Reconstruction of a portion of Bensonhurst Park, 21st Avenue, 21st Drive, Belt Parkway, Bay Parkway, and Cropsey Avenue, Brooklyn Brooklyn DPR Landscape architecture Final 2025-11-17
Minor modifications to the pavers for the design of a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens Queens EDC Building systems & Modifications Amended Final 2025-11-17
Installation of a carport (Haddads), Kent Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Landscape architecture Preliminary and Final 2025-11-17
Construction of an African burial ground memorial landscape, Flatbush African Burial Ground Park, Church Avenue and Bedford Avenue, Brooklyn Brooklyn DPR Landscape architecture Preliminary 2025-11-17
Construction of the Bronx Detention Complex, 745 East 141st Street, Bronx Bronx DDC/DOC Architecture Preliminary 2025-11-17
Reconstruction of the Queens Detention Complex, 126-02 82nd Avenue, Kew Gardens, Queens Queens DDC/DOC Architecture Preliminary 2025-11-17
Reconstruction of New Lots Branch Library plaza and site work, adjacent to Sankofa Park, 655 New Lots Avenue, Brooklyn Brooklyn BPL Landscape architecture Final 2025-11-17
Reconstruction of a playground, Kaiser Park, Neptune Avenue between West 29th Street and West 28th Street, Brooklyn Brooklyn DPR Landscape architecture Preliminary 2025-11-17
Reconstruction of a pedestrian bridge and restoration of the landscape, Willow Lake Preserve, south of Willow Lake between the Grand Central Parkway and Van Wyck Expressway, Flushing Meadows-Corona Park, Flushing, Queens Queens DEP/DPR/DOT Landscape architecture Final 2025-11-17
Reconstruction of the sidewalk including the removal of distinctive sidewalks, Grand Army Plaza, Prospect Park, east side of Vanderbilt Avenue between Plaza Street East to The Bend, and west side of Plaza Street East between Eastern Parkway to Vanderbilt Avenue, Brooklyn Brooklyn DOT Landscape architecture Preliminary and Final 2025-11-17
Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Rockaway Park Municipal Parking Field, 248 Beach 116th Street, Far Rockaway, Queens Queens DOT Street furniture Amended Final 2025-11-03
Minor modifications to the installation of electric vehicle chargers (PowerCharge) including an electrical switchgear enclosure, Brighton Beach Municipal Parking Field, 3162 Brighton 4th Street, Brooklyn Brooklyn DOT Street furniture Amended Final 2025-11-03
Installation of mechanical equipment, Office of the Chief Medical Examiner, 599 Winthrop Street, Brooklyn Brooklyn DCAS Building systems & Modifications Preliminary and Final 2025-11-03
Replacement of a retaining wall and fence, 959 Home Street, Bronx Bronx HPD Architecture Preliminary and Final 2025-11-03
Installation of mechanical equipment, Engine Company 40, 131 Amsterdam Avenue, Manhattan Manhattan FDNY Architecture Preliminary and Final 2025-11-03
Installation of mechanical equipment, Chlorine Contact Tanks, Oakwood Beach Wastewater Resource Recovery Facility, 751 Mill Road, Staten Island Staten Island DEP Building systems & Modifications Preliminary and Final 2025-11-03
Replacement of exterior signage (Vertiports), East 34th Street Heliport, 499 East 34th Street at the East River, Manhattan Manhattan EDC Signage Preliminary and Final 2025-11-03
Replacement of windows, Hunts Point Food Distribution Center, 600 Food Center Drive, Bronx Bronx EDC Architecture Preliminary and Final 2025-11-03
Installation of mechanical equipment, 198 East 161st Street, Bronx Bronx DCAS Building systems & Modifications Preliminary and Final 2025-11-03
Installation of a fenced-in planted area, 114 East 198th Street, Bronx Bronx DOT Landscape architecture Preliminary and Final 2025-11-03
Installation of mechanical equipment, Office of the Chief Medical Examiner, 160-15 82nd Drive, Jamaica, Queens Queens DCAS Building systems & Modifications Preliminary and Final 2025-11-03
Rehabilitation of the roof, Shaft 18, Kensico Reservoir, Westlake Drive, Valhalla, Mount Pleasant, Westchester County Upstate DEP Building systems & Modifications Preliminary and Final 2025-11-03
Installation of mechanical equipment, Maspeth Town Hall, 53-37 72nd Street, Maspeth, Queens Queens DDC/DCAS Building systems & Modifications Preliminary and Final 2025-11-03
Replacement of garage doors, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 Twelfth Avenue, Manhattan Manhattan DSNY Building systems & Modifications Preliminary and Final 2025-11-03
Minor modifications to the installation of streetscape improvements, Water Street between Whitehall Street and Hanover Square, Manhattan Manhattan DOT/EDC/DPR Landscape architecture Amended Final 2025-10-21
Construction of a public restroom building, Fort Independence Playground, West 238th Street and Sedgwick Avenue, Bronx Bronx DPR Architecture Preliminary 2025-10-21
Reconstruction of Eae J. Mitchell Park, East 174th Street and Longfellow Avenue, Bronx Bronx DPR Landscape architecture Preliminary 2025-10-21
Installation of an interpretive sign between Randall's Island Field #51 and Wards Island Wastewater Resource Recovery Facility, Hell Gate Circle between C Road and 2nd Drive, Randall’s Island, Manhattan Manhattan DEP/DPR Signage Preliminary and Final 2025-10-21
Installation of lighting, Grand Army Plaza, Central Park, West 59th Street, Fifth Avenue, and West 59th Street, Manhattan Manhattan DPR/CPC Distinctive lighting Preliminary and Final 2025-10-21
Reconstruction of Caserta Playground and installation of a subsurface detention system as a part of the Cloudburst Management Program for the Parkchester and Morris Park Cloudburst Hub, Odell Street, St. Raymond Avenue, and Purdy Street, Bronx Bronx DEP/DPR Landscape architecture Final 2025-10-21
Reconstruction of Fort Independence Playground, West 238th Street and Sedgwick Avenue, Bronx Bronx DPR Landscape architecture Preliminary 2025-10-21
Installation of interpretive signage as part of the construction of a bioretention median, Beach 67th Street and Thursby Avenue, Arverne, Queens Queens DEP/DOT Signage Preliminary and Final 2025-10-21
Installation of interpretive signage as part of the construction of a bioretention median, Hillside Avenue and Manor Road, Queens Village, Queens Queens DEP/DOT Signage Preliminary and Final 2025-10-21
Construction of an addition to the Return and Waste Sludge Building and rehabilitation of the Final Settling Tanks, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn Brooklyn DEP Architecture Preliminary and Final 2025-10-21
Modifications to the construction of operations facility buildings, control chamber, and adjacent site work as part of upgrade of Hillview Reservoir, 100 Central Park Avenue, Yonkers, Westchester County Upstate DEP Building systems & Modifications Amended Final 2025-10-21
Reconstruction of Peter Minuit Playground, adjacent to P.S. 108, Park Avenue between East 108th Street and East 109th Street, Manhattan Manhattan DPR Landscape architecture Preliminary 2025-10-21
Installation of interpretive signage as part of the construction of two bioretention triangles, Winchester Boulevard at 234th Street and Hillside Avenue and at 236th Street and Seward Avenue, Queens Village, Queens Queens DEP/DOT Signage Preliminary and Final 2025-10-21
Installation of rooftop mechanical equipment, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 Twelfth Avenue, Manhattan Manhattan DSNY Building systems & Modifications Preliminary and Final 2025-10-21
Installation of pipe bollards and a raised crosswalk, Broadway and Bennett Avenue, Manhattan Manhattan DDC/DOT Landscape architecture Preliminary and Final 2025-10-21
Reconstruction of a boiler building, Building 41A, Washington Avenue and 4th Street Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Building systems & Modifications Preliminary 2025-10-21
Modifications to the installation of Un(Common) Grounds (previously Un(Common) Threads) by Borinquen Gallo, 40th Police Precinct, East 149th Street and St. Ann's Avenue, Bronx Bronx DCLA%/DDC/NYPD Artwork Amended Preliminary 2025-10-21
Installation of pipe bollards and a raised crosswalk, Utica Avenue and Winthrop Street, Brooklyn Brooklyn DDC/DOT Landscape architecture Preliminary and Final 2025-10-21
Installation of a building signage system as part of the construction of a residential building, streetscape, and plazas, 126th Street and Roosevelt Avenue, Willets Point, Corona, Queens Queens EDC Signage Preliminary and Final 2025-10-21
Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan Manhattan DPR Architecture Final 2025-10-21
Construction of a truck garage and canopy, Queens Repair Facility, 106-36 180th Street, Queens Queens DEP Architecture Final 2025-10-21
Design of a master plan for the construction of Metropolitan Park (Queens Future), including the construction of a gaming facility, resort, retail, and events complex, parking structures, the reconstruction of Shea Road, and adjacent site work, Roosevelt Avenue, between Grand Central Parkway and Seaver Way, and between the MTA New York City Transit Corona Maintenance Yard and the Whitestone Expressway, adjacent to Citi Field, Corona, Queens Queens EDC/DPR Architecture Preliminary 2025-10-21
Reconstruction of an addition, including the installation of mechanical equipment, Engine Company 96, 1689 Story Avenue, Bronx Bronx FDNY Building systems & Modifications Preliminary and Final 2025-10-21
Reconstruction of the southern shoreline, including construction of outlooks and pathways, Barretto Point Park, Barretto Street and Ryawa Avenue, Bronx Queens DPR Landscape architecture Preliminary 2025-10-21
Installation of tenant signage (Club Pilates) as part of a mixed-used development (Lighthouse Point), 5 Bay Street, Staten Island Staten Island EDC Signage Preliminary and Final 2025-10-21
Construction of an open space, East 34th Street and FDR Drive, Manhattan Manhattan EDC/DPR Landscape architecture Preliminary and Final 2025-10-21