| Conservation of Abstraction (1942) by Albert Swinden, previously located in Day Room B-41, Coler-Goldwater Specialty Care Hospital and Nursing Facility, Roosevelt Island, Manhattan |
|
|
Final |
|
Consent Items |
Agenda
Minutes
|
| Conservation of Abstraction (1942) by Joseph Rugolo, previously located in Day Room B-31, Coler-Goldwater Specialty Care Hospital and Nursing Facility, Roosevelt Island, Manhattan |
|
|
Final |
|
Consent Items |
Agenda
Minutes
|
| Construction of High Line Park (formerly elevated rail line), Phase IV, West 30th Street between 10th Avenue and 11th Avenue, Manhattan |
|
|
Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a hoist and roll down gate, 569 West Street, Manhattan |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of an arch (Brooklyn-Chaoyang Friendship Archway), 8th Avenue between 60th Street and 61st Street, Brooklyn |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of antennae and remote radio heads, Richmond County Bank Ballpark at St. George (St. George Station), north of the Staten Island Ferry Terminal, Staten Island |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of a system-wide signage program, Brooklyn Public Library, Borough-wide |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood barriers, Coney Island Hospital, 2601 Ocean Parkway, Brooklyn |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood barriers, Hunts Point Food Distribution Center, 355 Food Center Drive, Bronx |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of flood barriers, Hunts Point Water Pollution Control Plant, East River near Halleck Road and Ryawa Avenue, Bronx |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, Brighton Beach Public Library, 16 Brighton First Road, Brooklyn |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, Flatlands Library, 2065 Flatbush Avenue, Brooklyn |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, Ulmer Park Library, 2602 Bath Avenue, Brooklyn |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of prototypical signage, Windsor Terrace Branch Library, 160 East 5th Street, Brooklyn |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage, High Line Park (formerly elevated rail line), Phase IV, West 30th Street between 10th Avenue and 11th Avenue, Manhattan |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of signage, P.S. 204, 8101 15th Avenue, Brooklyn |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Installation of slope stabilization measures, adjacent to the spillway bridge, Croton Falls Dam, Hemlock Dam Road, Carmel, Putnam County |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of a stair and installation of an ADA lift, 95 Morton Street, Barrow Street at Washington Street, Manhattan |
|
|
Preliminary and Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Black Rock Playground, adjacent to P.S. 119, Blackrock Avenue, Virginia Avenue, Watson Avenue, and Pugsley Avenue, Bronx |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Lafayette Playground, Stillwell Avenue, Benson Avenue, and Bay 43rd Street, Brooklyn |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Newport Playground, adjacent to P.S. 41, Riverdale Avenue between Thatford Avenue and Osborn Street, Brooklyn |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the Baldor Special Foods distribution facility and adjacent site work, 155 Food Center Drive, Bronx |
|
|
Final |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of the Riverside Skate Park, Riverside Park and West 108th Street, Manhattan |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Reconstruction of Walton Playground, East 181st Street and Walton Avenue, Bronx |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Relocation of Abstraction (1942) by Albert Swinden, from Day Room B-41, Coler-Goldwater Specialty Care Hospital and Nursing Facility, to the Master Studio, corporate co-location building, Cornell University/Technion-Israel Institute of Technology’s applied sciences campus, 11 East Loop Road, Roosevelt Island, Manhattan |
|
|
Preliminary |
|
Consent Items |
Agenda
Minutes
|
| Installation of an automated material handler (AMH), Ozone Park Community Library, 92-24 Rockaway Boulevard, Queens |
|
|
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|
| Installation of a prototypical newsstand, northeast corner of East 47th Street and Madison Avenue (270 Park Avenue), Manhattan |
|
|
Preliminary and Final |
|
Public Hearing |
Agenda
Minutes
|