| Design of distinctive storm sewer manhole covers, as part of the Bluebelt Program for installation citywide |
Citywide |
DEP |
Landscape architecture |
Preliminary and Final |
|
2026-04-20 |
| Reconstruction of a bulkhead, 23rd Street Basin, 730 3rd Avenue, Brooklyn |
Brooklyn |
EDC |
Landscape architecture |
Preliminary and Final |
|
2026-04-20 |
| Installation of a building signage system for a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Signage |
Preliminary |
|
2026-04-20 |
| Construction of interim prefabricated trailers, Ferry Point Park Golf Course (Bally's Golf Links), 500 Hutchinson River Parkway, Balcom Avenue, Miles Avenue, Whitestone Bridge approach and the East River, Bronx |
Bronx |
DPR |
Architecture |
Preliminary and Final |
|
2026-04-20 |
| Rehabilitation of the administration building, including construction of an electrical building addition and adjacent site work, Port Richmond Wastewater Resource Recovery Facility, 1801 Richmond Terrace, Staten Island |
Staten Island |
DEP |
Architecture |
Preliminary |
|
2026-04-20 |
| Reconstruction of Damrosch Park, including streetscape improvements, Lincoln Center for the Performing Arts, West 62nd Street between Columbus Avenue and Amsterdam Avenue, Manhattan |
Manhattan |
DPR/DOT |
Landscape architecture |
Final |
|
2026-04-20 |
| Installation of a wayfinding and signage system for Flushing Meadows-Corona Park, Flushing, Queens |
Queens |
DPR |
Signage |
Preliminary and Final |
|
2026-04-20 |
| Reconstruction of the parking garage roof deck (Pier 83 Circle Line), Pier 83, Hudson River Park, 12th Avenue between West 42nd Street and West 43rd Street, Manhattan |
Manhattan |
DPR/HRPT |
Architecture |
Preliminary and Final |
|
2026-04-20 |
| Rehabilitation of Building 209 (formerly Building 275), 63 Flushing Avenue, Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Architecture |
Preliminary and Final |
|
2026-04-20 |
| Reconstruction of a boiler building, Building 41A, Washington Avenue and 4th Street Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Building systems & Modifications |
Final |
|
2026-04-20 |
| Installation of interpretive and informational signage, as part of the construction of a waterfront park at Pier 6, Bush Terminal Industrial Campus (Made in NYC), adjacent to Marginal Way between 41st Street and 43rd Street, Brooklyn |
Brooklyn |
EDC |
Signage |
Preliminary |
|
2026-04-20 |
| Construction of a distinctive sidewalk, including the installation of security infrastructure, West 42nd Street between Seventh Avenue and Eighth Avenue, Manhattan |
Manhattan |
DDC/DOT |
Distinctive sidewalk |
Final |
|
2026-04-20 |
| Reconstruction of a multipurpose play area, Juniper Valley Park, 80th Street between Juniper Boulevard North and Juniper Boulevard South, Middle Village, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2026-04-20 |
| Minor reconstruction of a track and field house, Ocean Breeze Track and Field Athletic Complex, 625 Father Capodanno Boulevard, Staten Island |
Staten Island |
DPR |
Architecture |
Preliminary |
|
2026-04-20 |
| Reconstruction of St. Andrew's Playground, Atlantic Avenue, St. Andrew's Place, Herkimer Street, and Kingston Avenue, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Final |
|
2026-04-20 |
| Reconstruction of a portion of Phil "Scooter" Rizzuto Park, 127th Avenue between 95th Avenue and Atlantic Avenue, South Richmond Hill, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary |
|
2026-04-20 |
| Reconstruction of a portion of John Allen Payne Playground, including the construction of a skate park, Third Avenue between 64th Street and 65th Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary |
|
2026-04-20 |
| Installation of a wayfinding signage system for a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Signage |
Preliminary |
|
2026-04-20 |
| Reconstruction of athletic courts, Laurelton Playground, 137th Avenue, Brookville Boulevard, and 137th Road, Rosedale, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2026-04-20 |
| Installation of an interpretive signage system for Flushing Meadows-Corona Park, Flushing, Queens |
Queens |
DPR |
Signage |
Preliminary and Final |
|
2026-04-20 |
| Long-term installation of Billet by Hank Willis Thomas, Peter Jay Sharp Building, Brooklyn Academy of Music (BAM), 30 Lafayette Avenue, Brooklyn |
Brooklyn |
DCLA |
Artwork |
Conceptual |
|
2026-04-20 |
| Installation of Pathways to Possibility by Mark Loughney, Horizon Juvenile Center, 560 Brooke Avenue, Bronx |
Bronx |
DCLA%/DDC/ACS |
Artwork |
Conceptual |
|
2026-04-20 |
| Minor modifications to the construction of an ADA path and adjacent site work, Great Hill, Central Park, Central Park West between West 103rd Street and West 107th Street, Manhattan |
Manhattan |
DPR/CPC |
Landscape architecture |
Amended Final |
|
2026-04-08 |
| Minor modifications to the construction of an open space, East 34th Street and FDR Drive, Manhattan |
Manhattan |
EDC/DPR |
Landscape architecture |
Amended Final |
|
2026-04-08 |
| Installation of mechanical equipment, Engine Company 207/Ladder Company 11, 172 Tillary Street, Brooklyn |
Brooklyn |
FDNY |
Building systems & Modifications |
Preliminary and Final |
|
2026-04-08 |
| Minor modifications to the construction of an off-shore wind operations and maintenance building and adjacent sitework, South Brooklyn Marine Terminal, 2nd Avenue between 32nd Street and 34th Street, Brooklyn |
Brooklyn |
EDC |
Architecture |
Amended Final |
|
2026-04-08 |
| Minor modifications to the reconstruction of Del Valle Square, Hunts Point Avenue, 163rd Street, and Bruckner Boulevard, Bronx |
Bronx |
DDC/DOT/DPR |
Landscape architecture |
Amended Final |
|
2026-04-08 |
| Installation of mechanical equipment, Engine Company 163/Ladder Company 83, 875 Jewett Avenue, Staten Island |
Staten Island |
FDNY |
Building systems & Modifications |
Preliminary and Final |
|
2026-04-08 |
| Installation of mechanical equipment, Horizon Juvenile Center, 560 Brooke Avenue, Bronx |
Bronx |
DDC |
Building systems & Modifications |
Preliminary and Final |
|
2026-04-08 |
| Minor modifications to the replacement of a roof and mechanical equipment, including installation of photovoltaic panels and guardrails, David H. Koch Theater, Lincoln Center, 20 Lincoln Center Plaza, Manhattan |
Manhattan |
DDC/DCLA/DCAS |
Building systems & Modifications |
Amended Final |
|
2026-04-08 |
| Reconstruction of the South shoreline, as Phase II of the reconstruction of the Harlem Meer shoreline, Central Park North between East Drive and Fifth Avenue, Central Park, Manhattan |
Manhattan |
DPR/CPC |
Landscape architecture |
Preliminary and Final |
|
2026-03-23 |
| Reconstruction of the bandshell and construction of an adjacent shade structure, as part of the reconstruction of Damrosch Park, Lincoln Center for the Performing Arts, West 62nd Street between Columbus Avenue and Amsterdam Avenue, Manhattan |
Manhattan |
DPR/DOT |
Architecture |
Final |
|
2026-03-23 |
| Reconstruction of the plaza east of the Soldiers’ and Sailors’ Monument, including the installation of an ADA path, West 88th Street and Riverside Drive, Riverside Park, Manhattan |
Manhattan |
DPR |
Landscape architecture |
Final |
|
2026-03-23 |
| Construction of a compost facility and education building, Lower East Side Ecology Center, East River Park, FDR Drive between Jackson Street and Cherry Street, Manhattan |
Manhattan |
DDC/DPR |
Landscape architecture |
Final |
|
2026-03-23 |
| Reconstruction of Washington Park, East 183rd Street between Washington Avenue and Park Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Final |
|
2026-03-23 |
| Installation of a barge and gangways, Downtown Manhattan Heliport, Pier 6, 20 South Street, Manhattan |
Manhattan |
EDC |
Landscape architecture |
Preliminary and Final |
|
2026-03-23 |
| Installation of rooftop signage for a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Signage |
Preliminary and Final |
|
2026-03-23 |
| Installation of glazed façades, Union Square Pavilion, 20 Union Square West, Union Square Park, Manhattan |
Manhattan |
DPR |
Architecture |
Preliminary |
|
2026-03-23 |
| Reconstruction of a portion of Harvard Playground, 179th Place between Jamaica Avenue and 90th Avenue, Hollis, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2026-03-23 |
| Construction of flood protection measures as part of the North-West Battery Park City Resiliency master plan, West Street between Chambers Street and North Moore Street, Manhattan |
Manhattan |
DOT |
Landscape architecture |
Preliminary |
|
2026-03-23 |
| Replication of a sword hilt, Independence Flagstaff (1930) by Anthony de Francisci, Union Square Park, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
|
2026-03-23 |
| Conservation of General Franz Sigel (1907) by Karl Bitter, West 106th Street and Riverside Drive, Riverside Park, Manhattan |
Manhattan |
DPR |
Artwork |
Preliminary |
|
2026-03-23 |
| Construction of a public restroom building, St. Andrew's Playground, Atlantic Avenue, St. Andrew's Place, Herkimer Street, and Kingston Avenue, Brooklyn |
Brooklyn |
DPR |
Architecture |
Preliminary and Final |
|
2026-03-23 |
| Construction of a trailhead, an outlook area, and outdoor classrooms, Idlewild Park, 225th Street and 149th Avenue, Springfield Gardens, Queens |
Queens |
DPR |
Landscape architecture |
Preliminary and Final |
|
2026-03-23 |
| Reconstruction of the athletic fields and dog run, John F. Murray Playground, 45th Road and 45th Avenue between 11th Street and 21st Street, Hunters Point, Queens |
Queens |
DPR |
Landscape architecture |
Final |
|
2026-03-23 |
| Installation of a bronze plaque memorializing Jonathan E. Diller, 116th Police Precinct, North Conduit Avenue and 244th Street, Rosedale, Queens |
Queens |
DDC/NYPD |
Signage |
Preliminary and Final |
|
2026-03-23 |
| Modifications to the reconstruction of Haffen Park, Burke Avenue, Ely Avenue, Hammersley Avenue, and Gunther Avenue, Bronx |
Bronx |
DPR |
Landscape architecture |
Amended Final |
|
2026-03-23 |
| Reconstruction of a portion of American Playground, Franklin Street between Milton Street and Noble Street, Brooklyn |
Brooklyn |
DPR |
Landscape architecture |
Preliminary and Final |
|
2026-03-23 |
| Reconstruction of the Soldiers and Sailors Memorial Arch (1892) by John Hemingway Duncan, Prospect Park, Grand Army Plaza, Flatbush Avenue and Eastern Parkway, Brooklyn |
Brooklyn |
DPR/PPA |
Artwork |
Final |
|
2026-03-23 |
| Construction of the Northfield Garage and Southfield Garage, as part of the master plan for the Metropolitan Park (Queens Future), Shea Road, between Grand Central Parkway and Seaver Way, and Roosevelt Avenue, between Shea Road and Seaver Way, adjacent to Citi Field, Corona, Queens |
Queens |
EDC/DPR |
Architecture |
Preliminary and Final |
|
2026-03-23 |