common) Threads) by Borinquen Gallo, 40th Police Precinct, East 149th Street and St. Ann's Avenue, Bronx |
Bronx |
DCLA%/DDC/NYPD |
Artwork |
Amended Preliminary |
|
2025-10-21 |
| Installation of pipe bollards and a raised crosswalk, Utica Avenue and Winthrop Street, Brooklyn |
Brooklyn |
DDC/DOT |
Landscape architecture |
Preliminary and Final |
|
2025-10-21 |
| Installation of a building signage system as part of the construction of a residential building, streetscape, and plazas, 126th Street and Roosevelt Avenue, Willets Point, Corona, Queens |
Queens |
EDC |
Signage |
Preliminary and Final |
|
2025-10-21 |
| Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Architecture |
Final |
|
2025-10-21 |
| Construction of a truck garage and canopy, Queens Repair Facility, 106-36 180th Street, Queens |
Queens |
DEP |
Architecture |
Final |
|
2025-10-21 |
| Design of a master plan for the construction of Metropolitan Park (Queens Future), including the construction of a gaming facility, resort, retail, and events complex, parking structures, the reconstruction of Shea Road, and adjacent site work, Roosevelt Avenue, between Grand Central Parkway and Seaver Way, and between the MTA New York City Transit Corona Maintenance Yard and the Whitestone Expressway, adjacent to Citi Field, Corona, Queens |
Queens |
EDC/DPR |
Architecture |
Preliminary |
|
2025-10-21 |
| Reconstruction of an addition, including the installation of mechanical equipment, Engine Company 96, 1689 Story Avenue, Bronx |
Bronx |
FDNY |
Building systems & Modifications |
Preliminary and Final |
|
2025-10-21 |
| Reconstruction of the southern shoreline, including construction of outlooks and pathways, Barretto Point Park, Barretto Street and Ryawa Avenue, Bronx |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2025-10-21 |
| Installation of tenant signage (Club Pilates) as part of a mixed-used development (Lighthouse Point), 5 Bay Street, Staten Island |
Staten Island |
EDC |
Signage |
Preliminary and Final |
|
2025-10-21 |
| Construction of an open space, East 34th Street and FDR Drive, Manhattan |
Manhattan |
EDC/DPR |
Landscape architecture |
Preliminary and Final |
|
2025-10-21 |