Projects (5,221)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Reconstruction of St. Michael's Playground, adjacent to the Brooklyn-Queens Expressway between 30th Avenue and 31st Avenue, Astoria, Queens Queens DPR Landscape architecture Final 2026-01-20
Installation of a rooftop mechanical enclosure and equipment, Brooklyn Children's Museum, 145 Brooklyn Avenue, Brooklyn Brooklyn DDC/DCLA Building systems & Modifications Preliminary and Final 2026-01-20
Reconstruction of a retaining wall, Crotona Park, Southern Boulevard between Crotona Park East and East 175th Street, Bronx Bronx DPR Landscape architecture Preliminary and Final 2026-01-20
Construction of an interim prefabricated training facility, including adjacent sitework, 8 Reilly Boulevard, Randall's Island, Manhattan Manhattan FDNY Architecture Preliminary and Final 2026-01-20
Reconstruction of Colden Playground, adjacent to P.S. 214, Union Street between 31st Drive and 31st Road, Flushing, Queens Queens DPR Landscape architecture Final 2026-01-20
Construction of a restaurant, parking lot, and adjacent site work, 2 Soundview Avenue, Clason Point Park, Bronx River Avenue, East River, Bronx Bronx DPR Architecture Final 2026-01-20
Installation of sports lighting at tennis courts, McCarren Park, Bedford Avenue, North 12th Street, and Berry Street, Brooklyn Brooklyn DPR Landscape architecture Preliminary and Final 2026-01-08
Installation of rooftop mechanical equipment and skylights, Main Building, Oakwood Beach Wastewater Resource Recovery Facility, 751 Mill Road, Staten Island Staten Island DEP Building systems & Modifications Preliminary and Final 2026-01-08
Installation of a conduit and electrical equipment, North Aeration Tanks, Bowery Bay Wastewater Resource Recovery Facility, 43-01 Berrian Boulevard, Queens Queens DEP Building systems & Modifications Preliminary and Final 2026-01-08
Minor modifications to the generator enclosure, rooftop guardrails, and electrical equipment, as part of the construction of a recreation center (Shirley Chisholm Recreation Center) and adjacent site work, 3002 Foster Avenue between Nostrand Avenue and New York Avenue, Brooklyn Brooklyn DDC/DPR Building systems & Modifications Amended Final 2026-01-08
Installation of an electrical cabinet, Prospect Park, Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Brooklyn Brooklyn DPR Building systems & Modifications Preliminary and Final 2026-01-08
Reconstruction of a playground, Walker Park, Davis Avenue between Delafield Place and Livingston Court, Staten Island Staten Island DPR Landscape architecture Final 2025-12-15
Construction of a skate park, Soundview Park, Metcalf Avenue between Seward Avenue and Randall Avenue, Bronx Bronx DPR Landscape architecture Preliminary 2025-12-15
Construction of a shared street and plaza (Broadway Boulevard Plaza), Broadway between West 38th Street and West 40th Street, as part of the master plan for the reconstruction of Broadway (Broadway Vision Plan), Manhattan Manhattan DDC/DOT Landscape architecture Preliminary 2025-12-15
Installation of To Fly by Tatyana Fazlalizadeh, Horizon Juvenile Center, 560 Brooke Avenue, Bronx Bronx DCLA%/DDC/ACS Artwork Conceptual 2025-12-15
Rehabilitation of the St. James Recreation Center, St. James Park, 2530 Jerome Avenue, Bronx Bronx DPR Architecture Preliminary 2025-12-15
Construction of Jamaica Station Plaza, Archer Avenue between 146th Street and 147th Place, Jamaica, Queens Queens EDC/DOT Landscape architecture Final 2025-12-15
Construction of a prefabricated EMS training facility, 423 Abbot Road, Fort Totten, Bayside, Queens Queens FDNY Architecture Preliminary 2025-12-15
Installation of sports lighting, Inwood Hill Park, softball field adjacent to Inwood Hill Nature Center, West 218th Street and Indian Road, Manhattan Manhattan DPR Landscape architecture Preliminary 2025-12-15
Reconstruction of ABC Playground, adjacent to P.S. 20 (Anna Silver School), East Houston Street, Essex Street, and Norfolk Street, Manhattan Manhattan DPR Landscape architecture Preliminary 2025-12-15
Reconstruction of Sobel Court Park, Targee Street, Vanderbilt Avenue, and Bowen Street, Staten Island Staten Island DPR Landscape architecture Preliminary 2025-12-15
Construction of an ADA path, reading terrace, and adjacent site work, Richmond Hill Community Library, 118-14 Hillside Avenue, Richmond Hill, Queens Queens DDC/QPL Landscape architecture Final 2025-12-15
Modifications to the Port Jervis Wastewater Treatment Plant, 46 North Maple Avenue, Port Jervis, Orange County Upstate DEP Architecture Amended Final 2025-12-15
Construction of a public restroom building and adjacent site work, Kissena Park, Parsons Boulevard and Booth Memorial Avenue, Flushing, Queens Queens DDC/DPR Architecture Preliminary and Final 2025-12-15
Installation of an electric vehicle charger, Building 292, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn Brooklyn BNYDC Building systems & Modifications Preliminary and Final 2025-12-15
Construction of a public restroom building and adjacent site work, Brookville Park, 232nd Street and 144th Avenue, Rosedale, Queens Queens DDC/DPR Architecture Preliminary and Final 2025-12-15
Installation of a prototypical automatic public toilet (APT), 12th Avenue between 125th Street and St. Clair Place, Manhattan Manhattan DOT Street furniture Preliminary and Final 2025-12-15
Construction of a public restroom building, Van Cortlandt Park, Broadway and West 252nd Street, Bronx Bronx DDC/DPR Architecture Preliminary and Final 2025-12-15
Minor modifications to the installation of an ADA ramp and adjacent site work, 80 Centre Street, Manhattan Manhattan DDC/DOT Building systems & Modifications Amended Final 2025-12-01
Installation of a fenced-in area, 350 East 69th Street, Manhattan Manhattan DOT Landscape architecture Preliminary and Final 2025-12-01
Installation of a generator, Engine Company 320, 36-18 Francis Lewis, Flushing, Queens Queens FDNY Building systems & Modifications Preliminary and Final 2025-12-01
Reconstruction of the roof, Manhattan Criminal Court, 100 Centre Street, Manhattan Manhattan DCAS Building systems & Modifications Preliminary and Final 2025-12-01
Minor modifications to the construction of an ADA ramp, 43-01 22nd Street, Long Island City, Queens Queens DOT Building systems & Modifications Amended Final 2025-12-01
Minor modifications to the rehabilitation of the Richmond Hill Community Library, 118-14 Hillside Avenue, Richmond Hill, Queens Queens DDC/QPL Architecture Amended Final 2025-12-01
Minor modifications to the reconstruction of a retaining wall and adjacent site work, East 236th Street, Bronx Boulevard, East 233rd Street, and Bronx River Parkway, Bronx Bronx DPR Landscape architecture Amended Final 2025-12-01
Installation of a carport (Haddads), Kent Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BNYDC Landscape architecture Preliminary and Final 2025-11-17
Reconstruction of New Lots Branch Library plaza and site work, adjacent to Sankofa Park, 655 New Lots Avenue, Brooklyn Brooklyn BPL Landscape architecture Final 2025-11-17
Reconstruction of the Queens Detention Complex, 126-02 82nd Avenue, Kew Gardens, Queens Queens DDC/DOC Architecture Preliminary 2025-11-17
Construction of an African burial ground memorial landscape, Flatbush African Burial Ground Park, Church Avenue and Bedford Avenue, Brooklyn Brooklyn DPR Landscape architecture Preliminary 2025-11-17
Construction of a compost facility and education building, Lower East Side Ecology Center, East River Park, FDR Drive between Jackson Street and Cherry Street, Manhattan Manhattan DDC/DPR Landscape architecture Preliminary 2025-11-17
Construction of the Bronx Detention Complex, 745 East 141st Street, Bronx Bronx DDC/DOC Architecture Preliminary 2025-11-17
Construction of a storefront (Kingbridge) and adjacent site work, 209 Brooklyn Navy Yard (formerly Building 275), 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn BYNDC Architecture Final 2025-11-17
Reconstruction of a playground, Kaiser Park, Neptune Avenue between West 29th Street and West 28th Street, Brooklyn Brooklyn DPR Landscape architecture Preliminary 2025-11-17
Construction of Willoughby Playground, adjacent to P.S. 23K, Willoughby Avenue, Tompkins Avenue, and Vernon Avenue, Brooklyn Brooklyn DPR Landscape architecture Preliminary 2025-11-17
Reconstruction of the sidewalk including the removal of distinctive sidewalks, Grand Army Plaza, Prospect Park, east side of Vanderbilt Avenue between Plaza Street East to The Bend, and west side of Plaza Street East between Eastern Parkway to Vanderbilt Avenue, Brooklyn Brooklyn DOT Landscape architecture Preliminary and Final 2025-11-17
Modifications to the installation of I Am Protected by Jazmine Hayes, Brownsville Multiservice Center and Community Hub (previously Brownsville Youth Empowerment Center and Community Hub), 444 Thomas S. Boyland Street between East New York Avenue and Pitkin Avenue, Brooklyn Brooklyn DCLA%/DDC Artwork Amended Preliminary 2025-11-17
Construction of a public restroom building and adjacent site work, East River Park, Grand Street and FDR Drive, Manhattan Manhattan DDC/DPR Landscape architecture Preliminary and Final 2025-11-17
Construction of a public restroom building and adjacent site work, Murphy Brothers Playground, Avenue C and FDR Drive, Manhattan Manhattan DDC/DPR Landscape architecture Preliminary and Final 2025-11-17
Replacement of two flood light poles, Sludge Pier, Red Hook Wastewater Resource Recovery Facility, West Street and Little Street, Brooklyn Navy Yard Industrial Park, Brooklyn Brooklyn DEP Building systems & Modifications Preliminary and Final 2025-11-17
Reconstruction of a staircase and elevator, High Line Park, West 16th Street and Tenth Avenue, Manhattan Manhattan DPR Landscape architecture Preliminary and Final 2025-11-17