Projects (8,439)

Filter & Sort
ProjectBoroughAgencyTypeStageResultLast Seen
Design of My Urban Sky (2010) by Jen Magathan as a prototype for installation on construction fences, sidewalk sheds, supported scaffolds and cocoon systems citywide, Urban Canvas Design Competition
Construction of a waterfront park, Bush Terminal Piers, Phase II, including the construction of a comfort station, Marginal Street between 42nd Street and 51st Street at the East River, Brooklyn
Reconstruction of Steeplechase Plaza, including the construction of a pavilion to house the B&B Carousell (1919), Riegelmann (Coney Island) Boardwalk, West 16th Street to West 19th Street, Brooklyn
Construction of interim site work as part of Phase IA of the construction of CityPoint, One DeKalb Avenue, Albee Square, Brooklyn
Installation of vehicular wayfinding signage, Hunts Point Cooperative Market, Bronx
Conservation of Alice and Friends at the Central Park Zoo (1938) by Abram Champanier, Lincoln Hospital Center, 234 East 149th Street, Bronx
Installation of prototypical signage, Bayside Community Library, 214-20 Northern Boulevard, Queens
Installation of prototypical signage and an automated material handler (AMH), Corona Community Library, 38-23 104th Street, Corona, Queens
Reconstruction of Harper Street Yard, including the construction of a diesel monitoring booth and diesel pump station, 32-11 Harper Street, Queens
Construction of Stages 10-15, Steiner Studios, Brooklyn Navy Yard Industrial Park, 3 Welding Road, Brooklyn
Rehabilitation of a clubhouse and construction of a maintenance building and a concession stand, Van Cortlandt Golf Course, Van Cortlandt Park, Bronx
Installation of a sculpture by Alison Sky, East Portal, 161st Street and the Grand Concourse, Bronx
Installation of Inhale/Exhale and Independent Lines by Monika Goetz, 122 Community Center, 150 First Avenue, Manhattan
Construction of a comfort station and adjacent site work as Phase I of the reconstruction of Ocean (P.S. 197) Playground, Beach Eighth Street, Lannett Avenue and Beach Ninth Street, Queens
Rehabilitation of a comfort station, Banneker (P.S. 256) Playground, Marcy Avenue between Lafayette Avenue and Kosciusko Street, Brooklyn
Rehabilitation of a comfort station, Tilden Playground, East 48th Street, East 49th Street and Tilden Avenue, Brooklyn
Construction of a tot lot, Joseph T. McGuire Park, Bergen Avenue, Avenue X and Avenue V, Brooklyn
Reconstruction of Ocean (P.S. 197) Playground, including the construction of a comfort station, Beach Eighth Street, Lannett Avenue and Beach Ninth Street, Queens
Installation of a prototypical newsstand, 1401 Sixth Avenue, northwest corner of West 57th Street and Sixth Avenue, Manhattan
Conservation of Music (1939) by Louis Schanker, including the installation of a display enclosure, David N. Dinkins Manhattan Municipal Building (formerly located within the WNYC Office), One Centre Street, Manhattan
Installation of Diamond Matrix by Erwin Redl, NYPD training facility, College Point Boulevard, 28th Avenue, Ulmer Street, Queens
Installation of an artwork by Paul Villinski, Ocean Breeze Park, Quintard Street, Mason Avenue and Father Capodanno Boulevard, Staten Island
Conservation of the federal measure plaque (ca. 1812), architect plaque (ca. 1812), building committee plaque (ca. 1812) and commemorative plaque (1903), basement, City Hall, Manhattan
Construction of a temporary electrical generator, Port Richmond Water Pollution Control Plant 1801 Richmond Terrace, Staten Island
Installation of an Automated Meter Reading utility pole, Eltonville Pump Station, Arthur Kill Road at Brookfield Avenue, Staten Island
Installation of an Automated Meter Reading utility pole, Water Tank Storage 32, 227th Street, 145th Avenue, 228th Street and 145th Road, Queens
Installation of an Automated Meter Reading utility pole, Water Tank Storage 31, 130th Avenue, 144th Street, 133rd Avenue and 145th Street, Queens
Installation of an Automated Meter Reading utility pole, Pump Station 3, 120th Street, 109th Avenue, 121st Street and 111th Avenue, Queens
Installation of an Automated Meter Reading utility pole, Pump Station 11, 143rd Street, 111th Avenue, 142nd Street and Linden Boulevard, Queens
Construction of a stoop and planted area, 420 State Street, Brooklyn
Reconstruction of Orville & Wilbur (P.S. 28 Wright Brothers) Playground, St. Nicholas Avenue, Amsterdam Avenue, 155th Street and 156th Street, Manhattan
Reconstruction of Sperandeo Brothers Playground, including the rehabilitation of a comfort station, Atlantic Avenue, Linwood Street and Elton Street, Brooklyn
Relocation and reconstruction of a playground, Francis Lewis Park, Third Avenue, 147th Street, the East River and Parsons Boulevard, Queens
Construction of the Theatre for a New Audience as part of the BAM Cultural District master plan, Ashland Place between Lafayette Avenue and Fulton Street, Brooklyn
Installation of streetscape improvements, including a prototypical automatic public toilet, Manhattanville/West Harlem, 125th Street between Marginal Street and Old Broadway, Old Broadway between 125th Street and 126th Street, Broadway between 124th Street and 126th Street and St. Claire Place between West 125th Street and Marginal Street, Manhattan
Rehabilitation of Building 138 for use as an EMS vehicle training facility, Fort Totten, Queens
Design of a prototypical automated material handler (AMH), Queens Library, Queens
Construction of a pedestrian bridge over West 65th Street, Lincoln Center for the Performing Arts, West 65th Street between Broadway and Amsterdam Avenue, Manhattan
Installation of a door, Manhattan Criminal Court, 100 Centre Street, Baxter Street façade, Manhattan
Reconstruction of a step street (Library Lane), Coles Lane between Kingsbridge Road and Bainbridge Avenue, Bronx
Reconstruction of a streetscape, including the installation of security infrastructure, East 43rd Street between Lexington Avenue and Third Avenue and Lexington Avenue between East 43rd Street and East 44th Street, Manhattan
Modifications to the construction of aboveground components of the Croton Water Treatment Plant, Phase II, Mosholu Golf Course, Van Cortlandt Park, 3701 Jerome Avenue, Bronx
Installation of fencing and adjacent site work, Shaft 21B, 913 Kent Avenue, Brooklyn
Replacement of a fence, Kensico Dam, West Westlake Drive, Valhalla, Westchester County
Construction of an ADA entry vestibule, 1 Rockwell Place, Brooklyn
Installation of two prefabricated office trailers, Hutchinson River Parkway District 10 Headquarters, Hutchinson River Parkway at the corner of Hutchinson River Parkway East and Continental Avenue, Bronx
Reconstruction of Neufeld Playground, Riverside Park, West 76th Street between Riverside Drive and Henry Hudson Parkway, Manhattan
Reconstruction of Orville & Wilbur (P.S. 28 Wright Brothers) Playground, St. Nicholas Avenue, Amsterdam Avenue, 155th Street and 156th Street, Manhattan
Construction of a skate park as Phase III of the reconstruction of Canarsie Park, southern portion of Canarsie Park between Seaview Avenue and Shore Parkway, Brooklyn
Conservation of the Theodore Roosevelt Monument (1940) by James Earle Fraser, American Museum of Natural History, Central Park West and West 81st Street, Manhattan