| Construction of an addition to the Return and Waste Sludge Building and rehabilitation of the Final Settling Tanks, Owls Head Wastewater Resource Recovery Facility, 6700 Shore Road, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of an open space, East 34th Street and FDR Drive, Manhattan |
Manhattan |
EDC/DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a public restroom building, Fort Independence Playground, West 238th Street and Sedgwick Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a truck garage and canopy, Queens Repair Facility, 106-36 180th Street, Queens |
Queens |
DEP |
Final |
|
|
Agenda
Minutes
|
| Design of a master plan for the construction of Metropolitan Park (Queens Future), including the construction of a gaming facility, resort, retail, and events complex, parking structures, the reconstruction of Shea Road, and adjacent site work, Roosevelt Avenue, between Grand Central Parkway and Seaver Way, and between the MTA New York City Transit Corona Maintenance Yard and the Whitestone Expressway, adjacent to Citi Field, Corona, Queens |
Queens |
EDC/DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a building signage system as part of the construction of a residential building, streetscape, and plazas, 126th Street and Roosevelt Avenue, Willets Point, Corona, Queens |
Queens |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of an interpretive sign between Randall's Island Field #51 and Wards Island Wastewater Resource Recovery Facility, Hell Gate Circle between C Road and 2nd Drive, Randall’s Island, Manhattan |
Manhattan |
DEP/DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of interpretive signage as part of the construction of a bioretention median, Beach 67th Street and Thursby Avenue, Arverne, Queens |
Queens |
DEP/DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of interpretive signage as part of the construction of a bioretention median, Hillside Avenue and Manor Road, Queens Village, Queens |
Queens |
DEP/DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of interpretive signage as part of the construction of two bioretention triangles, Winchester Boulevard at 234th Street and Hillside Avenue and at 236th Street and Seward Avenue, Queens Village, Queens |
Queens |
DEP/DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of lighting, Grand Army Plaza, Central Park, West 59th Street, Fifth Avenue, and West 59th Street, Manhattan |
Manhattan |
DPR/CPC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of pipe bollards and a raised crosswalk, Broadway and Bennett Avenue, Manhattan |
Manhattan |
DDC/DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of pipe bollards and a raised crosswalk, Utica Avenue and Winthrop Street, Brooklyn |
Brooklyn |
DDC/DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of rooftop mechanical equipment, Manhattan Districts 4, 4A and 7 Garage, 650 West 57th Street and 780-786 Twelfth Avenue, Manhattan |
Manhattan |
DSNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of tenant signage (Club Pilates) as part of a mixed-used development (Lighthouse Point), 5 Bay Street, Staten Island |
Staten Island |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Minor modifications to the installation of streetscape improvements, Water Street between Whitehall Street and Hanover Square, Manhattan |
Manhattan |
DOT/EDC/DPR |
Amended Final |
|
|
Agenda
Minutes
|
| Modifications to the construction of operations facility buildings, control chamber, and adjacent site work as part of upgrade of Hillview Reservoir, 100 Central Park Avenue, Yonkers, Westchester County |
Upstate |
DEP |
Amended Final |
|
|
Agenda
Minutes
|
| Modifications to the installation of Un(Common) Grounds (previously Un(Common) Threads) by Borinquen Gallo, 40th Police Precinct, East 149th Street and St. Ann's Avenue, Bronx |
Bronx |
DCLA%/DDC/NYPD |
Amended Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a boiler building, Building 41A, Washington Avenue and 4th Street Brooklyn Navy Yard Industrial Park, Brooklyn |
Brooklyn |
BNYDC |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of an addition, including the installation of mechanical equipment, Engine Company 96, 1689 Story Avenue, Bronx |
Bronx |
FDNY |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of Anchorage Plaza for use as a pickleball concession (CityPickle), adjacent to the Brooklyn Bridge, Washington Street, Prospect Street, and Old Fulton Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of Lawrence Virgilio Playground, 39th Drive, 39th Road, and Woodside Avenue, Woodside, Queens |
Queens |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a public restroom building and a maintenance and operations facility, Park of the Americas (formerly Linden Park), 41st Avenue, 104th Street, 42nd Avenue, and 103rd Street, Corona, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Caserta Playground and installation of a subsurface detention system as a part of the Cloudburst Management Program for the Parkchester and Morris Park Cloudburst Hub, Odell Street, St. Raymond Avenue, and Purdy Street, Bronx |
Bronx |
DEP/DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Eae J. Mitchell Park, East 174th Street and Longfellow Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Fort Independence Playground, West 238th Street and Sedgwick Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Gonzalo Placensia Playground, adjacent to P.S. 136, 41st Street, 3rd Avenue, and 40th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of Peter Minuit Playground, adjacent to P.S. 108, Park Avenue between East 108th Street and East 109th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of the southern shoreline, including construction of outlooks and pathways, Barretto Point Park, Barretto Street and Ryawa Avenue, Bronx |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of Columbus Park Pavilion, Columbus Park, Worth Street, Baxter Street, Mulberry Street, and Bayard Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|