| Removal, conservation, and reinstallation of a series of 11 tile murals within a larger tile installation (ca. 1922) by the Grueby Faience Company, Heckscher Lobby, El Museo del Barrio, 1230 Fifth Avenue, Manhattan |
|
|
|
|
|
|
| Installation of rooftop HVAC equipment, Central Library, 89-25 Merrick Boulevard, Queens |
|
|
|
|
|
|
| Installation of signage as a part of the construction of Hunts Point Landing waterfront park, South Bronx Greenway, Farragut Street and the Bronx River off of Food Center Drive, Hunts Point, Bronx |
|
|
|
|
|
|
| Installation of prototypical signage, book drop, flag pole, exterior lighting and gate, South Hollis Community Library, 204-01 Hollis Avenue, Queens |
|
|
|
|
|
|
| Installation of three louvers, Queens Borough Hall, 120-55 Queens Boulevard, Queens |
|
|
|
|
|
|
| Installation of rooftop mechanical equipment, 100 Gold Street, Manhattan |
|
|
|
|
|
|
| Installation of a distinctive sidewalk, 19-21 Clinton Street, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 170 Varick Street, southeast corner of Varick Street and Charlton Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of a playground, including the construction of a comfort station, as a part of the construction of the Coney Island Center, Asser Levy Park, Sea Breeze Avenue, West Fifth Street and Surf Avenue, Brooklyn |
|
|
|
|
|
|
| Rehabilitation of Valentino’s on the Green, including the construction of an addition and adjacent site work, Clearview Park, 201-10 Cross Island Expressway, Queens |
|
|
|
|
|
|
| Construction of Hunts Point Landing waterfront park, South Bronx Greenway, Farragut Street and the Bronx River off of Food Center Drive, Hunts Point, Bronx |
|
|
|
|
|
|
| Construction of a foundation and platform for the track and field house and adjacent site work as Phase IA of the reconstruction of Ocean Breeze Park, Quintard Street, Mason Avenue and Father Capodanno Boulevard, Staten Island |
|
|
|
|
|
|
| Construction of an enclosed horse riding arena and adjacent site work, Ocean Breeze Park, Quintard Street, Mason Avenue and Father Capodanno Boulevard, Staten Island |
|
|
|
|
|
|
| Construction of Heritage Field and Ruppert Place, including pedestrian access to the rooftop park at Site A, Ruppert Place, East 161st Street, River Avenue East 157th Street, the original Yankee Stadium, Bronx |
|
|
|
|
|
|
| Replacement of entry doors, Flushing Community Library, 41-17 Main Street, Queens |
|
|
|
|
|
|
| Rehabilitation and stabilization of the Division of Facilities Management and Construction (DFMC) shops, 390 Kent Avenue, Brooklyn |
|
|
|
|
|
|
| Installation of bird-proofing material, New York Hall of Science, 47-01 111th Street, Queens |
|
|
|
|
|
|
| Construction of a tensile structure, East Meadow, Staten Island Children’s Museum, Sailor’s Snug Harbor, 1000 Richmond Terrace, Staten Island |
|
|
|
|
|
|
| Rehabilitation of two skylights, including the installation of a wind scoop and a wind turbine, Main Building, Staten Island Children’s Museum, Sailor’s Snug Harbor, 1000 Richmond Terrace, Staten Island |
|
|
|
|
|
|
| Installation of a Bishop’s Crook light pole, south side of West 72nd Street at Riverside Boulevard, Manhattan |
|
|
|
|
|
|
| Rehabilitation of the Park Avenue Tunnel, Park Avenue from East 34th Street to East 39th Street, Manhattan |
|
|
|
|
|
|
| Installation of streetscape improvements and the construction of an on- street segment of the South Bronx Greenway, Lafayette Avenue from Hunts Point Avenue to Halleck Street, Bronx |
|
|
|
|
|
|
| Reconstruction of the Old Douglaston Pumping Station and outfall structure and adjacent site work, Alley Creek Combined Sewer Overflow Retention Facility, Northern Boulevard and Alley Creek, Queens |
|
|
|
|
|
|
| Installation of an oil storage tank, 179th Street Pumping Station, 2405 Amsterdam Avenue, Manhattan |
|
|
|
|
|
|
| Installation of Wi-Fi equipment on six traffic poles, Fifth Avenue between 39th Street and 57th Street, Sunset Park Business Improvement District, Brooklyn |
|
|
|
|
|
|
| Rehabilitation of Valentino’s on the Green, including the construction of an addition and adjacent site work, Clearview Park, 201-10 Cross Island Expressway, Queens |
|
|
|
|
|
|
| Reconstruction of a retaining wall, Grant Park, Grant Avenue between Sheridan Avenue and Morris Avenue, Bronx |
|
|
|
|
|
|
| Construction of a skate park and playground as Phase III of the reconstruction of Canarsie Park, southern portion of Canarsie Park between Seaview Avenue and Shore Parkway, Brooklyn |
|
|
|
|
|
|
| Rehabilitation of the Olmsted Center, including the construction of an addition and adjacent site work, Flushing Meadows Corona Park, Queens |
|
|
|
|
|
|
| Construction of a segment of the South Bronx Greenway, Anheuser- Busch warehouse/distribution facility and recycling center, 500 Food Center Drive, Hunts Point, Bronx |
|
|
|
|
|
|
| Construction of a comfort station, Prospect Park, Parade Grounds, 50 Parkside Avenue, Brooklyn |
|
|
|
|
|
|
| Installation of two ADA ramps, 1775 Grand Concourse, Bronx |
|
|
|
|
|
|
| Reconstruction of the terrace atop the Central Pavilion and the Great Hall entry, New York Hall of Science, 47-01 111th Street, Queens |
|
|
|
|
|
|
| Reconstruction of East Fordham Road, including the installation of M- Poles with teardrop luminaires, Southern Boulevard to the Bronx River Parkway Approach Ramps, Bronx |
|
|
|
|
|
|
| Installation of a distinctive sidewalk, 860-870 United Nations Plaza, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 1300 York Avenue, southeast corner of York Avenue and East 70th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of Pier 15 as part of Phase II, East River Waterfront, Wall Street to Rutgers Slip, Manhattan |
|
|
|
|
|
|
| Construction of a dog run as part of Phase I, East River Waterfront, Wall Street to Maiden Lane, Manhattan |
|
|
|
|
|
|
| Installation of signage, East River Science Park, 485 First Avenue, Bellevue Hospital campus, First Avenue, the FDR Drive, East 28th Street and East 30th Street, Manhattan |
|
|
|
|
|
|
| Rehabilitation of a residential building, Tenant Interim Lease Program, 847 Fox Street, Bronx |
|
|
|
|
|
|
| Rehabilitation of a residential building, Tenant Interim Lease Program, 615 West 150th Street, Manhattan |
|
|
|
|
|
|
| Repainting of the Grand Concourse Bridge over East 175th Street, Bronx |
|
|
|
|
|
|
| Repainting of the Queens Boulevard Bridge over the Jackie Robinson Parkway, Queens |
|
|
|
|
|
|
| Construction of two electrical building additions as a part of a Biological Nitrogen Removal Facility, Jamaica Water Pollution Control Plant, 150-20 134th Street, Queens |
|
|
|
|
|
|
| Construction of a security guardhouse, west entrance, Hillview Reservoir, 100 Central Park Avenue, Yonkers, Westchester County |
|
|
|
|
|
|
| Construction of an environmental learning center (Solar 2) as Phase III of the construction of Stuyvesant Cove, 2420 FDR Drive at Peter Cooper Road, Manhattan |
|
|
|
|
|
|
| Replacement of doors, NYPD Headquarters Joint Operations Center, 109 Park Row, Manhattan |
|
|
|
|
|
|
| Renovation of Washington Heights Branch Library, 1000 St. Nicholas Avenue at West 160th Street, Manhattan |
|
|
|
|
|
|
| Installation of The Wall Street bicycle rack by David Byrne, 82 Wall Street, Manhattan |
|
|
|
|
|
|
| Rehabilitation of the Guggenheim Bandshell, Damrosch Park, West 62nd Street and Amsterdam Avenue, Lincoln Center for the Performing Arts, Manhattan |
|
|
|
|
|
|