| Construction of an entrance, including installation of an ADA ramp, Queens Borough Hall, 120-55 Queens Boulevard, Queens |
|
|
|
|
|
|
| Construction of planted medians as a part of the installation of prototypical select bus service stations, Webster Avenue between East 166th Street and East 204th Street, Bronx |
|
|
|
|
|
|
| Reconstruction and expansion of Zion Triangle, Legion Street, East New York Avenue and Pitkin Avenue, Brooklyn |
|
|
|
|
|
|
| Replacement of the roof and construction of rooftop bulkheads, Heckscher Building, 1230 Fifth Avenue, Manhattan |
|
|
|
|
|
|
| Construction of a temporary support wall, east spillway channel wall, Amawalk Dam, Amawalk Road and Lake Road, Somers, Westchester County |
|
|
|
|
|
|
| Design of prototypical public communications structures (LinkNYC) for installation citywide |
|
|
|
|
|
|
| Installation of CityLights poles, CityLights luminaires on traffic poles, and Grand Central poles, Garment District, Broadway between West 35th Street and West 42nd Street, Seventh Avenue between West 35th Street and West 42nd Street, and West 35th Street between Fifth Avenue and Ninth Avenue, Manhattan |
|
|
|
|
|
|
| Installation of CityLights poles and CityLights luminaires on traffic poles, Flatiron/23rd Street Partnership District, 23rd Street between Third Avenue and Sixth Avenue and Broadway between 20th Street and 28th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of Carmansville Playground, Amsterdam Avenue between West 151st Street and West 152nd Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of a portion of Heckscher Playground, Linden Street between Central Avenue and Wilson Avenue, Brooklyn |
|
|
|
|
|
|
| Installation of an artificial turf athletic field, Frank Golden Park, 132nd Street between 14th Avenue and 20th Avenue, Queens |
|
|
|
|
|
|
| Reconstruction of a portion of Brookville Park, Brookville Boulevard, 147th Avenue, 232nd Street and the Belt Parkway, Queens |
|
|
|
|
|
|
| Construction of a skate park, Thomas Jefferson Park, East 114th Street, Pleasant Avenue and FDR Drive, Manhattan |
|
|
|
|
|
|
| Reconstruction of a portion of Demutiis Playground, 101st Street and Liberty Avenue, Queens |
|
|
|
|
|
|
| Reconstruction of the Pelham Parkway malls, Phase I, Boston Road to Wallace Avenue, Bronx |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 341 East 79th Street, northwest corner of East 79th Street and First Avenue, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 1332 Metropolitan Avenue, northeast corner of Metropolitan Avenue and Benedict Avenue, Bronx |
|
|
|
|
|
|
| Installation of rooftop mechanical equipment, Marcy Branch Library, 617 DeKalb Avenue, Brooklyn |
|
|
|
|
|
|
| Construction of a biogas conditioning system and adjacent site work, Newtown Creek Water Pollution Control Plant, 329 Greenpoint Avenue, Brooklyn |
|
|
|
|
|
|
| Reconstruction of SoHo Square, including the conservation and relocation of General José Artigas (1987) by José Luis Zorrilla de San Martín, as Phase II of the Hudson Square streetscape master plan, Sixth Avenue between Spring Street and Broome Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of the East River esplanade as Phase I of the expansion of Rockefeller University over the FDR Drive between East 64th Street and East 68th Street, Manhattan |
|
|
|
|
|
|
| Design of a park-wide signage system, Hudson River Park, West Street between Chambers Street and West 59th Street, Manhattan |
|
|
|
|
|
|
| Reconstruction of the sidewalk, including installation of M-poles, and adjacent site work, west side of Flatbush Avenue between Grand Army Plaza and the Prospect Park Zoo, Prospect Park, Brooklyn |
|
|
|
|
|
|
| Reconstruction of Father Fagan Park, Avenue of the Americas between Prince Street and Vandam Street, Manhattan |
|
|
|
|
|
|
| Installation of a door and a duct, Faber Park, Pool Pavilion, Richmond Terrace between Sharpe Avenue and Faber Terrace, Staten Island |
|
|
|
|
|
|
| Reconstruction of St. James Park, Phase II, Jerome Avenue, Creston Avenue, East 191st Street and East 193rd Street, Bronx |
|
|
|
|
|
|
| Reconstruction of Waterside Pier, Phase IA, East River Waterfront between East 38th Street and East 41st Street, Manhattan |
|
|
|
|
|
|
| Installation of signage, Industry Kitchen, Pavilion A, East River Waterfront south of Maiden Lane under the FDR Drive, Manhattan |
|
|
|
|
|
|
| Construction of a pedestrian bridge and a ramp, East 81st Street over the FDR Drive, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 939 Third Avenue, northeast corner of Third Avenue and East 56th Street, Manhattan |
|
|
|
|
|
|
| Installation of a prototypical newsstand, 76-10 37th Avenue, southeast corner of 37th Avenue and 76th Street, Queens |
|
|
|
|
|
|
| Reconstruction of the Ruth Rea Howell Family Garden, including the construction of an educational facility, New York Botanical Garden, 2900 Southern Boulevard, Bronx |
|
|
|
|
|
|
| Rehabilitation of the rooftop penthouse and installation rooftop mechanical equipment, 67th Street Library, 328 East 67th Street, Manhattan |
|
|
|
|
|
|
| Installation of doors, a canopy with signage and rooftop mechanical equipment, Staten Island Family Justice Center, 126 Stuyvesant Place, Staten Island |
|
|
|
|
|
|
| Construction of a retaining wall, Cross Bay Parkway at 32nd Road, Queens |
|
|
|
|
|
|
| Construction of an electrical substation, West 142nd Street between the Henry Hudson Parkway and the Hudson River Greenway, North River Wastewater Treatment Plant/Riverbank State Park, Manhattan |
|
|
|
|
|
|
| Installation of streetscape improvements as Phase II of the streetscape master plan, New York Presbyterian Hospital and Columbia University Medical Center, Fort Washington Avenue between West 165th Street and West 168th Street, Manhattan |
|
|
|
|
|
|
| Repainting of the Hutchinson Parkway Bridge over the Hutchinson River, Bronx |
|
|
|
|
|
|
| Construction of a pre-fabricated operations building and adjacent site work, New York Restoration Project’s Sherman Creek Campus, Sherman Creek Park, Tenth Avenue, Harlem River Drive, Academy Street and Sherman Creek, Manhattan |
|
|
|
|
|
|
| Reconstruction of Thomas Boyland Park, Broadway between Granite Street and Aberdeen Street, Brooklyn |
|
|
|
|
|
|
| Reconstruction of Astoria Heights Playground, 30th Road, 45th Street and 46th Street, Queens |
|
|
|
|
|
|
| Construction of an addition, Dag’s Patio Café, 342 East 47th Street, Dag Hammarskjöld Plaza, Manhattan |
|
|
|
|
|
|
| Installation of a roller hockey rink enclosure, Staten Island Sports Park, 215 Schmidt’s Lane, Staten Island |
|
|
|
|
|
|
| Reconstruction of the waterfront esplanade, Hermon A. MacNeil Park, Poppenhusen Avenue, 115th Street, College Place and the East River, Queens |
|
|
|
|
|
|
| Construction of a waterfront esplanade, Beach Channel Drive between Beach 108th Street and Rockaway Freeway, Queens |
|
|
|
|
|
|
| Installation of protective fencing for the multipurpose sports field, Sperandeo Brothers Playground, Cleveland Street between Liberty Avenue and Atlantic Avenue, Brooklyn |
|
|
|
|
|
|
| Installation of Wi-Fi equipment, Bushwick Communicare, 335 Central Avenue, Brooklyn |
|
|
|
|
|
|
| Reconstruction of the boardwalk, Phase V, Rockaway Beach between Beach 20th Street and Beach 60th Street, Queens |
|
|
|
|
|
|
| Reconstruction of a portion of Heckscher Playground, Linden Street between Central Avenue and Wilson Avenue, Brooklyn |
|
|
|
|
|
|
| Reconstruction of Newtown Barge Park as part of the Greenpoint and Williamsburg waterfront master plan, Commercial Street, Dupont Street and the East River, Brooklyn |
|
|
|
|
|
|