| Construction of a maintenance yard, including prefabricated trailers, storage containers, and adjacent site work, DEP Green Infrastructure Satellite Facility, 62 White Street, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of an addition to the Pump and Power House, reconstruction of the guard house, installation of a digester gas conditioning system adjacent to the Old Power House, and adjacent site work, Coney Island Wastewater Resource Recovery Facility, 2591 Knapp Street, Brooklyn |
Brooklyn |
DEP |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a prototypical comfort station and adjacent site work, Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Construction of a prototypical comfort station and adjacent site work, Seaside Wildlife Nature Park, Nelson Avenue and Tennyson Drive, Staten Island |
Staten Island |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of a stoop and fenced-in area, 31 Third Street, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront, Phase III, Kent Avenue between North 9th Street and North 15th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of a conduit support system, Final Settling Tanks, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a sealcoat soccer pitch, P.S. 18, 221 Broadway, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a wireless router and antenna on light poles, Brooklyn, Queens, and Staten Island |
Citywide |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Richmond Hill Road Pump Station, Richmond Hill Road and Richmond Avenue, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Zerega Avenue Pump Station, 2171 Hart Street, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of interim flood protection measures as part of the Battery Park City Resiliency Plan, Battery Park City Ballfields and Community Center, Warren Street, West Street, and Murray Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Corona Health Center, 34-33 Junction Boulevard, Jackson Heights, Queens |
Queens |
DOHMH |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Crown Heights Health Center, 1218 Prospect Place, Brooklyn |
Brooklyn |
DOHMH |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Fort Greene Health Center, 295 Flatbush Avenue Extension, Brooklyn |
Brooklyn |
DOHMH |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Jamaica Health Center, 90-37 Parsons Boulevard, Jamaica, Queens |
Queens |
DOHMH |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of mechanical equipment, Washington Heights Health Center, 600 West 168th Street, Manhattan |
Manhattan |
DOH |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of an ADA ramp, 125th Street Branch Library, 224 East 125th Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a portion of L/CPL Thomas P. Noonan Jr. Playground, including a plaza and dog run, Greenpoint Avenue and 42nd Street, Sunnyside, Queens |
Queens |
DPR |
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Davidson Playground, Davidson Avenue between West 176th Street and West 177th Street, Bronx |
Bronx |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Marcy Green Park, Marcy Avenue between South 3rd Street and Broadway Avenue, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the Inwood Hill Ballfields, Inwood Hill Park, West 214th Street and Seaman Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Temporary installation of Peacock (Short-tailed) (1920) and Peacock (Long-tailed) (1928) by Gaston Lachaise, Bartow Pell Mansion, Pelham Bay Park, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Ericsson Playground, adjacent to M.S. 126, Manhattan Avenue and Leonard Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a cafe addition, storage building, and adjacent site work, McCarren Park House, McCarren Park, between Lorimer Street, Bedford Avenue, and Driggs Avenue, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Reconstruction of a portion of Kelly Playground, adjacent to P.S. 255, East 17th Street and Avenue S, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
Public Hearing |
Agenda
Minutes
|
| Relocation of Charging Bull Relocation by Arturo Di Modica, from Bowling Green to the southeast corner of Broad Street and Wall Street, Manhattan |
Manhattan |
DOT |
Conceptual |
|
Public Hearing |
Agenda
Minutes
|
| Construction of a maintenance yard, including prefabricated trailers, storage containers, and adjacent site work, DEP Green Infrastructure Satellite Facility, 62 White Street, Brooklyn |
Brooklyn |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of an addition to the Pump and Power House, reconstruction of the guard house, installation of a digester gas conditioning system adjacent to the Old Power House, and adjacent site work, Coney Island Wastewater Resource Recovery Facility, 2591 Knapp Street, Brooklyn |
Brooklyn |
DEP |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a prototypical comfort station and adjacent site work, Nameoke Park, Nameoke Avenue and Augustina Avenue, Far Rockaway, Queens |
Queens |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Construction of a prototypical comfort station and adjacent site work, Seaside Wildlife Nature Park, Nelson Avenue and Tennyson Drive, Staten Island |
Staten Island |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of a stoop and fenced-in area, 31 Third Street, Brooklyn |
Brooklyn |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Construction of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront, Phase III, Kent Avenue between North 9th Street and North 15th Street, Brooklyn |
Brooklyn |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Installation of a conduit support system, Final Settling Tanks, Wards Island Wastewater Resource Recovery Facility, Wards Island, Manhattan |
Manhattan |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a sealcoat soccer pitch, P.S. 18, 221 Broadway, Staten Island |
Staten Island |
DOE |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of a wireless router and antenna on light poles, Brooklyn, Queens, and Staten Island |
Citywide |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Richmond Hill Road Pump Station, Richmond Hill Road and Richmond Avenue, Staten Island |
Staten Island |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of flood protection measures as a part of the DEP Wastewater Resiliency Program, Zerega Avenue Pump Station, 2171 Hart Street, Bronx |
Bronx |
DEP |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of interim flood protection measures as part of the Battery Park City Resiliency Plan, Battery Park City Ballfields and Community Center, Warren Street, West Street, and Murray Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Corona Health Center, 34-33 Junction Boulevard, Jackson Heights, Queens |
Queens |
DOHMH |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Crown Heights Health Center, 1218 Prospect Place, Brooklyn |
Brooklyn |
DOHMH |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Fort Greene Health Center, 295 Flatbush Avenue Extension, Brooklyn |
Brooklyn |
DOHMH |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Jamaica Health Center, 90-37 Parsons Boulevard, Jamaica, Queens |
Queens |
DOHMH |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of mechanical equipment, Washington Heights Health Center, 600 West 168th Street, Manhattan |
Manhattan |
DOH |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Installation of Paradise Parados by Teresita Fernandez, Robert W. Wilson Sculpture Terrace at BAM Strong (formerly the Brooklyn Academy of Music Harvey Theater), 651 Fulton Street, Brooklyn |
Brooklyn |
DCLA |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of an ADA ramp, 125th Street Branch Library, 224 East 125th Street, Manhattan |
Manhattan |
DOT |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of a portion of L/CPL Thomas P. Noonan Jr. Playground, including a plaza and dog run, Greenpoint Avenue and 42nd Street, Sunnyside, Queens |
Queens |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Davidson Playground, Davidson Avenue between West 176th Street and West 177th Street, Bronx |
Bronx |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Reconstruction of Ericsson Playground, adjacent to M.S. 126, Manhattan Avenue and Leonard Street, Brooklyn |
Brooklyn |
DPR |
Final |
|
|
Agenda
Minutes
|
| Reconstruction of Marcy Green Park, Marcy Avenue between South 3rd Street and Broadway Avenue, Brooklyn |
Brooklyn |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|
| Reconstruction of the Inwood Hill Ballfields, Inwood Hill Park, West 214th Street and Seaman Avenue, Manhattan |
Manhattan |
DPR |
Preliminary |
|
|
Agenda
Minutes
|
| Temporary installation of Peacock (Short-tailed) (1920) and Peacock (Long-tailed) (1928) by Gaston Lachaise, Bartow Pell Mansion, Pelham Bay Park, Bronx |
Bronx |
DPR |
Preliminary and Final |
|
|
Agenda
Minutes
|