| Conservation of the portrait of Jose Antonio Paez (1851) by Charles Wesley Jarvis, stairwell between the first and second floor, Mayor’s side, City Hall, Manhattan |
|
|
|
|
|
|
| Conservation of the portrait of William L. Strong (1898) by Boris Kramer- Scheriro, Art Commission rotunda, City Hall, Manhattan |
|
|
|
|
|
|
| Conservation of the portrait of William F. Havemeyer (1847) by Thompkins Matteson, hallway outside speechwriters’ room, City Hall, Manhattan |
|
|
|
|
|
|
| Conservation of the portrait of Enos Thompson Throop (1833) by Robert W. Weir, East Chamber, Governor’s Room, City Hall, Manhattan |
|
|
|
|
|
|
| Conservation of the portrait of Daniel D. Tompkins (1808) by John Trumbull, Middle Chamber, Governor’s Room, City Hall, Manhattan |
|
|
|
|
|
|
| Conservation of the portrait of Stephen Decatur (1814) by Thomas Sully, East Chamber, Governor’s Room, City Hall, Manhattan |
|
|
|
|
|
|
| Installation of a louver panel, Department of Health and Mental Hygiene Laboratory Building, 455 First Avenue, Manhattan |
|
|
|
|
|
|
| Construction of an electric utility hub building, New York Aquarium, Surf Avenue and West 8th Street, Brooklyn |
|
|
|
|
|
|
| Conservation of the James Gordon Bennett Memorial (Minerva and the Bellringers) (1940) by Aymar Embury II, including sculptures, clock and clock faces (1894) by Jean Antonin Carles, Herald Square, Broadway, Avenue of the Americas, West 34th Street and West 35th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of a playground and tot lot, Athens Square Park, 30th Street, 30th Avenue, Queens |
|
|
|
|
|
|
| Construction of a corporate co-location building as part of Phase I of the construction of Cornell University/Technion-Israel Institute of Technology’s applied sciences campus, Roosevelt Island, Manhattan |
|
|
|
|
|
|
| Installation of an emergency generator, Engine Company 331/Ladder 173, 158- 57 Cross Bay Boulevard, Howard Beach, Queens |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 665 Fifth Avenue, southeast corner of Fifth Avenue and East 53nd Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of a portion of a playground, Thomas J. Travers Park, 34th Avenue between 77th Street and 78th Street, Queens |
|
|
|
|
|
|
| Expansion of the Hospital for Special Surgery, East 70th Street, East 72nd Street, western edge of the FDR Drive and the East River, Manhattan |
|
|
|
|
|
|
| Construction of a portion of the esplanade as a pilot study for Phase I, East River Waterfront, Maiden Lane to Pine Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of the esplanade and construction of the archipelago as part of Phase I, East River Waterfront, Wall Street to Rutgers Slip, Manhattan |
|
|
|
|
|
|
| Installation of a memorial to the victims of 9/11, Staten Island Promenade, Richmond County Bank Ballpark, north shore, Staten Island |
|
|
|
|
|
|
| Construction of a parking garage, Site B, East 164th Street, River Avenue, East Jerome Avenue, Yankee Stadium, Bronx |
|
|
|
|
|
|
| Installation of streetscape improvements, Phase I, Jackson Avenue between Queens Plaza South and 21st Street, including McKenna Triangle at Jackson Avenue and 45th Avenue, Rafferty Triangle at Hunter Street and 44th Drive, and three Greenstreet triangles at Jackson Avenue and 46th Avenue, Hunter Street and Crescent Street, and Hunter Street and 27th Street, Queens |
|
|
|
|
|
|
| Installation of security bollards, Jewish Community Center, 334 Amsterdam Avenue, Manhattan |
|
|
|
|
|
|
| Reconstruction of a canopy, Keener Administration Building, Charles Gay Homeless Shelter, 1 Wards Island, Manhattan |
|
|
|
|
|
|
| Construction of a marina, including a two-story retail building, Beach 80th Street between Beach Channel Drive and Barbados Basin, Queens |
|
|
|
|
|
|
| Construction of a comfort station, Washington Market Park, Chambers Street, Greenwich Street, Duane Street and West Street, Manhattan |
|
|
|
|
|
|
| Construction of an addition and adjacent site work, Black Spectrum Theatre, Roy Wilkins Park, Merrick Boulevard, 115th Avenue and Baisley Boulevard, Queens |
|
|
|
|
|
|
| Construction of an amphitheater, Crotona Park North, Crotona Park East, Cleremont Parkway and Crotona Avenue, Crotona Park, Bronx |
|
|
|
|
|
|
| Reconstruction of Hester Street playground and plaza and partial rehabilitation of Building D, Sara D. Roosevelt Park, Forsyth Street, Chrystie Street, East Houston Street and Canal Street, Manhattan |
|
|
|
|
|
|
| Construction of a temporary grit shed, Owls Head Water Pollution Control Plant, 6700 Shore Road, Brooklyn |
|
|
|
|
|
|
| Preservation and adaptive reuse of the West 69th Street Transfer Bridge, Phase I, Riverside South Park, West 69th Street at the Hudson River, Manhattan |
|
|
|
|
|
|
| Reconstruction of a park entrance, Bronx River (Shoelace) Park, 211th Street and Bronx Boulevard, Bronx |
|
|
|
|
|
|
| Construction of a portion of the Harlem River Greenway, including Bridge Park, Exterior Street between West 171st Street and West 175th Street, Bronx |
|
|
|
|
|
|
| Installation of Downtown Brooklyn Wayfinding Signage, Brooklyn Bridge underpasses, Washington Street and Prospect Street, Brooklyn |
|
|
|
|
|
|
| Reconstruction of the Bank Rock, Bow Bridge, Hernshead, Wagner Cove, and Western Shore boat landings, the Lake, Central Park, between 72nd Street and 77th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of the Arthur Avenue Retail Market, 2344 Arthur Avenue, Bronx |
|
|
|
|
|
|
| Installation of streetscape improvements, including a clock and 30 TBTA light poles, Bell Boulevard between 35th Avenue and Northern Boulevard, Queens |
|
|
|
|
|
|
| Construction of five ballfields, a comfort station and adjacent site work, Randall’s Island, Manhattan |
|
|
|
|
|
|
| Construction of Owl Hollow Fields, Phase II, including a comfort station and adjacent site work, Owl Hollow Fields, Arthur Kill Road, Route 440 and Arden Avenue, Staten Island |
|
|
|
|
|
|
| Reconstruction of Vanderbilt Playground and adjacent site work, Prospect Park, West Lake Drive and Vanderbilt Street, Brooklyn |
|
|
|
|
|
|
| Construction of a marina, including a two-story retail building, Beach 80th Street between Beach Channel Drive and Barbados Basin, Queens |
|
|
|
|
|
|
| Installation of a prototypical newsstand, southwest corner of Second Avenue and East 80th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of James Weldon Johnson Playground, adjacent to P.S. 57, Lexington Avenue and Third Avenue between East 115th Street and East 112th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of Lyons Square Playground, Bruckner Boulevard, Bryant Avenue, Aldus Street and Longfellow Avenue, Bronx |
|
|
|
|
|
|
| Rehabilitation of Building 77, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn |
|
|
|
|
|
|
| Construction of Stages 25-30 (formerly 16-21) and a perimeter wall, Steiner Studios, Brooklyn Navy Yard Industrial Park, Assembly Road, Wallabout Road, and Kent Avenue, Brooklyn |
|
|
|
|
|
|
| Reconstruction of Bushwick Playground, Putnam Avenue, Knickerbocker Avenue, Woodbine Street and Irving Avenue, Brooklyn |
|
|
|
|
|
|
| Installation of wayfinding signage, parking and plaza area, Citi Field (Mets stadium), Flushing Meadows Corona Park, Northern Boulevard, Roosevelt Avenue, 126th Street and Grand Central Parkway, Queens |
|
|
|
|
|
|
| Conservation of the Macombs Dam Fountain and terrace, Macombs Dam Park, Jerome Avenue between Ogden Avenue and Woodycrest Avenue, Bronx |
|
|
|
|
|
|
| Construction of a playground, Phase II, Nelson Avenue Waterfront Park (Seaside Nature Park), Cleveland Avenue, Nelson Avenue, Tennyson Drive and the bulkhead line, Staten Island |
|
|
|
|
|
|
| Reconstruction of Avenue A playground, Tompkins Square Park, Avenue A, East 10th Street, Avenue B, East 7th Street, Manhattan |
|
|
|
|
|
|
| Construction of a nature preserve, including a nature center, Shore Front Parkway between Beach 44th Street and Beach 56th Street, Queens |
|
|
|
|
|
|