| Construction of a gas holding facility (decommissioned Thickener Tanks No. 2 and No. 4) and adjacent site work, Newtown Creek Wastewater Resource Recovery Facility, 329 Greenpoint Avenue, Brooklyn |
Brooklyn |
DEP |
Final |
|
|
Agenda
Minutes
|
| Construction of North Cove Park, east of Ninth Avenue and north of West 207th Street and the University Heights Bridge, Manhattan |
Manhattan |
EDC/DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of the QueensWay Metropolitan Hub, including construction of a pedestrian bridge over the LIRR, Metropolitan Avenue, Metropolitan Expeditionary Learning School Driveway, Union Turnpike, and Trotting Course Lane, Forest Hills, Queens |
Queens |
EDC/DPR/DOT |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a fenced-in area, Fort Greene Health Center, 295 Flatbush Avenue Extension, Brooklyn |
Brooklyn |
DOHMH |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a mural (1973) by Ilya Bolotowsky, Lincoln Hospital, 234 East 149th Street, Bronx |
Bronx |
HHC |
Final |
|
|
Agenda
Minutes
|
| Installation of a public restroom trailer as part of a pilot, Gateway Park (Gateway Estates), Phase II, Vandalia Avenue, Ashford Street, Schroeders Avenue, and Walker Street, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of astros by Ronny Quevedo, southwest corner of Queens Boulevard and Woodhaven Boulevard, as part of the reconstruction of Queens Boulevard, Elmhurst, Queens |
Queens |
DCLA%/DDC/DOT |
Conceptual |
|
|
Agenda
Minutes
|
| Installation of a wharf and adjacent site work to accommodate an emergency ferry landing, Brooklyn Cruise Terminal, 210 Clinton Wharf, Brooklyn |
Brooklyn |
EDC |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of façade graphics for a stadium, as part of Phase II of Willets Point, 126th Street, 127th Street, and Willets Point Boulevard between 38th Avenue and 35th Avenue, Corona, Queens |
Queens |
EDC |
Final |
|
|
Agenda
Minutes
|
| Installation of The Flag (formerly Fabled Ecosystem) by Miguel Braceli, Mary Cali Dalton Recreation Center, 6 Victory Boulevard, adjacent to the Lyons Pool, Hannah Street, Murray Hulbert Avenue, and the Tompkinsville Esplanade, Staten Island |
Staten Island |
DCLA%/DDC/DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of Water Table by Jerome Haferd, East River Esplanade, 107th Street Pier, and Bobby Wagner Walk, East 94th Street to 107th Street, and East 117th Street to East 124th Street, Manhattan |
Manhattan |
EDC |
Conceptual |
|
|
Agenda
Minutes
|
| Minor modifications to the construction of a community center (Brownsville Girls Empowerment Center and Community Hub), 444 Thomas S. Boyland Street between East New York Avenue and Pitkin Avenue, Brooklyn |
Brooklyn |
DDC/HRA |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the paving as part of the reconstruction of the coastline (East Side Coastal Resiliency) and East River Park, including the construction of three bridges, a comfort station, two recreation centers, and two gate houses, East River between Montgomery Street and East 25th Street, Manhattan |
Manhattan |
DDC/EDC |
Amended Final |
|
|
Agenda
Minutes
|
| Minor modifications to the reconstruction of a street and adjacent site work, Travis Avenue between Victory Boulevard and Mulberry Avenue, Staten Island |
Staten Island |
EDC |
Amended Final |
|
|
Agenda
Minutes
|
| Reconstruction of a field operations building, including construction of an addition, Zerega Repair Yard, 930 Zerega Avenue, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a pedestrian bridge and restoration of the landscape, Willow Lake Preserve, south of Willow Lake between the Grand Central Parkway and Van Wyck Expressway, Flushing Meadows-Corona Park, Flushing, Queens |
Queens |
DEP/DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a public restroom building, Hattie Carthan Playground, adjacent to P.S. 305, Madison Street, Marcy Avenue, and Monroe Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of a public restroom building, Renaissance Playground, adjacent to P.S. 194, West 143rd Street, Frederick Douglass Boulevard, and West 144th Street, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Buz O’Rourke Playground, Crocheron Park, adjacent to P.S. 041, 214th Place between 33rd Road and 34th Avenue, Bayside, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Mannahatta Park, Wall Street between South Street and Front Street, Front Street and Water Street, Manhattan |
Manhattan |
DPR/DOT |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of St. Catherine’s Park, adjacent to Manhattan International High School, First Avenue between East 67th Street and East 68th Street, Manhattan |
Manhattan |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of the playground, P.S. 150, Tiffany Street, East 167th Street, Fox Street, and East 165th Street, Bronx |
Bronx |
DOE |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of the shoreline, as Phase II of the restoration of the Lakeshore shoreline, Park Drive South and Park Circle, adjacent to East Drive, Prospect Park, Brooklyn |
Brooklyn |
DPR/PPA |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Washington Park, East 183rd Street between Washington Avenue and Park Avenue, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of a health facility for use as a community center, HEArts Center (formerly Mott Haven Health Center), 349 East 140th Street, Bronx |
Bronx |
EDC |
Preliminary |
|
|
Agenda
Minutes
|
| Rehabilitation of the Schomburg Center for Research in Black Culture, 515 Malcolm X Boulevard between West 135th Street and West 136th Street, Manhattan |
Manhattan |
NYPL |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reinstallation of four artworks by Clemente Spampinato, Walt Whitman Library, 93 Saint Edwards Street, Brooklyn |
Brooklyn |
BPL |
Preliminary |
|
|
Agenda
Minutes
|