| Installation of an emergency generator, Engine Company 163/Ladder 83, 875 Jewett Avenue, Staten Island |
|
|
|
|
|
|
| Installation of rooftop mechanical equipment and adjacent site work, FDNY Dispatch Operations Communications Office, 65 Slosson Avenue within Clove Lakes Park, Staten Island |
|
|
|
|
|
|
| Installation of an automated material handler (AMH) and prototypical signage, Bay Terrace Community Library, 18-36 Bell Boulevard, Queens |
|
|
|
|
|
|
| Installation of an automated material handler (AMH) and prototypical signage, East Flushing Community Library, 196-36 Northern Boulevard, Queens |
|
|
|
|
|
|
| Installation of an automated material handler (AMH) and prototypical signage, Hollis Community Library, 202-05 Hillside Avenue, Queens |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 210 West 50th Street, southwest corner of West 50th Street and Broadway, Manhattan |
|
|
|
|
|
|
| Reconstruction of the West 68th Street (Tots) Playground, Central Park West between West 67th Street and West 68th Street, Central Park, Manhattan |
|
|
|
|
|
|
| Installation of rooftop photovoltaic panels, St. Mary’s Recreation Center, 450 St. Ann’s Avenue, Bronx |
|
|
|
|
|
|
| Installation of a louver, P.S. 1 Contemporary Art Center, 46-01 21st Street, Queens |
|
|
|
|
|
|
| Reconstruction of Roberto Clemente Plaza, Third Avenue, East 147th Street, East 149th Street and Willis Avenue, Bronx |
|
|
|
|
|
|
| Reconstruction of the courtyard, Soundview Branch Library, 660 Soundview Avenue, Bronx |
|
|
|
|
|
|
| Construction of a total residual chlorine reduction building, Coney Island Waste Water Treatment Plant, 2591 Knapp Street, Brooklyn |
|
|
|
|
|
|
| Rehabilitation of Gatehouse No. 2, New Croton Dam Outlet Works, Cortlandt, Westchester County |
|
|
|
|
|
|
| Design of a kiosk as part of the prototypical bike share station for installation citywide |
|
|
|
|
|
|
| Construction of a fenced-in planted area, 135 Conselyea Street, Brooklyn |
|
|
|
|
|
|
| Repainting of the Westchester Avenue Bridge over the Hutchinson River Parkway, Bronx |
|
|
|
|
|
|
| Repainting of the Riverside Drive Viaduct from West 125th Street to West 138th Street, including the West 134th Street spur, Manhattan |
|
|
|
|
|
|
| Installation of signage, Alianza Dominicana, 1112 St. Nicholas Avenue at Audubon Avenue and 166th Street, Manhattan |
|
|
|
|
|
|
| Rehabilitation of Engine Company 331/Ladder 173, 158-57 Cross Bay Boulevard, Howard Beach, Queens |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 100 Church Street, southwest corner of Park Place and Church Street, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 5581 Broadway, northwest corner of Broadway and West 231st Street, Bronx |
|
|
|
|
|
|
| Installation of a prototypical newsstand, One Park Avenue, southeast corner of East 33rd Street and Park Avenue South, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 290 West 125th Street, northeast corner West 125th Street and Frederick Douglass Boulevard, Manhattan |
|
|
|
|
|
|
| Installation of a ramp, Queens Supreme Courthouse, 88-11 Sutphin Boulevard, Jamaica, Queens |
|
|
|
|
|
|
| Modifications to the landscape as part of the construction of a maintenance and operations facility and adjacent site work, Orchard Beach, between Park Drive and the Promenade, Pelham Bay Park, Bronx |
|
|
|
|
|
|
| Construction of an electrical distribution building and adjacent site work, New Clove Pumping Station, 1270 Victory Boulevard, Staten Island |
|
|
|
|
|
|
| Reconstruction of the bypass facility, East Delaware Tunnel Outlet, Rondout Reservoir, 1229 Route 55A, Sullivan County |
|
|
|
|
|
|
| Design of prototypical package lockers (LockerNYC) as a pilot for installation citywide |
|
|
|
|
|
|
| Construction of flood protection measures as part of the North-West Battery Park City Resiliency master plan, West Street between Chambers Street and North Moore Street, Manhattan |
|
|
|
|
|
|
| Conversion of Building 269 into a fish processing center, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
|
|
|
|
|
|
| Construction of two pavilions, Native Plant Garden, New York Botanical Garden, 2900 Southern Boulevard, Bronx |
|
|
|
|
|
|
| Installation of an artwork by Matthew Geller, Myrtle Avenue Plaza, Myrtle Avenue between Hall Street and Emerson Place, Brooklyn |
|
|
|
|
|
|
| Installation of an artwork by Xu Bing, Forsyth Plaza, Canal Street, Forsyth Street, and the Manhattan Bridge approach ramp, Manhattan |
|
|
|
|
|
|
| Reconstruction of Forsyth Plaza, Canal Street, Forsyth Street and the Manhattan Bridge approach ramp, Manhattan |
|
|
|
|
|
|
| Construction of an addition, East Elmhurst (formerly North Beach) Community Library, 95-08 Astoria Boulevard, Queens |
|
|
|
|
|
|
| Installation of rooftop photovoltaic panels, Engine Company 320, 36-18 Francis Lewis Boulevard, Queens |
|
|
|
|
|
|
| Installation of rooftop mechanical equipment, Dormitory K, Anna M. Kross Center, 18-18 Hazen Street, Rikers Island, Bronx |
|
|
|
|
|
|
| Design of a prototypical water quality monitoring station for installation above City Water Tunnel 3, Manhattan |
|
|
|
|
|
|
| Construction of a greenway, New Springville, Richmond Avenue, Travis Avenue and Park Drive North between Arthur Kill Road and Signs Road, adjacent to La Tourette Park, Fresh Kills Park and the William T. Davis Wildlife Refuge, Staten Island |
|
|
|
|
|
|
| Relocation of the 9/11 Eternal Flame from the Eisenhower Mall to the south lawn across from the Steps of Remembrance, Battery Park, Manhattan |
|
|
|
|
|
|
| Restoration of the grotto, steps and paths, Alpine Garden, Fort Tryon Park, adjacent to the Cloisters Museum, Manhattan |
|
|
|
|
|
|
| Installation of adult exercise equipment, John Jay Park, Cherokee Place between East 76th Street and East 78th Street, Manhattan |
|
|
|
|
|
|
| Site preparation for the construction of High Line Park (formerly elevated rail line), Phase IIIA, West 30th Street between 10th Avenue and 12th Avenue, Manhattan |
|
|
|
|
|
|
| Reconstruction of the West 68th Street (Tots) Playground, Central Park West between West 67th Street and West 68th Street, Central Park, Manhattan |
|
|
|
|
|
|
| Construction of a studio lot, including two gates and a guard booth, Kaufman- Astoria Studios, 36th Street between 34th Avenue and 35th Avenue, Queens |
|
|
|
|
|
|
| Installation of three donor plaques, Hell Gate Pathway North, Hell Gate Pathway South, and Sunken Meadow Pathway, Randall’s Island Park, Manhattan |
|
|
|
|
|
|
| Reconstruction of Fox Square, Flatbush Avenue and Fulton Street, Brooklyn |
|
|
|
|
|
|
| Installation of an emergency generator, Engine Company 211, 16 Hooper Street, Brooklyn |
|
|
|
|
|
|
| Design of a prototypical automated material handler (AMH) canopy, Queens Library, Queens, Borough-wide |
|
|
|
|
|
|
| Construction of a skate park, Broad Channel American Park, Cross Bay Boulevard, West 22nd Street, Shad Creek Road, and West 20th Street, Broad Channel, Queens |
|
|
|
|
|
|