PDC Meeting — 2018-11-14

Agenda PDF · Minutes & Certificates · 129 items

Agenda Items

ProjectBoroughAgencyStageResultSectionDocuments
Construction of a comfort station, M. Fidler Wyckoff House Park, 5914 Clarendon Road, Brooklyn Brooklyn DPR Preliminary Consent Items Agenda
Minutes
Construction of an adult fitness area, St. John's Park, Troy Avenue, Prospect Place, Schenectady Avenue and Bergen Street, Brooklyn Brooklyn DPR Preliminary Consent Items Agenda
Minutes
Construction of a portion of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront master plan, including a lawn area and adjacent site work, Kent Avenue between North 11th Street and North 12th Street, Brooklyn Brooklyn DPR Preliminary Consent Items Agenda
Minutes
Construction of a prototypical comfort station as Phase II of the reconstruction of Fox Playground, Fox Street, 156th Street and Southern Boulevard, Bronx Bronx DPR Final Consent Items Agenda
Minutes
Construction of a prototypical comfort station, Police Officer Edward Byrne Park, 135th Avenue, 134th Street, North Conduit Avenue, and 130th Place, South Ozone Park, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Construction of a trailer, Benjamin Ward Visitor Center, 18-31 Hazen Street, Rikers Island, East Elmhurst, Queens Queens DOC Preliminary and Final Consent Items Agenda
Minutes
Construction of Bay Breeze Park, including a kayak shed, Beach Channel Drive between Old Beach 88th Street and Beach 89th Street, Far Rockaway, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Construction of Building 1A and 1B as Phase I of a master plan for the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx Bronx EDC Final Consent Items Agenda
Minutes
Construction of the Far Rockaway Library, 16-37 Central Avenue, Queens Queens DDC Final Consent Items Agenda
Minutes
Installation of an artwork by Mark Reigelman, Charleston Branch Library of the New York Public Library, Tyrellan Avenue and Bricktown Way, Staten Island Staten Island DCLA% Conceptual Consent Items Agenda
Minutes
Installation of fences, LaGuardia Corner Garden, LaGuardia Place between Bleecker Street and Houston Street, Manhattan Manhattan DPR Preliminary and Final Consent Items Agenda
Minutes
Installation of interim flood protection measures, Conner Street Yard, 3200 Conner Street, Bronx Bronx EM Preliminary and Final Consent Items Agenda
Minutes
Installation of manholes, vent pipe, and overfill signage at the comfort station, Canarsie Park, Seaview Avenue and East 88th Street, Brooklyn Brooklyn DDC Preliminary and Final Consent Items Agenda
Minutes
Installation of manholes, vent pipe, and overfill signage, Brooklyn War Memorial, Cadman Plaza, Tillary Street, Fulton Street, Prospect Street, and Washington Street, Brooklyn Brooklyn DDC Preliminary and Final Consent Items Agenda
Minutes
Installation of mechanical equipment and replacement of the roof, Engine Company 153, 74 Broad Street, Staten Island Staten Island FDNY Preliminary and Final Consent Items Agenda
Minutes
Reconstruction of a bridge bulkhead and parapet, FDR Drive between East 42nd Street and East 49th Street, Manhattan Manhattan DOT Preliminary Consent Items Agenda
Minutes
Reconstruction of a memorial, Olde Towne of Flushing Burial Ground (formerly Martins Field), 46th Avenue between 164th Street and 165th Street, Flushing, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of a play area, Mellett Playground, Avenue V between East 13th Street and East 14th Street, Brooklyn Brooklyn DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of Bridge Playground, Undercliff Avenue, Boscobel Place, and University Avenue, Bronx Bronx DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of Challenge Playground, adjacent to P.S. 811, 251st Street between 61st Avenue and 63rd Avenue, Little Neck, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Preliminary Consent Items Agenda
Minutes
Reconstruction of the Crossroads and Rail Track Walk, High Line Park (formerly elevated rail line), West 30th Street between 10th Avenue and 11th Avenue, Manhattan Manhattan DPR Final Consent Items Agenda
Minutes
Reconstruction of the playground, Poor Richard’s Playground, East 109th Street, Third Avenue, East 108th Street, and Second Avenue, Manhattan Manhattan DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of two entrances to the Riegelmann Boardwalk and adjacent site work (Ocean Dreams), West 35th Street and West 36th Street, Coney Island Beach, Brooklyn Brooklyn DPR Preliminary Consent Items Agenda
Minutes
Rehabilitation of a comfort station, Bayside Playground, Seaside Avenue and Beach Channel Drive, Rockaway Park, Queens Queens DPR Preliminary Consent Items Agenda
Minutes
Temporary removal of Samuel F.B. Morse (1871) by Byron M. Pickett, Central Park, near the entrance at 72nd Street and Fifth Avenue, Manhattan Manhattan DPR Preliminary Consent Items Agenda
Minutes
Reconstruction of a parking lot and installation of a water tank, FDNY Fire Training Academy, 8 Randall’s Island, Manhattan Manhattan FDNY Final Public Hearing Agenda
Minutes
Construction of Combined Sewer Overflow (CSO) Facility, Gowanus Canal, Butler Street, Nevins Street and Degraw Street, Brooklyn Brooklyn DEP Preliminary Public Hearing Agenda
Minutes
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan Manhattan DPR Preliminary and Final Public Hearing Agenda
Minutes
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan Manhattan EDC Preliminary Public Hearing Agenda
Minutes
Construction of a comfort station, M. Fidler Wyckoff House Park, 5914 Clarendon Road, Brooklyn Brooklyn DPR Approved with conditions Agenda
Minutes
Construction of a comfort station, M. Fidler Wyckoff House Park, 5914 Clarendon Road, Brooklyn Brooklyn DPR Preliminary Agenda
Minutes
Construction of a commercial office building (14th@Irving), 124 East 14th Street, Manhattan Manhattan EDC Commented Agenda
Minutes
Construction of a field house and adjacent site work (Sportime), One Randall's Island, Manhattan Manhattan DPR Commented Agenda
Minutes
Construction of an ADA entrance, Grand Concourse Branch Library, 155 East 173rd Street, Bronx Bronx DDC Commented Agenda
Minutes
Construction of an adult fitness area, St. John's Park, Troy Avenue, Prospect Place, Schenectady Avenue and Bergen Street, Brooklyn Brooklyn DPR Approved Agenda
Minutes
Construction of an adult fitness area, St. John's Park, Troy Avenue, Prospect Place, Schenectady Avenue and Bergen Street, Brooklyn Brooklyn DPR Preliminary Agenda
Minutes
Construction of an entrance pavilion, elevators, and an observation deck, 1475 Broadway (One Times Square), Manhattan Manhattan DOT Commented Agenda
Minutes
Construction of a performance space and shade structure, Rockaway Beach, Shore Front Parkway between Beach 94th Street and Beach 95th Street, Far Rockaway, Queens Queens DPR Commented Agenda
Minutes
Construction of a plaza and streetscape improvements at Long Island University, Fleet Street, Willoughby Street, and Ashland Place, Brooklyn Brooklyn DOT Commented Agenda
Minutes
Construction of a portion of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront master plan, including a lawn area and adjacent site work, Kent Avenue between North 11th Street and North 12th Street, Brooklyn Brooklyn DPR Preliminary Agenda
Minutes
Construction of a portion of Bushwick Inlet Park as part of the Greenpoint and Williamsburg waterfront master plan, including a lawn area and adjacent site work, Kent Avenue between North 11th Street and North 12th Street, Brooklyn Brooklyn DPR Approved Agenda
Minutes
Construction of a prototypical comfort station as Phase II of the reconstruction of Fox Playground, Fox Street, 156th Street and Southern Boulevard, Bronx Bronx DPR Final Agenda
Minutes
Construction of a prototypical comfort station as Phase II of the reconstruction of Fox Playground, Fox Street, 156th Street and Southern Boulevard, Bronx Bronx DPR Approved Agenda
Minutes
Construction of a prototypical comfort station, Police Officer Edward Byrne Park, 135th Avenue, 134th Street, North Conduit Avenue, and 130th Place, South Ozone Park, Queens Queens DPR Approved with conditions Agenda
Minutes
Construction of a prototypical comfort station, Police Officer Edward Byrne Park, 135th Avenue, 134th Street, North Conduit Avenue, and 130th Place, South Ozone Park, Queens Queens DPR Preliminary Agenda
Minutes
Construction of a salt shed, 639 West 55th Street, Manhattan Manhattan DSNY Commented Agenda
Minutes
Construction of a substation and inverter and adjacent site work, Queens Central Repair Shop, 52-35 58th Street, Woodside, Queens Queens DSNY Commented Agenda
Minutes
Construction of a trailer, Benjamin Ward Visitor Center, 18-31 Hazen Street, Rikers Island, East Elmhurst, Queens Queens DOC Preliminary and Final Agenda
Minutes
Construction of a trailer, Benjamin Ward Visitor Center, 18-31 Hazen Street, Rikers Island, East Elmhurst, Queens Queens DOC Approved Agenda
Minutes
Construction of a truck weigh station, compost structures, and adjacent site work, 450 West Service Road, Staten Island Staten Island DSNY Found incomplete Agenda
Minutes
Construction of Bay Breeze Park, including a kayak shed, Beach Channel Drive between Old Beach 88th Street and Beach 89th Street, Far Rockaway, Queens Queens DPR Approved Agenda
Minutes
Construction of Bay Breeze Park, including a kayak shed, Beach Channel Drive between Old Beach 88th Street and Beach 89th Street, Far Rockaway, Queens Queens DPR Preliminary Agenda
Minutes
Construction of Box Street Park, including a prototypical comfort station, Commercial Street, Box Street, and Newtown Creek, Brooklyn Brooklyn EDC Commented Agenda
Minutes
Construction of Building 1A and 1B as Phase I of a master plan for the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx Bronx EDC Approved with conditions Agenda
Minutes
Construction of Building 1A and 1B as Phase I of a master plan for the construction of four mixed-use residential towers, a light manufacturing facility, a central plaza open space, and adjacent site work (The Peninsula), Tiffany Street, Spofford Avenue, and Manida Street, Bronx Bronx EDC Final Agenda
Minutes
Construction of Combined Sewer Overflow (CSO) Facility, Gowanus Canal, Butler Street, Nevins Street and Degraw Street, Brooklyn Brooklyn DEP Approved with conditions Agenda
Minutes
Construction of Combined Sewer Overflow (CSO) Facility, Gowanus Canal, Butler Street, Nevins Street and Degraw Street, Brooklyn Brooklyn DEP Preliminary Agenda
Minutes
Construction of the 40th Police Precinct and adjacent site work, East 149th Street and St. Ann's Avenue, Bronx Bronx DDC Commented Agenda
Minutes
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan Manhattan EDC Preliminary Agenda
Minutes
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan Manhattan DPR Preliminary and Final Agenda
Minutes
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan Manhattan EDC Approved with conditions Agenda
Minutes
Construction of the East Midtown Greenway, including reconstruction of Sutton Place Park and construction of a pedestrian bridge at East 54th Street, East River between East 53rd Street and East 61st Street, Manhattan Manhattan DPR Approved Agenda
Minutes
Construction of the Far Rockaway Library, 16-37 Central Avenue, Queens Queens DDC Approved with conditions Agenda
Minutes
Construction of the Far Rockaway Library, 16-37 Central Avenue, Queens Queens DDC Final Agenda
Minutes
Design of an identity and branding system for use citywide Citywide DPR Found incomplete Agenda
Minutes
Design of electric vehicle charging stations for installation citywide Citywide DOT Commented Agenda
Minutes
Installation of a distinctive sidewalk, 149 York Avenue, Staten Island Staten Island DOT Commented Agenda
Minutes
Installation of a distinctive sidewalk, 284 Heberton Avenue, Staten Island Staten Island DOT Commented Agenda
Minutes
Installation of a distinctive sidewalk, 290 Heberton Avenue, Staten Island Staten Island DOT Commented Agenda
Minutes
Installation of an artwork by Mark Reigelman, Charleston Branch Library of the New York Public Library, Tyrellan Avenue and Bricktown Way, Staten Island Staten Island DCLA% Conceptual Agenda
Minutes
Installation of an artwork by Mark Reigelman, Charleston Branch Library of the New York Public Library, Tyrellan Avenue and Bricktown Way, Staten Island Staten Island DCLA% Approved with conditions Agenda
Minutes
Installation of a prototypical newsstand, 160 Madison Avenue, northwest corner of Madison Avenue and East 32nd Street, Manhattan Manhattan DCA Commented Agenda
Minutes
Installation of a prototypical newsstand, 200 West 65th Street, southwest corner of Amsterdam Avenue and West 65th Street, Manhattan Manhattan DCA Commented Agenda
Minutes
Installation of a rooftop exhaust fan and ladder, Marvin Feldman Center, Fashion Institute of Technology, 227 West 27th Street, Manhattan Manhattan DOE Commented Agenda
Minutes
Installation of eleven distance markers, Canarsie Park, between Seaview Avenue and the Shore Belt Parkway, Brooklyn Brooklyn DPR Found incomplete Agenda
Minutes
Installation of eleven mile markers, Silver Lake Park, Staten Island Staten Island DPR Found incomplete Agenda
Minutes
Installation of fences, LaGuardia Corner Garden, LaGuardia Place between Bleecker Street and Houston Street, Manhattan Manhattan DPR Preliminary and Final Agenda
Minutes
Installation of fences, LaGuardia Corner Garden, LaGuardia Place between Bleecker Street and Houston Street, Manhattan Manhattan DPR Approved Agenda
Minutes
Installation of four distance markers, Marine Park, Filmore Avenue, East 33rd Street, Avenue U, and Stuart Street, Brooklyn Brooklyn DPR Found incomplete Agenda
Minutes
Installation of interim flood protection measures, Conner Street Yard, 3200 Conner Street, Bronx Bronx EM Preliminary and Final Agenda
Minutes
Installation of interim flood protection measures, Conner Street Yard, 3200 Conner Street, Bronx Bronx EM Approved Agenda
Minutes
Installation of manholes, vent pipe, and overfill signage at the comfort station, Canarsie Park, Seaview Avenue and East 88th Street, Brooklyn Brooklyn DDC Approved Agenda
Minutes
Installation of manholes, vent pipe, and overfill signage at the comfort station, Canarsie Park, Seaview Avenue and East 88th Street, Brooklyn Brooklyn DDC Preliminary and Final Agenda
Minutes
Installation of manholes, vent pipe, and overfill signage, Brooklyn War Memorial, Cadman Plaza, Tillary Street, Fulton Street, Prospect Street, and Washington Street, Brooklyn Brooklyn DDC Preliminary and Final Agenda
Minutes
Installation of manholes, vent pipe, and overfill signage, Brooklyn War Memorial, Cadman Plaza, Tillary Street, Fulton Street, Prospect Street, and Washington Street, Brooklyn Brooklyn DDC Approved Agenda
Minutes
Installation of mechanical equipment and replacement of the roof, Engine Company 153, 74 Broad Street, Staten Island Staten Island FDNY Approved Agenda
Minutes
Installation of mechanical equipment and replacement of the roof, Engine Company 153, 74 Broad Street, Staten Island Staten Island FDNY Preliminary and Final Agenda
Minutes
Installation of prototypical newsstand, 855 6th Avenue, southwest corner of 6th Avenue and West 31st Street, Manhattan Manhattan DCA Commented Agenda
Minutes
Installation of rooftop mechanical equipment, Brooklyn Wholesale Meat Market, 5600 1st Avenue, between 54th Street and 56th Street, Brooklyn Brooklyn EDC Commented Agenda
Minutes
Installation of security bollards, St. Patrick’s Cathedral, 14 East 51st Street, Fifth Avenue between East 50th Street and East 51st Street, Manhattan Manhattan DDC Commented Agenda
Minutes
Installation of seven distance markers, Soundview Park, Lafayette Avenue, Colgate Avenue, the Bronx River, and Morrison Avenue, Bronx Bronx DPR Found incomplete Agenda
Minutes
Installation of seventeen distance markers, Inwood Hill Park, between West 207th Street and Spuyten Duyvil Creek, west of Seaman Avenue and Indian Road, Manhattan Manhattan DPR Found incomplete Agenda
Minutes
Installation of seventeen mile markers, Crotona Park, Bronx Bronx DPR Found incomplete Agenda
Minutes
Reconstruction of a bridge bulkhead and parapet, FDR Drive between East 42nd Street and East 49th Street, Manhattan Manhattan DOT Preliminary Agenda
Minutes
Reconstruction of a bridge bulkhead and parapet, FDR Drive between East 42nd Street and East 49th Street, Manhattan Manhattan DOT Approved with conditions Agenda
Minutes
Reconstruction of a DOT municipal parking garage, 105-113 Essex Street and 112-120 Ludlow Street between Delancey Street and Rivington Street, Manhattan Manhattan DDC Commented Agenda
Minutes
Reconstruction of a memorial, Olde Towne of Flushing Burial Ground (formerly Martins Field), 46th Avenue between 164th Street and 165th Street, Flushing, Queens Queens DPR Preliminary Agenda
Minutes
Reconstruction of a memorial, Olde Towne of Flushing Burial Ground (formerly Martins Field), 46th Avenue between 164th Street and 165th Street, Flushing, Queens Queens DPR Approved Agenda
Minutes
Reconstruction of an entrance and adjacent site work, Madison Square Park, Broadway, and 24th Street, Manhattan Manhattan DPR Commented Agenda
Minutes
Reconstruction of a parking lot and installation of a water tank, FDNY Fire Training Academy, 8 Randall’s Island, Manhattan Manhattan FDNY Approved Agenda
Minutes
Reconstruction of a parking lot and installation of a water tank, FDNY Fire Training Academy, 8 Randall’s Island, Manhattan Manhattan FDNY Final Agenda
Minutes
Reconstruction of a play area, Mellett Playground, Avenue V between East 13th Street and East 14th Street, Brooklyn Brooklyn DPR Approved Agenda
Minutes
Reconstruction of a play area, Mellett Playground, Avenue V between East 13th Street and East 14th Street, Brooklyn Brooklyn DPR Preliminary Agenda
Minutes
Reconstruction of Bridge Playground, Undercliff Avenue, Boscobel Place, and University Avenue, Bronx Bronx DPR Approved Agenda
Minutes
Reconstruction of Bridge Playground, Undercliff Avenue, Boscobel Place, and University Avenue, Bronx Bronx DPR Preliminary Agenda
Minutes
Reconstruction of Challenge Playground, adjacent to P.S. 811, 251st Street between 61st Avenue and 63rd Avenue, Little Neck, Queens Queens DPR Approved Agenda
Minutes
Reconstruction of Challenge Playground, adjacent to P.S. 811, 251st Street between 61st Avenue and 63rd Avenue, Little Neck, Queens Queens DPR Preliminary Agenda
Minutes
Reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Approved with conditions Agenda
Minutes
Reconstruction of streetscapes and installation of amusement rides (Coney East), West 16th Street, West 15th Street, Stillwell Avenue, West 12th Street, Surf Avenue, and the Riegelmann Boardwalk, Brooklyn Brooklyn EDC Preliminary Agenda
Minutes
Reconstruction of the Crossroads and Rail Track Walk, High Line Park (formerly elevated rail line), West 30th Street between 10th Avenue and 11th Avenue, Manhattan Manhattan DPR Final Agenda
Minutes
Reconstruction of the Crossroads and Rail Track Walk, High Line Park (formerly elevated rail line), West 30th Street between 10th Avenue and 11th Avenue, Manhattan Manhattan DPR Approved Agenda
Minutes
Reconstruction of the entrance plaza and promenade, Manhattan Beach Park, Oriental Boulevard between Girard Street and Irwin Street, Brooklyn Brooklyn DPR Commented Agenda
Minutes
Reconstruction of the Kew Gardens Hills Community Library, including the construction of an addition, 72-33 Vleigh Place, Queens Queens DDC Commented Agenda
Minutes
Reconstruction of the playground, Poor Richard’s Playground, East 109th Street, Third Avenue, East 108th Street, and Second Avenue, Manhattan Manhattan DPR Approved Agenda
Minutes
Reconstruction of the playground, Poor Richard’s Playground, East 109th Street, Third Avenue, East 108th Street, and Second Avenue, Manhattan Manhattan DPR Preliminary Agenda
Minutes
Reconstruction of the playground, Thomas Jefferson Park, First Avenue between East 111th Street and East 114th Street, Manhattan Manhattan DPR Withdrawn Agenda
Minutes
Reconstruction of the World's Fair Marina, Flushing Meadows Corona Park, Corona, Queens Queens DPR Commented Agenda
Minutes
Reconstruction of two entrances to the Riegelmann Boardwalk and adjacent site work (Ocean Dreams), West 35th Street and West 36th Street, Coney Island Beach, Brooklyn Brooklyn DPR Preliminary Agenda
Minutes
Reconstruction of two entrances to the Riegelmann Boardwalk and adjacent site work (Ocean Dreams), West 35th Street and West 36th Street, Coney Island Beach, Brooklyn Brooklyn DPR Approved with conditions Agenda
Minutes
Rehabilitation of a comfort station, Banneker (P.S. 256) Playground, Marcy Avenue between Lafayette Avenue and Kosciusko Street, Brooklyn Brooklyn DPR Commented Agenda
Minutes
Rehabilitation of a comfort station, Bayside Playground, Seaside Avenue and Beach Channel Drive, Rockaway Park, Queens Queens DPR Approved Agenda
Minutes
Rehabilitation of a comfort station, Bayside Playground, Seaside Avenue and Beach Channel Drive, Rockaway Park, Queens Queens DPR Preliminary Agenda
Minutes
Rehabilitation of a comfort station, Tilden Playground, East 48th Street, East 49th Street and Tilden Avenue, Brooklyn Brooklyn DPR Commented Agenda
Minutes
Rehabilitation of the Boiler Building (formerly the Heating Plant), East Road between 1st Drive and 2nd Drive, Wards Island Wastewater Treatment Plant, Manhattan Manhattan DEP Commented Agenda
Minutes
Rehabilitation of the pier over John Finley Walk, Brearley School, 610 East 83rd Street, Manhattan Manhattan DCAS Commented Agenda
Minutes
Replacement of digester tank covers and adjacent site work, 26th Ward Water Pollution Control Plant, 12266 Flatlands Avenue, Brooklyn Brooklyn DEP Commented Agenda
Minutes
Temporary removal of Samuel F.B. Morse (1871) by Byron M. Pickett, Central Park, near the entrance at 72nd Street and Fifth Avenue, Manhattan Manhattan DPR Preliminary Agenda
Minutes
Temporary removal of Samuel F.B. Morse (1871) by Byron M. Pickett, Central Park, near the entrance at 72nd Street and Fifth Avenue, Manhattan Manhattan DPR Approved with conditions Agenda
Minutes
Back to Meetings